ALP- 60
C2107
North Point Pkwy Corridor
Tier 1
Pedestrian and Bike Improvements
TSPLOST2
Alpharetta
Design
NULL
This is to improve the safety, accessibility, and walkability of pedestrians along the North Point Parkway corridor from Mansell Road to Haynes Bridge Road. Some of the major elements that are considered in this project include reducing the number of travel lanes from 6 to 4 (both sides), 10' curb planter median bioswales, 12' multi-use trail, and 10' planting strip on both sides of the roadway. Also, energy efficient lighting, roadway condition monitoring, and green infrastructure monitoring systems are considered for this project.
TBD
Columbia Engineering
September, 2025
November, 2022
Not Applicable
Not Applicable
Sales Tax
$13,250,000
$2,738,300
$10,511,700
Green
Green
Active
kmcdowell@alpharetta.ga.us
2021
2024-01-09 10:19:35
Georgia
North Point Pkwy
2022-03-31