CSF- 128
RS 318
Chippewa Forest
Tier 1
Maintenance and Safety Enhancements
TSPLOST
City of South Fulton
Completed
NULL
The roads (Chippewa Court, Chippewa Drive, Oswego Trail, and Owatonna Circle) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled.
NULL
Not Applicable
Not Applicable
NULL
November, 2020
NULL
Sales Tax
$212,630
$240,953
$-28,323
Yellow
Green
Inactive
roussan.francois@fultoncountyga.gov
2019
2021-05-03 19:23:56
NULL
NULL
NULL