Actions Project ID Local ID Project Name Tier Project Type Initiatve Type City Current Stage Description Construction Firm Selected Design Firm Selected Estimated Design Completion Date Estimated Start Date For Project Estimated Construction Completion Date Estimated Substantial Completion Date Link To External Website Primary Funding Source TSPLOST Budget ($) TSPLOST Dollars Spent ($) TSPLOST Dollars Committed (not spent) ($) Cost Status Schedule Status Status Editor Project Year Last Update State Address Creation Date
CSF- 67 OSI 614 Rivertown Road @ Cedar Grove Road Tier 1 Operation and Safety Improvements TSPLOST City of South Fulton Bidding Improvements will include the addition of a circular roundabout to address... more
Improvements will include the addition of a circular roundabout to address congestion and reduce the severity of accidents at this intersection. Additional improvements include drainage, curb & gutter, streetlights, and 5' wide sidewalks.
NULL American Engineers, Inc February, 2023 July, 2024 March, 2023 NULL https://performance.fultoncountyga.gov/stories/s/f85b-5vnc Sales Tax $1,310,000 $98,319 $1,211,681 Green Green Active roussan.francois@fultoncountyga.gov 2017 2023-03-05 00:49:10 NULL NULL NULL
CSF- 68 OSI 615 Stonewall Tell Road @ Union Road Tier 1 Operation and Safety Improvements TSPLOST City of South Fulton Design Improvements will include the addition of a circular roundabout to address ... more
Improvements will include the addition of a circular roundabout to address congestion and reduce the severity of accidents at this intersection. Additional improvements include drainage, curb & gutter, streetlights, and 5Æ wide sidewalks. Due to the proximity, this project will be delivered as a single construction project along with OSI 613 Old Fairburn Road at Union Road.
NULL American Engineers, Inc March, 2023 December, 2020 July, 2025 NULL https://performance.fultoncountyga.gov/stories/s/itui-hn3h Sales Tax $1,488,000 $32,049 $1,455,951 Green Green Active roussan.francois@fultoncountyga.gov 2017 2023-03-06 12:28:39 NULL NULL NULL
CSF- 69 OSI 616 Stonewall Tell Road @ Jones Road/Pittman Road Tier 1 Operation and Safety Improvements TSPLOST City of South Fulton Design The intersection will be analyzed for traffic improvements including a roun... more
The intersection will be analyzed for traffic improvements including a roundabout alternative. Additional improvements include curb & gutter, drainage, sidewalks, and streetlights. The intersection improvements will improve safety and relieve congestion.
NULL AEI March, 2023 December, 2020 October, 2024 NULL Sales Tax $1,600,000 $87,890 $1,512,110 Green Green Active roussan.francois@fultoncountyga.gov 2021 2023-03-06 12:30:16 NULL NULL NULL
CSF- 7 RC 106 New Hope Road (Boat Rock to Cascade Rd) Tier 1 Maintenance and Safety Enhancements TSPLOST City of South Fulton Completed The New Hope Road (Boat Rock to Cascade Rd) to be resurfaced may have eithe... more
The New Hope Road (Boat Rock to Cascade Rd) to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled.
E R Snell Not Applicable Not Applicable March, 2018 August, 2018 December, 2017 Sales Tax $414,358 $453,951 $-39,593 Yellow Green Active roussan.francois@fultoncountyga.gov 2017 2021-05-03 16:14:02 NULL NULL NULL
CSF- 70 OSI 617 Welcome All Road @ Jailette Road Tier 1 Operation and Safety Improvements TSPLOST City of South Fulton Design The intersection will be analyzed for traffic improvements including a roun... more
The intersection will be analyzed for traffic improvements including a roundabout alternative. Curb & Gutter, drainage, sidewalks, and street lights will be part of the proposed improvements. The intersection improvements will address safety improvements, congestion mitigation, and geometric design standards.
NULL ATLAS March, 2023 May, 2021 April, 2024 NULL Sales Tax $1,070,400 $142,000,108,847 $-141,999,038,447 Green Green Active roussan.francois@fultoncountyga.gov 2020 2023-03-06 12:32:33 NULL NULL NULL
CSF- 71 OSI 618 Welcome All Road @ Scarboro Road Tier 1 Operation and Safety Improvements TSPLOST City of South Fulton Design The intersection will be analyzed for traffic improvements including a roun... more
The intersection will be analyzed for traffic improvements including a roundabout alternative. Curb & Gutter, drainage, sidewalks, and street lights will be part of the proposed improvements. The intersection improvements will address safety improvements, congestion mitigation, and geometric design standards.
NULL AEI May, 2023 May, 2021 December, 2024 NULL Sales Tax $1,556,400 $84,643 $1,471,757 Green Green Active roussan.francois@fultoncountyga.gov NULL 2023-03-06 12:37:09 NULL NULL NULL
CSF- 72 RST 202 Falls @ Camp Creek Tier 1 Maintenance and Safety Enhancements TSPLOST City of South Fulton Completed The primary work is to resurface the final asphalt topping layer. The road ... more
The primary work is to resurface the final asphalt topping layer. The road Casa Blanca Lane) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work includes all necessary preparation work (e.g., full depth patching and a single surface treatment). The roads will then have the final asphalt topping layer installed in a manner that will provide uniformity of the asphalt. Milling of the existing asphalt surface is not expected to be required for these roadways.
E R Snell Not Applicable Not Applicable March, 2018 August, 2018 Not Applicable Sales Tax $50,297 $62,067 $-11,770 Green Green Active roussan.francois@fultoncountyga.gov 2017 2021-05-03 20:30:59 NULL NULL NULL
CSF- 73 OSI 619 West Stubbs Road @ Butner Road Tier 1 Operation and Safety Improvements TSPLOST City of South Fulton Bidding Intersection will be analyzed for traffic improvements including a roundabo... more
Intersection will be analyzed for traffic improvements including a roundabout alternative. Curb & Gutter, drainage, sidewalks, and street lights will be part of the proposed improvements. The intersection improvements will provide geometric and congestion relief.
NULL NULL NULL July, 2021 NULL NULL Sales Tax $1,722,000 $150,000 $1,572,000 Green Green Active roussan.francois@fultoncountyga.gov 2020 2021-10-19 13:23:07 NULL NULL NULL
CSF- 74 OSI 620 Aldredge Road @Merk Road Tier 2 Operation and Safety Improvements TSPLOST City of South Fulton Planning Intersection will be analyzed for traffic improvements including a roundabo... more
Intersection will be analyzed for traffic improvements including a roundabout alternative. Curb & Gutter, drainage, sidewalks, and street lights will be part of the proposed improvements. The intersection improvements will provide geometric and congestion relief.
NULL NULL NULL July, 2021 NULL NULL Sales Tax $984,000 $0 $984,000 Gray Gray Active NULL NULL NULL NULL NULL NULL
CSF- 75 OSI 621 Bethsaida Road @ Old National Hwy. Tier 2 Operation and Safety Improvements TSPLOST City of South Fulton Planning Intersection will be analyzed for traffic improvements including a roundabo... more
Intersection will be analyzed for traffic improvements including a roundabout alternative. Curb & Gutter, drainage, sidewalks, and street lights will be part of the proposed improvements. The intersection improvements will provide geometric and congestion relief.
NULL NULL NULL July, 2021 NULL NULL Sales Tax $1,788,000 $0 $1,788,000 Gray Gray Active NULL NULL NULL NULL NULL NULL
CSF- 76 OSI 622 Butner Road @ Aldredge Road Tier 2 Operation and Safety Improvements TSPLOST City of South Fulton Planning Intersection will be analyzed for traffic improvements including a roundabo... more
Intersection will be analyzed for traffic improvements including a roundabout alternative. Curb & Gutter, drainage, sidewalks, and street lights will be part of the proposed improvements. The intersection improvements will provide geometric and congestion relief.
NULL NULL NULL July, 2021 NULL NULL Sales Tax $1,434,000 $0 $1,434,000 Gray Gray Active NULL NULL NULL NULL NULL NULL
CSF- 77 OSI 624 Washington Road @ Roosevelt Highway Tier 2 Operation and Safety Improvements TSPLOST City of South Fulton Planning Intersection will be analyzed for traffic improvements including a roundabo... more
Intersection will be analyzed for traffic improvements including a roundabout alternative. Curb & Gutter, drainage, sidewalks, and street lights will be part of the proposed improvements. The intersection improvements will provide geometric and congestion relief.
NULL NULL NULL July, 2021 NULL NULL Sales Tax $2,449,200 $0 $2,449,200 Gray Gray Active NULL NULL NULL NULL NULL NULL
CSF- 78 OSI 625 Welcome All Road @ Will Lee Road Tier 2 Operation and Safety Improvements TSPLOST City of South Fulton Planning Intersection will be analyzed for traffic improvements including a roundabo... more
Intersection will be analyzed for traffic improvements including a roundabout alternative. Curb & Gutter, drainage, sidewalks, and street lights will be part of the proposed improvements. The intersection improvements will provide geometric and congestion relief.
NULL NULL July, 2021 NULL NULL NULL Sales Tax $1,669,200 $0 $1,669,200 Gray Gray Active NULL NULL NULL NULL NULL NULL
CSF- 79 SU 700 Flat Shoals Rd at Old National Hwy Tier 1 Operation and Safety Improvements TSPLOST City of South Fulton Design Traffic signal upgrades will include new mast arm poles, new cabinets, dete... more
Traffic signal upgrades will include new mast arm poles, new cabinets, detection, signal heads, back plates, pedestrian signals, and pavement markings at the intersections. The work will include fiber communication along Flat Shoals Road from Mallory Road to Old National Highway.
NULL Jacobs March, 2023 September, 2020 July, 2024 NULL Sales Tax $250,000 $0 $250,000 Green Green Active roussan.francois@fultoncountyga.gov NULL 2023-03-06 12:54:47 NULL NULL NULL
CSF- 8 RC 107 Old Bill Cook Road (Buffington Rd to Old National Hwy) Tier 1 Maintenance and Safety Enhancements TSPLOST City of South Fulton Completed The Old Bill Cook Road (Buffington Rd to Old National Hwy) to be resurfaced... more
The Old Bill Cook Road (Buffington Rd to Old National Hwy) to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled.
NULL Not Applicable Not Applicable March, 2020 August, 2020 NULL Sales Tax $438,189 $458,162 $-19,973 Yellow Green Active roussan.francois@fultoncountyga.gov 2019 2021-05-03 16:14:51 NULL NULL NULL
CSF- 80 SU 701 Flat Shoals Rd at Hemperly Rd Tier 1 Operation and Safety Improvements TSPLOST City of South Fulton Planning The overall objective of this project is the redesign and reconstruction of... more
The overall objective of this project is the redesign and reconstruction of eleven (11) traffic signals along the Flat Shoals Road corridor to complement the proposed Advanced Traffic Management System (ATMS) along the corridor. Closed Circuit TV (CCTV) cameras will be installed as well as fiber optic drop cables to the cameras and existing traffic signals. Traffic signals will be timed to maintain coordinated traffic flow through the synchronized intersections. The progression of vehicles along the major roadway will be given priority even when the characteristics of the roadway traffic flow and control changes.
NULL NULL NULL July, 2019 NULL NULL Sales Tax $250,000 $0 $250,000 Green Green Active NULL NULL NULL NULL NULL NULL
CSF- 81 SU 702 Flat Shoals Rd at Kimberly Mill Road Tier 1 Operation and Safety Improvements TSPLOST City of South Fulton Planning The overall objective of this project is the redesign and reconstruction of... more
The overall objective of this project is the redesign and reconstruction of eleven (11) traffic signals along the Flat Shoals Road corridor to complement the proposed Advanced Traffic Management System (ATMS) along the corridor. Closed Circuit TV (CCTV) cameras will be installed as well as fiber optic drop cables to the cameras and existing traffic signals. Traffic signals will be timed to maintain coordinated traffic flow through the synchronized intersections. The progression of vehicles along the major roadway will be given priority even when the characteristics of the roadway traffic flow and control changes.
NULL NULL NULL July, 2019 NULL NULL Sales Tax $250,000 $0 $250,000 Green Green Active NULL NULL NULL NULL NULL NULL
CSF- 82 RST 218 Forrest Creek Tier 1 Maintenance and Safety Enhancements TSPLOST City of South Fulton Completed The primary work is to resurface the final asphalt topping layer. The roads... more
The primary work is to resurface the final asphalt topping layer. The roads (Amberland Sq, Bluemist Cove, Graywind Trl, and Jadetree La) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work includes all necessary preparation work (e.g., full depth patching and a single surface treatment). The roads will then have the final asphalt topping layer installed in a manner that will provide uniformity of the asphalt. Milling of the existing asphalt surface is not expected to be required for these roadways.
E R Snell Not Applicable Not Applicable March, 2018 August, 2018 Not Applicable Sales Tax $86,578 $101,379 $-14,801 Red Green Active roussan.francois@fultoncountyga.gov 2017 2021-05-03 20:14:31 NULL NULL NULL
CSF- 83 SU 703 Flat Shoals Rd at Red Oak Rd Tier 1 Operation and Safety Improvements TSPLOST City of South Fulton Planning The overall objective of this project is the redesign and reconstruction of... more
The overall objective of this project is the redesign and reconstruction of eleven (11) traffic signals along the Flat Shoals Road corridor to complement the proposed Advanced Traffic Management System (ATMS) along the corridor. Closed Circuit TV (CCTV) cameras will be installed as well as fiber optic drop cables to the cameras and existing traffic signals. Traffic signals will be timed to maintain coordinated traffic flow through the synchronized intersections. The progression of vehicles along the major roadway will be given priority even when the characteristics of the roadway traffic flow and control changes.
Not Applicable Not Applicable NULL July, 2019 NULL NULL Sales Tax $250,000 $0 $250,000 Green Green Active NULL NULL NULL NULL NULL NULL
CSF- 84 SU 704 Flat Shoals Rd at Hidden Brook Dr Tier 1 Operation and Safety Improvements TSPLOST City of South Fulton Planning The overall objective of this project is the redesign and reconstruction of... more
The overall objective of this project is the redesign and reconstruction of eleven (11) traffic signals along the Flat Shoals Road corridor to complement the proposed Advanced Traffic Management System (ATMS) along the corridor. Closed Circuit TV (CCTV) cameras will be installed as well as fiber optic drop cables to the cameras and existing traffic signals. Traffic signals will be timed to maintain coordinated traffic flow through the synchronized intersections. The progression of vehicles along the major roadway will be given priority even when the characteristics of the roadway traffic flow and control changes.
NULL NULL NULL July, 2019 NULL NULL Sales Tax $250,000 $0 $250,000 Green Green Active NULL NULL NULL NULL NULL NULL
SUM = 1,336,287,302 SUM = 142,586,760,300 SUM = -141,250,472,998