Actions Project ID Local ID Project Name Tier Project Type Initiatve Type City Current Stage Description Construction Firm Selected Design Firm Selected Estimated Design Completion Date Estimated Start Date For Project Estimated Construction Completion Date Estimated Substantial Completion Date Link To External Website Primary Funding Source TSPLOST Budget ($) TSPLOST Dollars Spent ($) TSPLOST Dollars Committed (not spent) ($) Cost Status Schedule Status Status Editor Project Year Last Update State Address Creation Date
CSF- 85 SU 705 Flat Shoals Rd at Connel Rd Tier 1 Operation and Safety Improvements TSPLOST City of South Fulton Planning The overall objective of this project is the redesign and reconstruction of... more
The overall objective of this project is the redesign and reconstruction of eleven (11) traffic signals along the Flat Shoals Road corridor to complement the proposed Advanced Traffic Management System (ATMS) along the corridor. Closed Circuit TV (CCTV) cameras will be installed as well as fiber optic drop cables to the cameras and existing traffic signals. Traffic signals will be timed to maintain coordinated traffic flow through the synchronized intersections. The progression of vehicles along the major roadway will be given priority even when the characteristics of the roadway traffic flow and control changes.
NULL NULL NULL July, 2019 NULL NULL Sales Tax $250,000 $0 $250,000 Green Green Active NULL NULL NULL NULL NULL NULL
CSF- 86 SU 706 Flat Shoals Rd at Buffington Rd Tier 1 Operation and Safety Improvements TSPLOST City of South Fulton Planning The overall objective of this project is the redesign and reconstruction of... more
The overall objective of this project is the redesign and reconstruction of eleven (11) traffic signals along the Flat Shoals Road corridor to complement the proposed Advanced Traffic Management System (ATMS) along the corridor. Closed Circuit TV (CCTV) cameras will be installed as well as fiber optic drop cables to the cameras and existing traffic signals. Traffic signals will be timed to maintain coordinated traffic flow through the synchronized intersections. The progression of vehicles along the major roadway will be given priority even when the characteristics of the roadway traffic flow and control changes.
NULL NULL NULL July, 2019 NULL NULL Sales Tax $250,000 $0 $250,000 Green Green Active NULL NULL NULL NULL NULL NULL
CSF- 87 SU 707 Flat Shoals Rd at I -85 North Tier 1 Operation and Safety Improvements TSPLOST City of South Fulton Planning The overall objective of this project is the redesign and reconstruction of... more
The overall objective of this project is the redesign and reconstruction of eleven (11) traffic signals along the flat Shoals Road corridor to complement the proposed ATMS along the corridor. CCTV cameras will be installed as well as fiber optic drop cables to the cameras and existing traffic signals. Traffic signals will be timed to maintain coordinated traffic flow progression through the synchronized intersections. The progression of vehicles along the major roadway will be given priority even when the characteristics of the roadway traffic flow and control changes.
NULL NULL NULL July, 2019 NULL NULL Sales Tax $250,000 $0 $250,000 Green Green Active NULL NULL NULL NULL NULL NULL
CSF- 88 SU 708 Flat Shoals Rd at I -85 South Tier 1 Operation and Safety Improvements TSPLOST City of South Fulton Planning The overall objective of this project is the redesign and reconstruction of... more
The overall objective of this project is the redesign and reconstruction of eleven (11) traffic signals along the Flat Shoals Road corridor to complement the proposed Advanced Traffic Management System (ATMS) along the corridor. Closed Circuit TV (CCTV) cameras will be installed as well as fiber optic drop cables to the cameras and existing traffic signals. Traffic signals will be timed to maintain coordinated traffic flow through the synchronized intersections. The progression of vehicles along the major roadway will be given priority even when the characteristics of the roadway traffic flow and control changes.
NULL NULL NULL July, 2019 NULL NULL Sales Tax $250,000 $0 $250,000 Green Green Active NULL NULL NULL NULL NULL NULL
CSF- 89 SU 709 Flat Shoals Rd at Feldwood Rd Tier 1 Operation and Safety Improvements TSPLOST City of South Fulton Planning The overall objective of this project is the redesign and reconstruction of... more
The overall objective of this project is the redesign and reconstruction of eleven (11) traffic signals along the Flat Shoals Road corridor to complement the proposed Advanced Traffic Management System (ATMS) along the corridor. Closed Circuit TV (CCTV) cameras will be installed as well as fiber optic drop cables to the cameras and existing traffic signals. Traffic signals will be timed to maintain coordinated traffic flow through the synchronized intersections. The progression of vehicles along the major roadway will be given priority even when the characteristics of the roadway traffic flow and control changes.
NULL NULL NULL July, 2019 NULL NULL Sales Tax $250,000 $0 $250,000 Green Green Active NULL NULL NULL NULL NULL NULL
CSF- 9 RC 108 Old Fairburn Road (Union Rd to Camp Creek Pkwy) Tier 1 Maintenance and Safety Enhancements TSPLOST City of South Fulton Completed The Old Fairburn Road (Union Rd to Camp Creek Pkwy) to be resurfaced may ha... more
The Old Fairburn Road (Union Rd to Camp Creek Pkwy) to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled.
E R Snell Not Applicable Not Applicable March, 2018 August, 2018 December, 2017 Sales Tax $606,253 $642,227 $-35,974 Yellow Green Active roussan.francois@fultoncountyga.gov 2017 2021-05-03 16:15:50 NULL NULL NULL
CSF- 90 SU 710 Flat Shoals Rd at Mallory Rd Tier 1 Operation and Safety Improvements TSPLOST City of South Fulton Planning The overall objective of this project is the redesign and reconstruction of... more
The overall objective of this project is the redesign and reconstruction of eleven (11) traffic signals along the Flat Shoals Road corridor to complement the proposed Advanced Traffic Management System (ATMS) along the corridor. Closed Circuit TV (CCTV) cameras will be installed as well as fiber optic drop cables to the cameras and existing traffic signals. Traffic signals will be timed to maintain coordinated traffic flow through the synchronized intersections. The progression of vehicles along the major roadway will be given priority even when the characteristics of the roadway traffic flow and control changes.
NULL NULL NULL July, 2019 NULL NULL Sales Tax $250,000 $0 $250,000 Green Green Active NULL NULL NULL NULL NULL NULL
CSF- 91 ATMS 800 Flat Shoals Road Tier 2 Operation and Safety Improvements TSPLOST City of South Fulton Design The overall objective of this project is the redesign and reconstruction of... more
The overall objective of this project is the redesign and reconstruction of eleven (11) traffic signals along the Flat Shoals Road corridor to complement the proposed Advanced Traffic Management System (ATMS) along the corridor. Closed Circuit TV (CCTV) cameras will be installed as well as fiber optic drop cables to the cameras and existing traffic signals. Traffic signals will be timed to maintain coordinated traffic flow through the synchronized intersections. The progression of vehicles along the major roadway will be given priority even when the characteristics of the roadway traffic flow and control changes.
NULL NULL December, 2021 July, 2021 March, 2023 NULL Sales Tax $1,000,000 $326,837 $673,163 Green Green Active roussan.francois@fultoncountyga.gov 2020 2021-05-03 23:10:11 NULL NULL NULL
CSF- 92 PBI 900 Danforth Road (Rehoboth Circle to Cascade Road) Tier 1 Pedestrian and Bike Improvements TSPLOST City of South Fulton Construction The project scope includes the installation of 5 foot-wide concrete ADA (Am... more
The project scope includes the installation of 5 foot-wide concrete ADA (Americans with Disabilities Act) compliant sidewalks, concrete curb and gutter, a 2- foot stamped concrete, drainage and pedestrian lighting on both sides of Danforth Road from Rehoboth Circle to Cascade Road. The approximate length of the project is 0.8 mile.
CMC, INC AEI September, 2022 February, 2022 December, 2023 NULL Sales Tax $2,250,000 $90,653 $2,159,347 Green Green Active roussan.francois@fultoncountyga.gov 2017 2023-03-06 12:44:33 NULL NULL NULL
CSF- 93 PBI 901 Enon Road (Lynarbor Lane to Sanford J. Jones) Tier 1 Pedestrian and Bike Improvements TSPLOST City of South Fulton Design Proposed project includes sidewalk facilities along both sides of Enon Road... more
Proposed project includes sidewalk facilities along both sides of Enon Road from just north of Lynarbor Lane and extends to Sanford J. Jones Boulevard for a distance of approximately 1.5 miles. Project features include adding 5-6 foot sidewalks along the west side, 8-ft. sidewalks along east side from Lynarbor Lane to Sanford J. Jones Boulevard. Drainage improvements, curb and gutter, and 2-foot stamped concrete is also included.
NULL AAEI March, 2023 September, 2020 June, 2024 NULL Sales Tax $2,000,000 $43,650 $1,956,350 Green Green Active roussan.francois@fultoncountyga.gov 2017 2023-03-06 12:46:48 NULL NULL NULL
CSF- 94 RST 203 Falls @ Cascade Palms Phase 2 Tier 1 Maintenance and Safety Enhancements TSPLOST City of South Fulton Completed The roads (Palmview Court, Smithers Way, Talkeetna Court, Muskeg Court, and... more
The roads (Palmview Court, Smithers Way, Talkeetna Court, Muskeg Court, and Cutbank Court) within the subdivision is to resurface the final asphalt topping layer. The roads within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work includes all necessary preparation work (e.g., full depth patching and a single surface treatment). The roads will then have the final asphalt topping layer installed in a manner that will provide uniformity of the asphalt. The subject subdivison was topped through an earlier contract outside TSPLOST funding.
E R Snell Not Applicable Not Applicable March, 2018 August, 2018 Not Applicable Sales Tax $86,578 $103,523 $-16,945 Red Green Active roussan.francois@fultoncountyga.gov 2017 2021-05-03 20:31:37 NULL NULL NULL
CSF- 95 OSI 600 Bethsaida Road at Creel Road Tier 2 Operation and Safety Improvements TSPLOST City of South Fulton Planning Intersection will include either a roundabout or conventional improvements.... more
Intersection will include either a roundabout or conventional improvements. A conventional improvement includes additional turn lanes and sometimes, if warranted, a signal. Whichever alternative is concluded, sidewalks, street lights, curb & gutter, and drainage will be included.
NULL NULL NULL July, 2021 NULL NULL Sales Tax $1,353,600 $0 $1,353,600 Gray Gray Active NULL NULL NULL NULL NULL NULL
CSF- 96 RST 204 Foxfire PH2, (LL 124/133 Dist 13) Tier 1 Maintenance and Safety Enhancements TSPLOST City of South Fulton Completed The primary work is to resurface the final asphalt topping layer. The roads... more
The primary work is to resurface the final asphalt topping layer. The roads (Grey Fox Way and Polar Fox Ct) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work includes all necessary preparation work (e.g., full depth patching and a single surface treatment). The roads will then have the final asphalt topping layer installed in a manner that will provide uniformity of the asphalt. Milling of the existing asphalt surface is not expected to be required for these roadways.
E R Snell Not Applicable Not Applicable March, 2018 August, 2018 Not Applicable Sales Tax $57,555 $113,654 $-56,099 Red Green Active roussan.francois@fultoncountyga.gov 2017 2021-05-03 20:31:52 NULL NULL NULL
CSF- 97 RST 205 Herron Creek PH2, (LL 99 Dist 14FF, LL 175 Dist 9C) Tier 1 Maintenance and Safety Enhancements TSPLOST City of South Fulton Completed The primary work is to resurface the final asphalt topping layer. The roads... more
The primary work is to resurface the final asphalt topping layer. The roads (Halcyon Dr, Herron Trl, Herron La, Herron Pass, Herron Point, and Herron Trace) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work includes all necessary preparation work (e.g., full depth patching and a single surface treatment). The roads will then have the final asphalt topping layer installed in a manner that will provide uniformity of the asphalt. Milling of the existing asphalt surface is not expected to be required for these roadways.
E R Snell Not Applicable Not Applicable March, 2018 August, 2018 Not Applicable Sales Tax $68,057 $90,131 $-22,074 Red Green Active roussan.francois@fultoncountyga.gov 2017 2021-05-03 20:32:08 NULL NULL NULL
CSF- 98 RST 206 Lake Royale U3, (LL 188 Dist 13) Tier 1 Maintenance and Safety Enhancements TSPLOST City of South Fulton Completed The primary work is to resurface the final asphalt topping layer. The roads... more
The primary work is to resurface the final asphalt topping layer. The roads (Lake Rorale Drive and Lake Royale Pl)) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work includes all necessary preparation work (e.g., full depth patching and a single surface treatment). The roads will then have the final asphalt topping layer installed in a manner that will provide uniformity of the asphalt. Milling of the existing asphalt surface is not expected to be required for these roadways.
E R Snell Not Applicable Not Applicable NULL November, 2017 Not Applicable Sales Tax $43,845 $32,373 $11,472 Green Green Active roussan.francois@fultoncountyga.gov 2017 2021-05-03 20:32:26 NULL NULL NULL
CSF- 99 RST 207 Le Jardin Multiple Phases Tier 1 Maintenance and Safety Enhancements TSPLOST City of South Fulton Completed The primary work is to resurface the final asphalt topping layer. The roads... more
The primary work is to resurface the final asphalt topping layer. The roads (Artistry Way, Botanica Way, Butchart Pl, Concerto Ct, Le Jardin Blvd, Les Fleurs La, Matisse Lane, Queen Ann Cage Ct, and Tapestry Club Dr) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work includes all necessary preparation work (e.g., full depth patching and a single surface treatment). The roads will then have the final asphalt topping layer installed in a manner that will provide uniformity of the asphalt. Milling of the existing asphalt surface is not expected to be required for these roadways.
E R Snell Not Applicable Not Applicable March, 2018 August, 2018 Not Applicable Sales Tax $250,000 $245,590 $4,410 Green Green Active roussan.francois@fultoncountyga.gov 2017 2021-05-03 20:32:41 NULL NULL NULL
CSS- 10 TS106 Northside Dr. at Riverview Dr.-Old Powers Ferry Rd. Tier 1 Operation and Safety Improvements TSPLOST Sandy Springs Completed Realignment of the intersection and a possible roundabout with sidewalk imp... more
Realignment of the intersection and a possible roundabout with sidewalk improvements.
Vertical Earth HNTB May, 2021 September, 2018 August, 2024 March, 2024 http://spr.gs/riverview Sales Tax $4,402,748 $3,660,367 $742,381 Green Green Active ajohnson@sandyspringsga.gov 2024 2025-02-28 09:05:10 NULL NULL NULL
CSS- 11 TS105 Roswell Road at Grogans Ferry Road Tier 1 Operation and Safety Improvements TSPLOST Sandy Springs Completed Realignment of the intersection and installation of traffic signal. Access ... more
Realignment of the intersection and installation of traffic signal. Access management on Roswell Road.
Ohmshiv Columbia Engnieering July, 2020 February, 2018 April, 2023 March, 2023 https://www.sandyspringsga.gov/roswell-roadgrogans-ferry-road-improvements Sales Tax $4,800,000 $4,765,529 $34,471 Green Green Active ajohnson@sandyspringsga.gov 2023 2024-03-29 14:31:48 NULL NULL NULL
CSS- 12 TS108 Roswell Road at Dalrymple Road Tier 1 Operation and Safety Improvements TSPLOST Sandy Springs Completed Extend EB left-turn storage and increase radii on NW and SW quadrants Vertical Earth KCI May, 2021 October, 2018 December, 2024 November, 2024 Sales Tax $2,840,000 $2,400,529 $439,471 Green Green Active ajohnson@sandyspringsga.gov 2024 2025-12-11 08:49:00 NULL NULL NULL
CSS- 13 TS114 Mount Vernon Hwy at Heards Ferry Road (Phase 2) Tier 1 Operation and Safety Improvements TSPLOST Sandy Springs Completed Construction of dedicated NB left-turn lane NULL NULL NULL May, 2020 NULL NULL Sales Tax $0 $0 $0 Green Green Inactive ajohnson@sandyspringsga.gov 2021 2022-05-26 17:57:42 NULL NULL NULL
SUM = 1,336,287,302 SUM = 142,586,760,300 SUM = -141,250,472,998