Here you can select the number of cards to be placed in a row for each of supported screen resolutions. Your current resolution is highlighted in this way.
Maintenance and Safety Enhancements in City of East Point -Resurfacing. Bon... more
Maintenance and Safety Enhancements in City of East Point -Resurfacing. Bonnybrooke Way (see EP - 006)
Mullin's Brothers Paving
Griffin & Davis Consulting
January, 2020
April, 2020
November, 2020
November, 2020
Sales Tax
$103,000
$10,300
$92,700
Green
Green
Active
guest
2020
2021-08-17 20:28:26
NULL
NULL
NULL
FA- 10
NULL
E. Broad Street & E. Malone Street Pedestrian Improvements Project
Tier 2
Pedestrian and Bike Improvements
TSPLOST
Fairburn
Completed
Pedestrian Improvements on E. Broad Street & E. Malone Street near Landmark... more
Pedestrian Improvements on E. Broad Street & E. Malone Street near Landmark Christain School.
BOSS Concrete
Design-Build
April, 2018
August, 2018
November, 2018
October, 2018
Sales Tax
$32,354
$32,354
$0
Green
Green
Active
anthony.belcher@fairburn.com
2018
2025-08-01 07:44:59
GA
E. Broad St.
NULL
FA- 11
18-011
Renaissance Parkway Extension Project
Tier 3
Congestion Relief
TSPLOST
Fairburn
Completed
Renaissance Parkway Roadway Extension Roadway project designed to provide c... more
Renaissance Parkway Roadway Extension Roadway project designed to provide congestiion relief to SR 74/Senoia Road.
AMCON Construction
Harris-Gray, LLC
August, 2018
March, 2019
December, 2019
November, 2019
Sales Tax
$87,611
$87,611
$0
Green
Green
Active
lthompson@fairburn.com
2019
2021-09-08 19:24:28
NULL
NULL
NULL
FA- 12
19-002
Roadway Improvements on Various City Roads Project
Tier 1
Maintenance and Safety Enhancements
TSPLOST
Fairburn
Completed
City-Wide Resurfacing, 2019 Roadway Improvements on Various City Roads Proj... more
City-Wide Resurfacing, 2019 Roadway Improvements on Various City Roads Project
Shepco Paving, Inc.
In-House
June, 2023
August, 2019
December, 2019
December, 2019
Sales Tax
$544,894
$463,461
$81,433
Green
Green
Active
lthompson@fairburn.com
2019
2020-12-17 13:31:23
NULL
NULL
NULL
FA- 13
20-004
Howell Avenue Extension Roadway Project
Tier 1
Roadway Projects
TSPLOST
Fairburn
Completed
T-SPLOST Roadway Project designed to provide connectivity between Bohannon ... more
T-SPLOST Roadway Project designed to provide connectivity between Bohannon Road and SR74/Senoia Road, an alternative route for motorists (trucks), and to open up parcels for future development.
Strack Incorporated
Southeastern Engineering. Inc.
May, 2020
July, 2020
July, 2021
June, 2021
Sales Tax
$4,543,122
$1,872,795
$2,670,327
Green
Green
Active
lthompson@fairburn.com
2020
2021-09-08 19:59:14
NULL
NULL
NULL
FA- 14
20-002
Roadway Improvements on Various City Roads Project
Extension of Park Road to provide a secondary entrance/exit into Clarence D... more
Extension of Park Road to provide a secondary entrance/exit into Clarence Duncan Park.
REBID
IFB: November 12th, 2025
Bid Opening: December 19th, 2025; 18 bids received.
Low bidder: Piedmont Paving, Inc. for $4,566,732.55
NTP: March 16th, 2026
All work associated with the Duncan Park Road Project to be completed within three hundred and sixty (360) calendar days of the NTP.
Piedmont Paving, Inc.
Southeastern Engineering, Inc.
November, 2025
March, 2026
May, 2027
March, 2027
Sales Tax
$722,685
$0
$722,685
Green
Green
Active
lthompson@fairburn.com
2026
2026-08-27 08:24:38
GA
NULL
NULL
FA- 16
21-001
Oakley Industrial Boulevard Full-Depth Reclamation Project Phase II
Tier 1
Roadway Projects
TSPLOST
Fairburn
Completed
The work consists of full depth reclamation, asphalt paving and striping on... more
The work consists of full depth reclamation, asphalt paving and striping on Oakley Industrial Boulevard Road from the deceleration lane of the Solstice Apartment Complex to SR 74 as the base bid. In addition, (Add Alternate #1) Oakley Industrial Boulevard (from SR 74 to SR 92), (Add Alternate #2) Oakley Industrial Boulevard (from SR 92 to Fayetteville Road), (Add Alternate #4) Oakley Industrial Boulevard (from just west of Bohannon Road to Creekwood Road).
C.W.Matthews
Moreland Altobelli Associates, LLC
December, 2020
July, 2021
March, 2022
October, 2021
Sales Tax
$2,609,883
$1,191,210
$1,418,673
Green
Green
Active
lthompson@fairburn.com
2021
2023-03-08 15:55:42
NULL
NULL
NULL
FA- 17
23-003
Rivertown Connector Project
Tier 1
Roadway Projects
TSPLOST
Fairburn
Planning
City of Fairburn Roadway Project design to provide connectivity between Riv... more
City of Fairburn Roadway Project design to provide connectivity between Rivertown Road and Virlyn B. Smith Road.
NULL
SOUTHEASTERN ENGINEERING INC.
April, 2025
May, 2025
August, 2025
July, 2025
Sales Tax
$937,240
$0
$937,240
Gray
Gray
Inactive
lthompson@fairburn.com
2020
2026-08-31 10:12:18
NULL
NULL
NULL
FA- 18
NULL
SR 14/Senoia Road Traffic Signal Project
Tier 1
Quick Response
TSPLOST
Fairburn
Completed
Operation and Safety Improvements in City of Fairburn - To Be Determined
... more
Operation and Safety Improvements in City of Fairburn - To Be Determined
11/10/2020: There are several reasons why the District does not recommend a signal to be installed at this location. The reasons why can be a bit difficult to explain because there is a lot to consider when it comes to signalizing an intersection but basically the intersection does not meet vehicular or pedestrian volume thresholds needed to warrant a signal and the number of correctable crashes also do not meet the necessary threshold to warrant installation of a signal. This intersection seems to be congested during “peak hours” of the day, and all other hours have very little volume. Adding a signal at this location would cause unnecessary delay to the surrounding roadway network that already appears to have signalized intersections that may not be needed.
Josh Montefusco
GDOT, District 7
Traffic Operations Manager
JMontefusco@dot.ga.gov
Revised TE Report submitted to GDOT on 05/02/2025.
If a Pedestrian Hybrid Beacon is the final recommendation, Railroad coordination may not be required.
NULL
Pond & Company
NULL
NULL
NULL
NULL
Sales Tax
$200,000
$15,530
$184,470
Gray
Gray
Active
lthompson@fairburn.com
2020
2026-08-31 10:23:18
NULL
NULL
NULL
FA- 19
20-005
Bohannon Road Sidewalk Project
Tier 2
Pedestrian and Bike Improvements
TSPLOST
Fairburn
Completed
Pedestrian Improvements project designed to provide workers in the area a s... more
Pedestrian Improvements project designed to provide workers in the area a safe route to and from work.
The Corbett Group
Moreland Altobelli Associates, LLC
April, 2020
July, 2020
December, 2020
November, 2020
Sales Tax
$234,488
$23,862
$210,626
Green
NULL
Active
lthompson@fairburn.com
2020
2021-09-08 19:41:40
NULL
NULL
NULL
FA- 20
NULL
Quiet Zone R/R Crossings Project
Tier 2
Operation and Safety Improvements
TSPLOST
Fairburn
Planning
Quiet Zone Railroad Crossings Project
Authorized a Task Order with Pond ... more
Quiet Zone Railroad Crossings Project
Authorized a Task Order with Pond & Company for Quiet Zone Evaluation and Report on December 16, 2025.
Quiet Zone Support Agreement with CSX for $25,300.00 executed on October 7, 2025.
Quiet Zone Field Diagnostic conducted on February 6, 2026.
NULL
Pond & Company
NULL
NULL
NULL
NULL
Sales Tax
$750,000
$0
$750,000
Gray
Gray
Active
lthompson@fairburn.com
2020
2026-08-31 10:13:22
NULL
NULL
NULL
FA- 21
20-001
Pedestrian Improvements on Various City Roads
Tier 2
Pedestrian and Bike Improvements
TSPLOST
Fairburn
Completed
2020 TSPLOST Pedestrian Improvements, Pedestrian Improvements on Various Ci... more
2020 TSPLOST Pedestrian Improvements, Pedestrian Improvements on Various City Roads
Construction 57
In-House
February, 2020
May, 2020
July, 2020
June, 2020
Sales Tax
$182,250
$181,586
$664
Green
Green
Active
lthompson@fairburn.com
2020
2020-12-17 20:45:08
NULL
NULL
NULL
FA- 22
21-004
Roadway Improvements on Various City Roads Project
Tier 1
Maintenance and Safety Enhancements
TSPLOST
Fairburn
Completed
2021 City-Wide Resurfacing
Blount Construction Company, Inc.
In-House
May, 2021
September, 2021
March, 2022
December, 2021
Sales Tax
$1,649,113
$1,061,356
$587,757
Green
Green
Active
lthompson@fairburn.com
2021
2023-03-08 16:13:32
NULL
NULL
NULL
FA- 23
NULL
2022 Roadway Improvement on Various City Roads Project
Tier 1
Maintenance and Safety Enhancements
TSPLOST
Fairburn
Completed
2022 City-Wide Resurfacing Project.
Magnum Paving, LLC
In-House
February, 2022
June, 2022
October, 2022
September, 2022
Sales Tax
$1,802,279
$1,525,031
$277,248
Green
Green
Active
lthompson@fairburn.com
2022
2023-03-08 16:31:05
NULL
NULL
NULL
FA- 24
NULL
Quick Response Project
Tier 3
Quick Response
TSPLOST
Fairburn
Planning
Quick Response Project
NULL
NULL
NULL
NULL
NULL
NULL
Sales Tax
$41,417
$0
$41,417
Gray
Gray
Active
lthompson@fairburn.com
NULL
NULL
NULL
NULL
NULL
FA- 25
20-003
Dodd Street Pedestrian Improvements
Tier 1
Maintenance and Safety Enhancements
TSPLOST
Fairburn
Completed
Streetscape project on Dodd Street in the Lightning Neighborhood. The work ... more
Streetscape project on Dodd Street in the Lightning Neighborhood. The work includes the removal of existing header curb, installation of new header curb, installation of new sidewalk, replacement of existing sidewalk as required, installation of new ADA handicap ramps, the replacement of existing handicap ramps as required, and the installation of concrete sidewalk-header curb-retaining wall combination as required. The scope of the Add Alternate includes milling, asphalt paving, the installation of traffic-print textured paving crosswalks, manhole adjustments and associated tasks.
*It is important to note that TSPLOST dollars were spent on the Add-Alternate only.
The Corbett Group
In-House
April, 2020
June, 2020
December, 2020
November, 2020
Sales Tax
$409,659
$31,449
$378,210
Green
Green
Active
lthompson@fairburn.com
2020
2021-09-09 11:53:10
NULL
NULL
NULL
FA- 26
NULL
Milo Fisher, Bay Street & Grant Street Pedestrian Improvements
Tier 2
Pedestrian and Bike Improvements
TSPLOST
Fairburn
Completed
Extend sidewalk on Milo Fisher to the intersection of Clayton Street, exten... more
Extend sidewalk on Milo Fisher to the intersection of Clayton Street, extend sidewalk on Bay Street to the intersection of Malone Street, install sidewalk on Grant street from Milo Fisher Street to Chestnut Street.
BOSS Concrete Construction, LLC
NULL
March, 2021
April, 2021
June, 2021
May, 2021
Sales Tax
$25,000
$19,977
$5,023
Green
Green
Active
lthompson@fairburn.com
2021
2021-09-09 11:55:01
NULL
NULL
NULL
FA- 27
25-004
City Wide Road Resurfacing
Tier 1
Roadway Projects
TSPLOST2
Fairburn
Completed
The City of Fairburn will accept sealed bids from qualified Contractors for... more
The City of Fairburn will accept sealed bids from qualified Contractors for furnishing all labor, equipment, and materials necessary to complete 4.1 mi of Roadway Improvements ON VARIOUS CITY ROADS Contract #25-004. The work includes milling, temporary traffic control, asphalt paving, manhole adjustments and associated tasks. The scope of Add Alternate #1 consists of the paving of the VETERANS OF FOREIGN WARS (VFW) parking lot located at 1699 Park Rd. Fairburn, GA 30213. All work must be completed within one hundred and twenty (120) calendar days of the Notice to Proceed (NTP).
The first $224,198.83 in project expenditures was paid for with a GDOT LMIG Grant; the second $275,054.39 in project expenditures was paid for with a GDOT Local Road Assistance (LRA) Grant; Add Alternate #1 expenditures ($167,592.18) for paving the Veterans of Foreign Wars (VFW) Parking Lot at Duncan Park was paid for with Capital Improvements Projects funds; and the remaining $1,262,737.92 was paid with TSPLOST Funds. The total project cost total was $1,929,583.32.