ALP- 36
C1933
WEBB BRIDGE ROAD BIKE/PED/OPERATIONAL IMPROVEMENTS
Tier 1
Operation and Safety Improvements
TSPLOST
Alpharetta
Design
This is one of two projects which evolved from the conceptual design work and community meetings comprising the "Academy Street/Webb Bridge Road: Bike/Ped/Operational Improvements - TSPLOST Project". The project limits are from the Big Creek Greenway crossing to Webb Bridge Way. Improvements include: (1) The installation of 8'' wide sidewalks along both sides of Webb Bridge Road. (2) The installation of 4'' bike lanes in both directions of travel along Webb Bridge Road. (3) A 3'' wide "beauty" strip will be provided on each side of Webb Bridge Road between the sidewalk and curb line. 5''x5'' tree wells/grates will be incorporated into this area and adjacent sidewalk. (4) The evaluation of a single-lane roundabout with slip lanes at the intersection with Southlake Drive / Park Bridge Park way. (5) The installation of a single-lane roundabout at the intersection with Webb Bridge Way. (6) The installation of pedestrian lighting along both sides of Webb Bridge Road and roadway lighting at the roundabouts.
NULL
Pond & Company
April, 2021
NULL
NULL
NULL
Sales Tax
$875,796
$814,855
$60,941
Green
Green
Active
psewczwicz@alpharetta.ga.us
NULL
2021-10-13 13:19:05
NULL
NULL
NULL