CSF- 301
P 903
Cascade Road
Tier 1
Pedestrian and Bike Improvements
TSPLOST2
City of South Fulton
Design
NULL
This design project will build up to 3.8 mi. of sidewalk facilities where needed along both sides of Cascade from the Atlanta City Limits to Fulton Industrial Blvd. An Audit was done to determine which locations need this work performed. This project also adds storm drainage facilities. The typical section includes a 2-ft. stamped concrete beauty strip and a 2.5-ft. curb and gutter.
NULL
NULL
March, 2029
March, 2029
June, 2027
June, 2027
Sales Tax
$581,035
$261,979
$319,056
NULL
NULL
Active
roussan.francois@cityofsouthfultonga.gov
2026
2026-09-17 10:30:07
Georgia
Cascade Road
2022-03-31