The roads (Commonwood Place, Keels Lane, Smoke Ridge Drive II, Springtree C... more
The roads (Commonwood Place, Keels Lane, Smoke Ridge Drive II, Springtree Court, Squirrel Way, and Woody Path Lane) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled.
CWM
Not Applicable
Not Applicable
NULL
May, 2019
NULL
Sales Tax
$210,714
$129,044
$81,670
Green
Green
Active
roussan.francois@fultoncountyga.gov
2018
2021-05-03 20:29:35
NULL
NULL
NULL
CSF- 5
RC 104
Creel Road (Old National Hwy to West Rd)
Tier 1
Maintenance and Safety Enhancements
TSPLOST
City of South Fulton
Completed
The Creel Road (Old National Hwy to West Rd) to be resurfaced may have eith... more
The Creel Road (Old National Hwy to West Rd) to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled.
NULL
Not Applicable
Not Applicable
March, 2019
August, 2019
NULL
Sales Tax
$295,100
$283,472
$11,628
Green
Green
Active
roussan.francois@fultoncountyga.gov
2019
2021-05-03 16:11:47
NULL
NULL
NULL
CSF- 50
RS 405
Woodward Estates
Tier 1
Maintenance and Safety Enhancements
TSPLOST
City of South Fulton
Completed
The roads (Amethist Court, Garnett Way, Mica Trace, Old Rocky Road, Rockway... more
The roads (Amethist Court, Garnett Way, Mica Trace, Old Rocky Road, Rockway Road, Rocky Court, Topaz Trail, Turquoise Trail, and Woodward Road) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled.
CWM
Not Applicable
Not Applicable
NULL
June, 2019
NULL
Sales Tax
$469,318
$294,440
$174,878
Green
Green
Active
roussan.francois@fultoncountyga.gov
2018
2021-05-03 20:29:52
NULL
NULL
NULL
CSF- 51
B 500
Butner Road over Camp Creek
Tier 1
Bridges
TSPLOST
City of South Fulton
Design
The proposed Butner Road over Camp Creek includes improvements to the bridg... more
The proposed Butner Road over Camp Creek includes improvements to the bridge that will extend to the Camp Creek Parkway edge of pavement on the south leg of the intersection. A new bridge is proposed to replace the existing near the Butner Road/Camp Creek Parkway intersection. The proposed bridge will be wide enough to accommodate two traffic lanes of 24-ft wide, 30'' curb and gutter and 12-ft wide pedestrian sidewalk on the west side to tie into a proposed multi-use trail off the bridge and 6-ft wide sidewalk on the east side. A turning lane will be designed off the bridge to finish free flow and stacking length up to the intersection with Camp Creek Parkway.
NULL
William-Russell & Johnson
December, 2022
April, 2020
September, 2024
NULL
Sales Tax
$1,600,000
$61,911
$1,538,089
Green
Green
Active
roussan.francois@fultoncountyga.gov
2019
2023-03-05 00:19:21
NULL
NULL
NULL
CSF- 52
RST 200
Camp Creek Village (SFR), (LL 73 Dist 14FF)
Tier 1
Maintenance and Safety Enhancements
TSPLOST
City of South Fulton
Completed
The primary work is to resurface the final asphalt topping layer. The roads... more
The primary work is to resurface the final asphalt topping layer. The roads (Zultana and zoya) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work includes all necessary preparation work (e.g., full depth patching and a single surface treatment). The roads will then have the final asphalt topping layer installed in a manner that will provide uniformity of the asphalt. Milling of the existing asphalt surface is not expected to be required for these roadways.
E R Snell
Not Applicable
Not Applicable
March, 2018
August, 2018
Not Applicable
Sales Tax
$44,140
$49,491
$-5,351
Red
Green
Active
roussan.francois@fultoncountyga.gov
2017
2021-05-03 20:30:27
NULL
NULL
NULL
CSF- 53
B 501
Enon Road over Camp Creek Tributary (Timber Bridge)
Tier 1
Bridges
TSPLOST
City of South Fulton
Design
The proposed project will replace the existing culvert located on Enon Road... more
The proposed project will replace the existing culvert located on Enon Road between Enon Mill Drive and Enon Pines Drive. The
deteriorated timber culvert will be removed and replaced with a structure to carry two 12-foot travel lanes and 8-foot
shoulders, which include 6-foot sidewalks.
NULL
AEI
February, 2022
December, 2022
February, 2024
NULL
Sales Tax
$600,000
$87,454
$512,546
Green
Green
Active
roussan.francois@fultoncountyga.gov
2020
2023-03-05 00:22:05
NULL
NULL
NULL
CSF- 54
B 502
Bethsaida over Morning Creek
Tier 2
Bridges
TSPLOST
City of South Fulton
Planning
Bridge replacement to be analyzed for a better rating capacity and alleviat... more
Bridge replacement to be analyzed for a better rating capacity and alleviate congestion.
NULL
NULL
NULL
NULL
NULL
NULL
Sales Tax
$1,500,000
$0
$1,500,000
Gray
Gray
Active
roussan.francois@fultoncountyga.gov
NULL
2023-03-05 00:23:02
NULL
NULL
NULL
CSF- 55
OSI 601
Butner Road @ Camp Creek Parkway
Tier 1
Operation and Safety Improvements
TSPLOST
City of South Fulton
Design
The proposed Butner Road project is a capacity project that begins at the i... more
The proposed Butner Road project is a capacity project that begins at the intersection of Camp Creek Parkway and extends approximately 1,000 feet to the north along Butner Road. It consists of widening the existing Butner Road by adding left and right-turn lanes, providing a nature trail at-grade crossing and updating the intersection signalization and guardrails, as a safety measure, on the east side of Butner Road to Merk Road. The travel lanes will be minimum 11 foot-wide with 2-foot stamped concrete and 12-foot trail on the east side. This project also includes signal upgrade and installation of new decorative mast arms.
NULL
American Engineers, Inc
December, 2022
August, 2020
January, 2025
NULL
Sales Tax
$3,174,000
$16,250
$3,157,750
Green
Green
Active
roussan.francois@fultoncountyga.gov
2017
2023-03-05 00:26:37
NULL
NULL
NULL
CSF- 56
OSI 602
Butner Road @ Union Road
Tier 1
Operation and Safety Improvements
TSPLOST
City of South Fulton
Design
Intersection improvements will include the use of an oval roundabout or cir... more
Intersection improvements will include the use of an oval roundabout or circular roundabout. A traffic report concluded that a roundabout is the best alternative to handle the traffic congestion at this intersection. Additional improvements include drainage, curb & gutter, street lights, and sidewalks.
The proposed project will improve traffic safety by realigning the approach... more
The proposed project will improve traffic safety by realigning the approach of PIttman Road to eliminate an extreme angle of
incidence at the intersection. Additional improvements include curb & gutter, drainage, sidewalks, and streetlights
NULL
AEI
May, 2023
December, 2020
December, 2024
NULL
Sales Tax
$1,412,000
$73,234
$1,338,766
Green
Green
Active
roussan.francois@fultoncountyga.gov
2020
2023-03-05 00:30:11
NULL
NULL
NULL
CSF- 58
OSI 604
Campbellton Road @ Stonewall Tell Road (Project Design on Hold)
Tier 1
Operation and Safety Improvements
TSPLOST
City of South Fulton
Construction
Intersection will be analyzed for traffic improvements including a roundabo... more
Intersection will be analyzed for traffic improvements including a roundabout alternative. Curb & Gutter, drainage, sidewalks, and street lights will be part of the proposed improvements. The intersection improvements will provide geometric and congestion relief.
CMC, INC
American Engineers, Inc
December, 2022
April, 2020
March, 2024
NULL
Sales Tax
$1,422,000
$172,932
$1,249,068
Red
Green
Active
roussan.francois@fultoncountyga.gov
2017
2023-03-05 00:40:45
NULL
NULL
NULL
CSF- 59
OSI 605
Campbellton-Fairburn Road @ Jones Road (Project Design on Hold)
Tier 1
Operation and Safety Improvements
TSPLOST
City of South Fulton
Design
Geometric and capacity improvements to include traditional or roundabouts
NULL
American Engineers, Inc
August, 2018
NULL
August, 2019
NULL
Sales Tax
$1,464,000
$0
$1,464,000
Green
Green
Active
roussan.francois@fultoncountyga.gov
NULL
2021-05-03 22:55:24
NULL
NULL
NULL
CSF- 6
RC 105
Enon Road (Stonewall Tell Rd to Atlanta City limits)
Tier 1
Maintenance and Safety Enhancements
TSPLOST
City of South Fulton
Completed
The Enon Road (Stonewall Tell Rd to Atlanta City limits)to be resurfaced ma... more
The Enon Road (Stonewall Tell Rd to Atlanta City limits)to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled.
NULL
Not Applicable
Not Applicable
March, 2019
August, 2019
NULL
Sales Tax
$921,496
$752,801
$168,695
Green
Green
Active
roussan.francois@fultoncountyga.gov
2018
2021-05-03 16:12:54
NULL
NULL
NULL
CSF- 60
OSI 606
Cascade-Palmetto Highway @ West Stubbs Road
Tier 1
Operation and Safety Improvements
TSPLOST
City of South Fulton
Completed
The project and plans reflect the installation of a new signal at the inter... more
The project and plans reflect the installation of a new signal at the intersection of Cascade Palmetto Highway and West Stubbs Road. In addition, it includes the installation of curb & gutter, a solar powered advanced signal warning sign, ADA ramps, and signing & marking. The existing non-signalized intersection already includes the necessary turn lanes and right of way.
NULL
Not Applicable
Not Applicable
May, 2018
November, 2018
NULL
Sales Tax
$1,554,000
$272,757
$1,281,243
Green
Green
Active
roussan.francois@fultoncountyga.gov
2019
2021-05-03 22:46:16
NULL
NULL
NULL
CSF- 61
OSI 607
Demooney Road @ West Stubbs Road
Tier 1
Operation and Safety Improvements
TSPLOST
City of South Fulton
Design
Intersection improvements will include the addition of a circular roundabou... more
Intersection improvements will include the addition of a circular roundabout to address congestion and reduce the severity of
accidents at this intersection. Additional improvements include drainage, curb & gutter, streetlights, and 5' wide sidewalks.
NULL
AEI
May, 2023
December, 2020
November, 2024
NULL
Sales Tax
$1,422,000
$108,809
$1,313,191
Green
Green
Active
roussan.francois@fultoncountyga.gov
2021
2023-03-05 00:38:41
NULL
NULL
NULL
CSF- 62
OSI 608
Enon Road @ Stonewall Tell Road
Tier 1
Operation and Safety Improvements
TSPLOST
City of South Fulton
Design
.Intersection will be analyzed for traffic improvements including a roundab... more
.Intersection will be analyzed for traffic improvements including a roundabout alternative. Curb & Gutter, drainage, sidewalks, and street lights will be part of the proposed improvements. The intersection improvements will provide geometric and congestion relief.
NULL
AEI
May, 2023
December, 2020
October, 2024
NULL
Sales Tax
$1,674,000
$104,310
$1,569,690
Green
Green
Active
roussan.francois@fultoncountyga.gov
2021
2023-03-05 00:40:33
NULL
NULL
NULL
CSF- 63
RST 201
Chestnut Ridge @ Cedar Grove
Tier 1
Maintenance and Safety Enhancements
TSPLOST
City of South Fulton
Completed
The roads (Appaloose Cove and Sorrel Drive) within the subdivision is to re... more
The roads (Appaloose Cove and Sorrel Drive) within the subdivision is to resurface the final asphalt topping layer. The roads within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work includes all necessary preparation work (e.g., full depth patching and a single surface treatment). The roads will then have the final asphalt topping layer installed in a manner that will provide uniformity of the asphalt. Milling of the existing asphalt surface is not expected to be required for these roadways.
E R Snell
Not Applicable
Not Applicable
March, 2018
August, 2018
Not Applicable
Sales Tax
$41,187
$39,476
$1,711
Green
Green
Active
roussan.francois@fultoncountyga.gov
2017
2021-05-03 20:30:42
NULL
NULL
NULL
CSF- 64
OSI 609
Feldwood Road @ Morning Creek Drive
Tier 1
Operation and Safety Improvements
TSPLOST
City of South Fulton
Completed
Intersection will be analyzed for traffic improvements including a roundabo... more
Intersection will be analyzed for traffic improvements including a roundabout alternative. Curb & Gutter, drainage, sidewalks, and street lights will be part of the proposed improvements. The intersection improvements will provide geometric and congestion relief.
NULL
AEI
December, 2022
NULL
January, 2023
NULL
Sales Tax
$952,800
$79,878
$872,922
Green
Green
Active
roussan.francois@fultoncountyga.gov
2021
2023-03-05 00:42:06
NULL
NULL
NULL
CSF- 65
OSI 610
Feldwood Road @ Bench Mark Drive
Tier 1
Operation and Safety Improvements
TSPLOST
City of South Fulton
Completed
Intersection will be analyzed for traffic improvements including a roundabo... more
Intersection will be analyzed for traffic improvements including a roundabout alternative. Curb & Gutter, drainage, sidewalks, and street lights will be part of the proposed improvements. The intersection improvements will provide geometric and congestion relief.
NULL
American Engineers, Inc
December, 2022
December, 2020
December, 2022
NULL
Sales Tax
$775,200
$35,000
$740,200
Green
Green
Active
roussan.francois@fultoncountyga.gov
2017
2023-03-05 00:45:19
NULL
NULL
NULL
CSF- 66
OSI 613
Old Fairburn Road @ Union Road
Tier 1
Operation and Safety Improvements
TSPLOST
City of South Fulton
Design
Improvements will include the addition of a circular roundabout to address ... more
Improvements will include the addition of a circular roundabout to address congestion and reduce the severity of accidents at
this intersection. Additional improvements include drainage, curb & gutter, streetlights, and 5' wide sidewalks. Due to the
proximity, this project will be delivered as a single construction project along with OSI 615 Stonewall Tell Road @ Union Road.