CSF- 52
RST 200
Camp Creek Village (SFR), (LL 73 Dist 14FF)
Tier 1
Maintenance and Safety Enhancements
TSPLOST
City of South Fulton
Completed
NULL
The primary work is to resurface the final asphalt topping layer. The roads (Zultana and zoya) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work includes all necessary preparation work (e.g., full depth patching and a single surface treatment). The roads will then have the final asphalt topping layer installed in a manner that will provide uniformity of the asphalt. Milling of the existing asphalt surface is not expected to be required for these roadways.
E R Snell
Not Applicable
Not Applicable
March, 2018
August, 2018
Not Applicable
Sales Tax
$44,140
$49,491
$-5,351
Red
Green
Active
roussan.francois@fultoncountyga.gov
2017
2021-05-03 20:30:27
NULL
NULL
NULL