CSF- 18
RS 375
Ponderosa Pines
Tier 1
Maintenance and Safety Enhancements
TSPLOST
City of South Fulton
Completed
NULL
Bluebonnet Circle, Bluebonnet Court, Bluebonnet Trail and Devilla Court within the subdivision will be resurfaced. The work will include all the necessary preparation work which may include full depth of pavement patching, removal of the top asphalt layer (milling), and a surface treatment prior to final topping. The road will then be resurfaced with a uniform layer of asphalt in manner so as to provide uniformity of depth and a smooth transition to existing. After resurfacing, all existing pavement markings such as line striping, crosswalks etc. will be reinstalled.
NULL
Not Applicable
Not Applicable
NULL
November, 2020
NULL
Sales Tax
$97,695
$81,583
$16,112
Green
Green
Active
roussan.francois@fultoncountyga.gov
2019
2021-05-03 20:02:51
NULL
NULL
NULL