CSF- 51
B 500
Butner Road over Camp Creek
Tier 1
Bridges
TSPLOST
City of South Fulton
Design
NULL
The proposed Butner Road over Camp Creek includes improvements to the bridge that will extend to the Camp Creek Parkway edge of pavement on the south leg of the intersection. A new bridge is proposed to replace the existing near the Butner Road/Camp Creek Parkway intersection. The proposed bridge will be wide enough to accommodate two traffic lanes of 24-ft wide, 30'' curb and gutter and 12-ft wide pedestrian sidewalk on the west side to tie into a proposed multi-use trail off the bridge and 6-ft wide sidewalk on the east side. A turning lane will be designed off the bridge to finish free flow and stacking length up to the intersection with Camp Creek Parkway.
NULL
William-Russell & Johnson
December, 2022
April, 2020
September, 2024
NULL
Sales Tax
$1,600,000
$61,911
$1,538,089
Green
Green
Active
roussan.francois@fultoncountyga.gov
2019
2023-03-05 00:19:21
NULL
NULL
NULL