CSF- 194
NULL
Derrick Road
Tier 1
Quick Response
TSPLOST
City of South Fulton
Completed
NULL
Derrick Road to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled.
NULL
NULL
NULL
March, 2019
August, 2019
NULL
Sales Tax
$0
$169,219
$-169,219
Green
Green
Active
roussan.francois@fultoncountyga.gov
2018
2021-05-03 17:02:54
NULL
NULL
NULL