CSF- 147
RS 337
Hallie Hills
Tier 1
Maintenance and Safety Enhancements
TSPLOST
City of South Fulton
Completed
NULL
The roads (Ansted Lane, Butterfield Court, Butterfield Lane, Carisbrook Court, Earlhurst Road, Fox Hall Court, Greenbower Court, Greenbower Lane, Hallie Lane, Hickory Fox Court, Mapledale Lane, Marlborough Circle, Millsboro Lane, Neola Lane, Pennfair Lane, Peppermill Court, Peppermill Lane, Ravencliff Lane, Ravencliff Road, Rimel Lane, Rocky Springs Court, Shoppers Lane, Spicewood Court, Spicewood Court North, Spicewood Court South, Spicewood Lane, Stockdale Court, Turtle Bend Lane, and Winterside Lane) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled.
CW Matthews
Not Applicable
Not Applicable
NULL
November, 2021
NULL
Sales Tax
$733,669
$1,649,962
$-916,293
Green
Green
Active
roussan.francois@fultoncountyga.gov
2021
2023-03-02 14:16:04
NULL
NULL
NULL