CSF- 283
T 276
Cochran Road over Deep Creek
Tier 1
Bridges
TSPLOST2
City of South Fulton
Land
NULL
The proposed project will replace the bridge carrying Cochran Road over Deep Creek. The project begins 280 ft. south of the existing bridge and ends 280 ft. north of the existing bridge. This project would replace the existing substandard bridge over Deep Creek with a new structure and new roadway approaches. The proposed mainline will consist of two 11Æ-0ö travel lane and curb and gutter in each direction. Sidewalks will be constructed in each direction for the full project length. A 2.0Æ buffer will be provided between the sidewalk and curb.
NULL
Long Engineering
December, 2022
March, 2023
February, 2024
NULL
Sales Tax
$1,530,000
$160,000
$1,370,000
NULL
Yellow
Active
jeff.mueller@cityofsouthfultonga.gov
2023
2023-03-02 20:49:31
Georgia
Cochran Road
2022-03-31