Actions Project ID Local ID Project Name Tier Project Type Initiatve Type City Current Stage Description Construction Firm Selected Design Firm Selected Estimated Design Completion Date Estimated Start Date For Project Estimated Construction Completion Date Estimated Substantial Completion Date Link To External Website Primary Funding Source TSPLOST Budget ($) TSPLOST Dollars Spent ($) TSPLOST Dollars Committed (not spent) ($) Cost Status Schedule Status Status Editor Project Year Last Update State Address Creation Date
ALP- 67 C2104 WEBB BRIDGE ROAD (NORTH POINT PARKWAY TO GREENWAY) Tier 1 Operation and Safety Improvements TSPLOST Alpharetta Construction This project will include the design of a new bridge over Big Creek to repl... more
This project will include the design of a new bridge over Big Creek to replace the existing vehicular and pedestrian bridges and of a 10'' wide multi-use trail with a 6'' wide planting strip along Webb Bridge Road from east of North Point Parkway to the Big Creek Greenway culvert under Webb Bridge Road. Street trees and pedestrian lighting will be provided along the shoulders. The design will seek to preserve the existing streetscape along the frontage of East Gate Subdivision. The new bridge will provide two 10.5'' travel lanes, header curb, 2'' separation (stamped concrete or concrete pavers) and a 10'' multi-use trail. Bike accommodations will be provided on the roadway from east of North Point Parkway to west of the proposed new bridge over Big Creek. At that point, bicyclists will be merged onto the multi-use trails. Refined concept plans and decision matrix were submitted on February 15, 2021. The design team was given direction to move forward with the "Alternate 3" concept based on this information.
Excellere Construction LLC Pond & Company February, 2022 NULL NULL NULL http://alpharetta.maps.arcgis.com/apps/MapJournal/index.html?appid=c2930590bb57457b908c8d9ec82caba0§ion=38 Sales Tax $692,508 $382,143 $310,365 Green Green Active psewczwicz@alpharetta.ga.us NULL 2026-03-16 09:52:38 Georgia Webb Bridge Rd 2022-03-31
ALP- 68 C2001 Kimball Bridge Rd Widening (Verizon to Georgia Power driveways) Tier 2 Congestion Relief TSPLOST2 Alpharetta Land The project consists of widening Kimball Bridge Road between Verizon and Ge... more
The project consists of widening Kimball Bridge Road between Verizon and Georgia Power driveways, on the west side of North Point Parkway, to provide a 4-lane section with appropriate pedestrian and bicycle facilities. Design, right-of-way and construction costs are estimated at $2 million and would be part of a future funding request. This improvement is on the approved TSPLOST 2 project list and funding may be available through TSPLOST 2 proceeds if revenue trends highlight collections in excess of what is needed to fund the currently appropriated TSPLOST 2 projects (Tier-1).
Gloson Enterprises AECOM February, 2024 Not Applicable Not Applicable February, 2026 https://cleargov.com/georgia/fulton/city/alpharetta/projects/3807/kimball-bridge-rd-widening-_-verizon-to-georgia-power-driveways-(tsplost_2,-tier_2) Sales Tax $2,000,000 $0 $2,000,000 Gray Green Active imisbach@alpharetta.ga.us 2022 2026-02-11 15:22:38 Georgia Kimball Bridge Rd 2022-03-31
ALP- 69 C3003 Roundabout (Mayfield Rd at Providence Rd) Tier 3 Operation and Safety Improvements TSPLOST2 Alpharetta Planning This project is to perform necessary studies, evaluations, and analysis for... more
This project is to perform necessary studies, evaluations, and analysis for replacement of the existing traffic signal at the intersection of Mayfield Road at Providence Road with a single-lane roundabout. Improved traffic flow and safety benefits are potential advantages of a roundabout compared to the existing traffic signal at this location. Since this project is a Tier 3 Project in the TSPLSOT Program, projects in Tier 1 are accomplished first prior to moving onto Tier 2 or 3 projects, unless there is a re-allocation of funds or revenue collected permits moving onto the other tiers.
TBD TBD Not Applicable Not Applicable Not Applicable Not Applicable https://cleargov.com/georgia/fulton/city/alpharetta/projects/3812/roundabout:-mayfield-rd-at-providence-rd-(tsplost_2,-tier_3) Sales Tax $2,000,000 $0 $2,000,000 Gray Gray Active kmcdowell@alpharetta.ga.us 2022 2024-01-09 10:25:54 Georgia Mayfield Rd at Providence Rd 2022-03-31
ALP- 70 C3005 Milling and Resurfacing Tier 3 Maintenance and Safety Enhancements TSPLOST2 Alpharetta Planning This request is for the on-going maintenance of milling and resurfacing and... more
This request is for the on-going maintenance of milling and resurfacing and preservation of city streets, funded through TSPLOST II.
Allied Paving TBD Not Applicable Not Applicable June, 2023 Not Applicable https://cleargov.com/georgia/fulton/city/alpharetta/projects/3813/milling-and-resurfacing-(tsplost_2,-tier_3) Sales Tax $2,500,000 $0 $2,500,000 Gray Gray Active kmcdowell@alpharetta.ga.us 2022 2023-07-27 11:16:07 Georgia City of Alpharetta 2022-03-31
ALP- 71 C3004 Pedestrian Tunnel under Haynes Bridge Rd at GA 400 (Design Concept) Tier 3 Pedestrian and Bike Improvements TSPLOST2 Alpharetta Design This project is for the construction of a pedestrian tunnel as part of the ... more
This project is for the construction of a pedestrian tunnel as part of the Alpha Loop trail system under Haynes Bridge Road to connect developments on the northern and southern sides of Haynes Bridge Road. Project is under design, managed by the North Fulton Community Improvement District (NFCID).
TBD TBD Not Applicable Not Applicable Not Applicable Not Applicable https://cleargov.com/georgia/fulton/city/alpharetta/projects/3816/alpha-loop:-pedestrian-tunnel-under-haynes-bridge-rd-at-ga-400-(2022-parks-bond) Sales Tax $500,000 $0 $500,000 Gray Gray Active kmcdowell@alpharetta.ga.us 2022 2024-01-09 10:20:57 Georgia Haynes Bridge Rd 2022-03-31
SUM = 92,390,641 SUM = 42,725,912 SUM = 49,664,729