CSF- 56
OSI 602
Butner Road @ Union Road
Tier 1
Operation and Safety Improvements
TSPLOST
City of South Fulton
Completed
NULL
This construction project at the Stop-controlled intersection at Butner Road and Union Road will build a single-lane roundabout to address a sharp angle intersection skew, congestion and reduce the severity of accidents at this intersection. Additional improvements with this project include improving storm drainage with a typical section consisting of a 2.5-ft. curb & gutter, 2-ft. stamped concrete beauty strip, and 5-ft. wide sidewalks throughout the project limits. The extent of construction is approximately 950 ft. along Butner Road and 800 ft. along Union Road
NULL
American Engineers, Inc
March, 2023
December, 2019
May, 2025
May, 2025
Sales Tax
$3,641,163
$3,641,163
$0
Green
Green
Active
roussan.francois@cityofsouthfultonga.gov
2017
2026-09-18 11:32:03
NULL
NULL