CSF- 289
B 510 / T 288
Stacks Rd over CSX RR
Tier 1
Bridges
TSPLOST2
City of South Fulton
Design
NULL
This project consists of replacement of bridge structure on Stacks Road over the CSX Railroad. The new bridge will span 200 feet over the CSX railroad tracks below and will have a sidewalk on the south side of the bridge. Sidewalk will be extended along Stacks Road 400 feet to the west and 300 feet to the east.
NULL
American Engineers, Inc.
December, 2023
June, 2024
July, 2028
July, 2028
Sales Tax
$197,332
$108,044
$89,288
NULL
Green
Active
roussan.francois@cityofsouthfultonga.gov
2024
2026-09-17 09:36:40
Georgia
Stacks Rd
2022-03-31