The roads (Boulder Ridge Drive, Gwantley Drive, NorthWest Park Drive, Rock ... more
The roads (Boulder Ridge Drive, Gwantley Drive, NorthWest Park Drive, Rock Field Court, South West Park Drive, West Park Drive, Westfield Drive, and Westpark Place) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled.
CWM
NULL
NULL
NULL
November, 2018
NULL
Sales Tax
$482,727
$186,421
$296,306
Gray
Gray
Inactive
cordell.rhymer@fultoncountyga.gov
2018
NULL
NULL
NULL
NULL
FIB- 24
OSI 611
Fulton Industrial Boulevard- Streetscapes and pedestrian upgrades from Fred... more
Fulton Industrial Boulevard- Streetscapes and pedestrian upgrades from Frederick Dr. to MLK Jr. Dr inc. I-20 Interchange Ramps
Tier 1
Operation and Safety Improvements
TSPLOST
Fulton Industrial Blvd.
Completed
A joint project with the Boulevard CID to provide landsscaping and hardscap... more
A joint project with the Boulevard CID to provide landsscaping and hardscaping improvements around the I-20 interchange ramps with Fulton Industrial Boulevard.
PCID
PCID
NULL
NULL
November, 2018
July, 2018
Sales Tax
$1,000,000
$999,969
$31
Green
Green
Active
steve.williams@fultoncountyga.gov
2018
NULL
NULL
NULL
NULL
FIB- 25
OSI 612
Fulton Industrial Boulevard @ Cascade Road
Tier 1
Operation and Safety Improvements
TSPLOST
Fulton Industrial Blvd.
Design
Intersection will be analyzed for traffic improvements including a roundabo... more
Intersection will be analyzed for traffic improvements including a roundabout alternative. Curb & Gutter, drainage, sidewalks, and street lights will be part of the proposed improvements. The intersection improvements will provide geometric and congestion relief.
King Arnold Pedestrian Improvement Project Phase 1
Tier 2
Pedestrian and Bike Improvements
TSPLOST2
Hapeville
Design
King Arnold Streetscape in design Completed S. Central Streetscape (si... more
King Arnold Streetscape in design Completed S. Central Streetscape (sidewalks)
Sol Construction, TBD
keck & Wood
April, 2023
January, 2027
March, 2027
March, 2027
Sales Tax
$892,976
$553,442
$339,534
Gray
Gray
Active
lsudduth@hapeville.org
2026
2026-08-18 10:55:41
Georgia
King Arnold
2022-03-31
HA- 9
NULL
I-85 Soundwall
Tier 1
Roadway Projects
TSPLOST2
Hapeville
Planning
Sound wall on I-85 corridor.
NULL
NULL
January, 2025
May, 2025
December, 2025
November, 2025
Sales Tax
$3,600,000
$0
$3,600,000
Gray
Gray
Inactive
lsudduth@hapeville.org
NULL
2025-09-22 12:15:46
Georgia
City of Hapeville
2022-03-31
JCR- 10
JCR-012
New Location Road in Tech Park
Tier 1
Operation and Safety Improvements
TSPLOST
Johns Creek
Planning
This project will construct a new 2-lane roadway to connect Bell Road to Jo... more
This project will construct a new 2-lane roadway to connect Bell Road to Johns Creek Parkway. This project may include improvements such as sidewalks, trails and, landscaping.
NULL
NULL
NULL
NULL
NULL
NULL
Sales Tax
$2,500,000
$35,836
$2,464,164
Gray
Gray
Inactive
brian.oconnor@johnscreekga.gov
2020
2026-08-17 15:40:12
Georgia
City of Johns Creek
NULL
JCR- 11
JCR-013
State Bridge Widening (Kimball Bridge to Medlock Bridge)
Tier 2
Operation and Safety Improvements
TSPLOST
Johns Creek
Planning
This project will widen State Bridge Road from 4 to 6 lanes between Kimball... more
This project will widen State Bridge Road from 4 to 6 lanes between Kimball Bridge and Medlock Bridge and may include improvements such as sidewalks, trails and landscaping.
Old Alabama Road Capacity (Nesbit Ferry to Old Alabama Connector)
Tier 2
Operation and Safety Improvements
TSPLOST
Johns Creek
Planning
This project will widen Old Alabama Road from Nesbit Ferry Road to Old Alab... more
This project will widen Old Alabama Road from Nesbit Ferry Road to Old Alabama Connector and may include improvements such as sidewalks, trails and landscaping.