Improvements will include the addition of a circular roundabout to address... more
Improvements will include the addition of a circular roundabout to address congestion and reduce the severity of accidents at
this intersection. Additional improvements include drainage, curb & gutter, streetlights, and 5' wide sidewalks.
Improvements will include the addition of a circular roundabout to address ... more
Improvements will include the addition of a circular roundabout to address congestion and reduce the severity of accidents at this intersection. Additional improvements include drainage, curb & gutter, streetlights, and 5Æ wide sidewalks. Due to the proximity, this project will be delivered as a single construction project along with OSI 613 Old Fairburn Road at Union Road.
The intersection will be analyzed for traffic improvements including a roun... more
The intersection will be analyzed for traffic improvements including a roundabout alternative. Additional improvements include curb & gutter, drainage, sidewalks, and streetlights. The intersection improvements will improve safety and relieve congestion.
NULL
AEI
March, 2023
December, 2020
October, 2024
NULL
Sales Tax
$1,600,000
$87,890
$1,512,110
Green
Green
Active
roussan.francois@fultoncountyga.gov
2021
2023-03-06 12:30:16
NULL
NULL
NULL
CSF- 7
RC 106
New Hope Road (Boat Rock to Cascade Rd)
Tier 1
Maintenance and Safety Enhancements
TSPLOST
City of South Fulton
Completed
The New Hope Road (Boat Rock to Cascade Rd) to be resurfaced may have eithe... more
The New Hope Road (Boat Rock to Cascade Rd) to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled.
E R Snell
Not Applicable
Not Applicable
March, 2018
August, 2018
December, 2017
Sales Tax
$414,358
$453,951
$-39,593
Yellow
Green
Active
roussan.francois@fultoncountyga.gov
2017
2021-05-03 16:14:02
NULL
NULL
NULL
CSF- 70
OSI 617
Welcome All Road @ Jailette Road
Tier 1
Operation and Safety Improvements
TSPLOST
City of South Fulton
Design
The intersection will be analyzed for traffic improvements including a roun... more
The intersection will be analyzed for traffic improvements including a roundabout alternative. Curb & Gutter, drainage, sidewalks, and street lights will be part of the proposed improvements. The intersection improvements will address safety improvements, congestion mitigation, and geometric design standards.
NULL
ATLAS
March, 2023
May, 2021
April, 2024
NULL
Sales Tax
$1,070,400
$142,000,108,847
$-141,999,038,447
Green
Green
Active
roussan.francois@fultoncountyga.gov
2020
2023-03-06 12:32:33
NULL
NULL
NULL
CSF- 71
OSI 618
Welcome All Road @ Scarboro Road
Tier 1
Operation and Safety Improvements
TSPLOST
City of South Fulton
Design
The intersection will be analyzed for traffic improvements including a roun... more
The intersection will be analyzed for traffic improvements including a roundabout alternative. Curb & Gutter, drainage, sidewalks, and street lights will be part of the proposed improvements. The intersection improvements will address safety improvements, congestion mitigation, and geometric design standards.
NULL
AEI
May, 2023
May, 2021
December, 2024
NULL
Sales Tax
$1,556,400
$84,643
$1,471,757
Green
Green
Active
roussan.francois@fultoncountyga.gov
NULL
2023-03-06 12:37:09
NULL
NULL
NULL
CSF- 72
RST 202
Falls @ Camp Creek
Tier 1
Maintenance and Safety Enhancements
TSPLOST
City of South Fulton
Completed
The primary work is to resurface the final asphalt topping layer. The road ... more
The primary work is to resurface the final asphalt topping layer. The road Casa Blanca Lane) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work includes all necessary preparation work (e.g., full depth patching and a single surface treatment). The roads will then have the final asphalt topping layer installed in a manner that will provide uniformity of the asphalt. Milling of the existing asphalt surface is not expected to be required for these roadways.
E R Snell
Not Applicable
Not Applicable
March, 2018
August, 2018
Not Applicable
Sales Tax
$50,297
$62,067
$-11,770
Green
Green
Active
roussan.francois@fultoncountyga.gov
2017
2021-05-03 20:30:59
NULL
NULL
NULL
CSF- 73
OSI 619
West Stubbs Road @ Butner Road
Tier 1
Operation and Safety Improvements
TSPLOST
City of South Fulton
Bidding
Intersection will be analyzed for traffic improvements including a roundabo... more
Intersection will be analyzed for traffic improvements including a roundabout alternative. Curb & Gutter, drainage, sidewalks, and street lights will be part of the proposed improvements. The intersection improvements will provide geometric and congestion relief.
NULL
NULL
NULL
July, 2021
NULL
NULL
Sales Tax
$1,722,000
$150,000
$1,572,000
Green
Green
Active
roussan.francois@fultoncountyga.gov
2020
2021-10-19 13:23:07
NULL
NULL
NULL
CSF- 74
OSI 620
Aldredge Road @Merk Road
Tier 2
Operation and Safety Improvements
TSPLOST
City of South Fulton
Planning
Intersection will be analyzed for traffic improvements including a roundabo... more
Intersection will be analyzed for traffic improvements including a roundabout alternative. Curb & Gutter, drainage, sidewalks, and street lights will be part of the proposed improvements. The intersection improvements will provide geometric and congestion relief.
NULL
NULL
NULL
July, 2021
NULL
NULL
Sales Tax
$984,000
$0
$984,000
Gray
Gray
Active
NULL
NULL
NULL
NULL
NULL
NULL
CSF- 75
OSI 621
Bethsaida Road @ Old National Hwy.
Tier 2
Operation and Safety Improvements
TSPLOST
City of South Fulton
Planning
Intersection will be analyzed for traffic improvements including a roundabo... more
Intersection will be analyzed for traffic improvements including a roundabout alternative. Curb & Gutter, drainage, sidewalks, and street lights will be part of the proposed improvements. The intersection improvements will provide geometric and congestion relief.
NULL
NULL
NULL
July, 2021
NULL
NULL
Sales Tax
$1,788,000
$0
$1,788,000
Gray
Gray
Active
NULL
NULL
NULL
NULL
NULL
NULL
CSF- 76
OSI 622
Butner Road @ Aldredge Road
Tier 2
Operation and Safety Improvements
TSPLOST
City of South Fulton
Planning
Intersection will be analyzed for traffic improvements including a roundabo... more
Intersection will be analyzed for traffic improvements including a roundabout alternative. Curb & Gutter, drainage, sidewalks, and street lights will be part of the proposed improvements. The intersection improvements will provide geometric and congestion relief.
NULL
NULL
NULL
July, 2021
NULL
NULL
Sales Tax
$1,434,000
$0
$1,434,000
Gray
Gray
Active
NULL
NULL
NULL
NULL
NULL
NULL
CSF- 77
OSI 624
Washington Road @ Roosevelt Highway
Tier 2
Operation and Safety Improvements
TSPLOST
City of South Fulton
Planning
Intersection will be analyzed for traffic improvements including a roundabo... more
Intersection will be analyzed for traffic improvements including a roundabout alternative. Curb & Gutter, drainage, sidewalks, and street lights will be part of the proposed improvements. The intersection improvements will provide geometric and congestion relief.
NULL
NULL
NULL
July, 2021
NULL
NULL
Sales Tax
$2,449,200
$0
$2,449,200
Gray
Gray
Active
NULL
NULL
NULL
NULL
NULL
NULL
CSF- 78
OSI 625
Welcome All Road @ Will Lee Road
Tier 2
Operation and Safety Improvements
TSPLOST
City of South Fulton
Planning
Intersection will be analyzed for traffic improvements including a roundabo... more
Intersection will be analyzed for traffic improvements including a roundabout alternative. Curb & Gutter, drainage, sidewalks, and street lights will be part of the proposed improvements. The intersection improvements will provide geometric and congestion relief.
NULL
NULL
July, 2021
NULL
NULL
NULL
Sales Tax
$1,669,200
$0
$1,669,200
Gray
Gray
Active
NULL
NULL
NULL
NULL
NULL
NULL
CSF- 79
SU 700
Flat Shoals Rd at Old National Hwy
Tier 1
Operation and Safety Improvements
TSPLOST
City of South Fulton
Design
Traffic signal upgrades will include new mast arm poles, new cabinets, dete... more
Traffic signal upgrades will include new mast arm poles, new cabinets, detection, signal heads, back plates, pedestrian signals, and pavement markings at the intersections. The work will include fiber communication along Flat Shoals Road from Mallory Road to Old National Highway.
NULL
Jacobs
March, 2023
September, 2020
July, 2024
NULL
Sales Tax
$250,000
$0
$250,000
Green
Green
Active
roussan.francois@fultoncountyga.gov
NULL
2023-03-06 12:54:47
NULL
NULL
NULL
CSF- 8
RC 107
Old Bill Cook Road (Buffington Rd to Old National Hwy)
Tier 1
Maintenance and Safety Enhancements
TSPLOST
City of South Fulton
Completed
The Old Bill Cook Road (Buffington Rd to Old National Hwy) to be resurfaced... more
The Old Bill Cook Road (Buffington Rd to Old National Hwy) to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled.
NULL
Not Applicable
Not Applicable
March, 2020
August, 2020
NULL
Sales Tax
$438,189
$458,162
$-19,973
Yellow
Green
Active
roussan.francois@fultoncountyga.gov
2019
2021-05-03 16:14:51
NULL
NULL
NULL
CSF- 80
SU 701
Flat Shoals Rd at Hemperly Rd
Tier 1
Operation and Safety Improvements
TSPLOST
City of South Fulton
Planning
The overall objective of this project is the redesign and reconstruction of... more
The overall objective of this project is the redesign and reconstruction of eleven (11) traffic signals along the Flat Shoals Road corridor to complement the proposed Advanced Traffic Management System (ATMS) along the corridor. Closed Circuit TV (CCTV) cameras will be installed as well as fiber optic drop cables to the cameras and existing traffic signals. Traffic signals will be timed to maintain coordinated traffic flow through the synchronized intersections. The progression of vehicles along the major roadway will be given priority even when the characteristics of the roadway traffic flow and control changes.
NULL
NULL
NULL
July, 2019
NULL
NULL
Sales Tax
$250,000
$0
$250,000
Green
Green
Active
NULL
NULL
NULL
NULL
NULL
NULL
CSF- 81
SU 702
Flat Shoals Rd at Kimberly Mill Road
Tier 1
Operation and Safety Improvements
TSPLOST
City of South Fulton
Planning
The overall objective of this project is the redesign and reconstruction of... more
The overall objective of this project is the redesign and reconstruction of eleven (11) traffic signals along the Flat Shoals Road corridor to complement the proposed Advanced Traffic Management System (ATMS) along the corridor. Closed Circuit TV (CCTV) cameras will be installed as well as fiber optic drop cables to the cameras and existing traffic signals. Traffic signals will be timed to maintain coordinated traffic flow through the synchronized intersections. The progression of vehicles along the major roadway will be given priority even when the characteristics of the roadway traffic flow and control changes.
NULL
NULL
NULL
July, 2019
NULL
NULL
Sales Tax
$250,000
$0
$250,000
Green
Green
Active
NULL
NULL
NULL
NULL
NULL
NULL
CSF- 82
RST 218
Forrest Creek
Tier 1
Maintenance and Safety Enhancements
TSPLOST
City of South Fulton
Completed
The primary work is to resurface the final asphalt topping layer. The roads... more
The primary work is to resurface the final asphalt topping layer. The roads (Amberland Sq, Bluemist Cove, Graywind Trl, and Jadetree La) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work includes all necessary preparation work (e.g., full depth patching and a single surface treatment). The roads will then have the final asphalt topping layer installed in a manner that will provide uniformity of the asphalt. Milling of the existing asphalt surface is not expected to be required for these roadways.
E R Snell
Not Applicable
Not Applicable
March, 2018
August, 2018
Not Applicable
Sales Tax
$86,578
$101,379
$-14,801
Red
Green
Active
roussan.francois@fultoncountyga.gov
2017
2021-05-03 20:14:31
NULL
NULL
NULL
CSF- 83
SU 703
Flat Shoals Rd at Red Oak Rd
Tier 1
Operation and Safety Improvements
TSPLOST
City of South Fulton
Planning
The overall objective of this project is the redesign and reconstruction of... more
The overall objective of this project is the redesign and reconstruction of eleven (11) traffic signals along the Flat Shoals Road corridor to complement the proposed Advanced Traffic Management System (ATMS) along the corridor. Closed Circuit TV (CCTV) cameras will be installed as well as fiber optic drop cables to the cameras and existing traffic signals. Traffic signals will be timed to maintain coordinated traffic flow through the synchronized intersections. The progression of vehicles along the major roadway will be given priority even when the characteristics of the roadway traffic flow and control changes.
Not Applicable
Not Applicable
NULL
July, 2019
NULL
NULL
Sales Tax
$250,000
$0
$250,000
Green
Green
Active
NULL
NULL
NULL
NULL
NULL
NULL
CSF- 84
SU 704
Flat Shoals Rd at Hidden Brook Dr
Tier 1
Operation and Safety Improvements
TSPLOST
City of South Fulton
Planning
The overall objective of this project is the redesign and reconstruction of... more
The overall objective of this project is the redesign and reconstruction of eleven (11) traffic signals along the Flat Shoals Road corridor to complement the proposed Advanced Traffic Management System (ATMS) along the corridor. Closed Circuit TV (CCTV) cameras will be installed as well as fiber optic drop cables to the cameras and existing traffic signals. Traffic signals will be timed to maintain coordinated traffic flow through the synchronized intersections. The progression of vehicles along the major roadway will be given priority even when the characteristics of the roadway traffic flow and control changes.