ALP- 37
C1932
ACADEMY STREET BIKE/PED/OPERATIONAL IMPROVEMENTS
Tier 1
Operation and Safety Improvements
TSPLOST
Alpharetta
Design
This is one of two projects which evolved from the conceptual design work and community meetings comprising the "Academy Street/Webb Bridge Road: Bike/Ped/Operational Improvements - TSPLOST Project". The project limits are from Loxford Lane to Fire Station 81. Improvements will include: (1) The installation of a 6'' wide sidewalk with a 2'' grass strip along the north side of Academy Street to fill the gap between Alpharetta Presbyterian Church. The existing sidewalk along the south side will be maintained though limited portions may require reconstruction. (2) The installation of a 3'' striped shoulder to accommodate bicycles in both directions of travel from Loxford Lane to Wedgewood Drive. (3) The installation of left turn lanes between Loxford Lane and Wedgewood Drive where possible and the installation of landscaped medians between Loxford Lane and Wedgewood Drive where possible. The existing right-turn lanes at Dancliff Lane and Jamestown Trail will remain.
NULL
Pond & Company
August, 2020
NULL
NULL
NULL
Sales Tax
$289,575
$275,490
$14,085
Green
Yellow
Active
psewczwicz@alpharetta.ga.us
NULL
2021-10-13 13:10:33
NULL
NULL
NULL