CSF- 66
OSI 613/615
Old Fairburn Road @ Union Road
Tier 1
Operation and Safety Improvements
TSPLOST
City of South Fulton
Construction
NULL
The current construction project will include the addition of two circular roundabouts to address congestion and reduce the severity of accidents at this intersection. Additional improvements include drainage, 24-inch curb & gutter, 24-inch stamp concrete beauty strip, streetlights, and 5' wide sidewalks. The extent of the project will extend approximately 500 feet each route direction from each roundabout. The roundabouts are approximately 900 feet apart. A 400 ft’ section of Old Fairburn Road will be removed as part of the realignment. Due to the proximity, this project is being delivered as a single construction project along with OSI 615 Stonewall Tell Road @ Union Road. Streetlights will also be added within the project limits
NULL
American Engineers, Inc
March, 2023
December, 2020
May, 2027
May, 2027
Sales Tax
$4,279,207
$1,446,683
$2,832,524
Green
Green
Active
roussan.francois@cityofsouthfultonga.gov
2017
2026-09-18 12:26:22
NULL
NULL
NULL