WEBB BRIDGE ROAD (NORTH POINT PARKWAY TO GREENWAY)
Tier 1
Operation and Safety Improvements
TSPLOST
Alpharetta
Construction
This project will include the design of a new bridge over Big Creek to repl... more
This project will include the design of a new bridge over Big Creek to replace the existing vehicular and pedestrian bridges and of a 10'' wide multi-use trail with a 6'' wide planting strip along Webb Bridge Road from east of North Point Parkway to the Big Creek Greenway culvert under Webb Bridge Road. Street trees and pedestrian lighting will be provided along the shoulders. The design will seek to preserve the existing streetscape along the frontage of East Gate Subdivision. The new bridge will provide two 10.5'' travel lanes, header curb, 2'' separation (stamped concrete or concrete pavers) and a 10'' multi-use trail. Bike accommodations will be provided on the roadway from east of North Point Parkway to west of the proposed new bridge over Big Creek. At that point, bicyclists will be merged onto the multi-use trails. Refined concept plans and decision matrix were submitted on February 15, 2021. The design team was given direction to move forward with the "Alternate 3" concept based on this information.
Kimball Bridge Rd Widening (Verizon to Georgia Power driveways)
Tier 2
Congestion Relief
TSPLOST2
Alpharetta
Land
The project consists of widening Kimball Bridge Road between Verizon and Ge... more
The project consists of widening Kimball Bridge Road between Verizon and Georgia Power driveways, on the west side of North Point Parkway, to provide a 4-lane section with appropriate pedestrian and bicycle facilities.
Design, right-of-way and construction costs are estimated at $2 million and would be part of a future funding request.
This improvement is on the approved TSPLOST 2 project list and funding may be available through TSPLOST 2 proceeds if revenue trends highlight collections in excess of what is needed to fund the currently appropriated TSPLOST 2 projects (Tier-1).
This project is to perform necessary studies, evaluations, and analysis for... more
This project is to perform necessary studies, evaluations, and analysis for replacement of the existing traffic signal at the intersection of Mayfield Road at Providence Road with a single-lane roundabout. Improved traffic flow and safety benefits are potential advantages of a roundabout compared to the existing traffic signal at this location.
Since this project is a Tier 3 Project in the TSPLSOT Program, projects in Tier 1 are accomplished first prior to moving onto Tier 2 or 3 projects, unless there is a re-allocation of funds or revenue collected permits moving onto the other tiers.
Pedestrian Tunnel under Haynes Bridge Rd at GA 400 (Design Concept)
Tier 3
Pedestrian and Bike Improvements
TSPLOST2
Alpharetta
Design
This project is for the construction of a pedestrian tunnel as part of the ... more
This project is for the construction of a pedestrian tunnel as part of the Alpha Loop trail system under Haynes Bridge Road to connect developments on the northern and southern sides of Haynes Bridge Road. Project is under design, managed by the North Fulton Community Improvement District (NFCID).