Academy Street/Webb Bridge Road GA400 Bridge Improvements
Tier 1
Bridges
TSPLOST
Alpharetta
Completed
This project has been combined under the GA400 Bridges project per IGA with... more
This project has been combined under the GA400 Bridges project per IGA with GDOT.
N/A
N/A
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Sales Tax
$0
$0
$0
NULL
NULL
Inactive
kmcdowell@alpharetta.ga.us
NULL
2021-05-03 19:29:47
NULL
NULL
NULL
ALP- 49
C0005
Kimball Bridge Road/GA 400 Bridge Improvements
Tier 1
Bridges
TSPLOST
Alpharetta
Completed
This project has been combined with GA400 Bridges project, per IGA with GDO... more
This project has been combined with GA400 Bridges project, per IGA with GDOT.
N/A
N/A
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Sales Tax
$0
$0
$0
Gray
Gray
Inactive
imisbach@alpharetta.ga.us
NULL
2026-05-04 15:25:23
NULL
NULL
NULL
ALP- 50
C0006
GA 400 Bottlenecks
Tier 1
Congestion Relief
TSPLOST
Alpharetta
Bidding
This project has been combined with GA400 Bridges, per IGA with GDOT.
N/A
N/A
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Sales Tax
$0
$0
$0
Gray
Gray
Inactive
kmcdowell@alpharetta.ga.us
NULL
2023-02-13 16:21:08
NULL
NULL
NULL
ALP- 51
C2223
Improved Crossing from Parking Deck to north side of Milton Ave
Tier 1
Pedestrian Improvements
TSPLOST2
Alpharetta
Completed
This project is for the construction of a midblock pedestrian crossing on M... more
This project is for the construction of a midblock pedestrian crossing on Milton Avenue at Teasley Street, including a refuge area for pedestrians and installation of rectangular rapid flashing beacons (RRFBs).
This project is for the construction of a midblock pedestrian crossing on M... more
This project is for the construction of a midblock pedestrian crossing on Mayfield Road at the intersection with the school entrance. The design includes installation of rectangular rapid flashing beacons (RRFBs).
Improved Pedestrian Crossings from City Center to Churches
Tier 1
Pedestrian Improvements
TSPLOST2
Alpharetta
Design
This proposed project would review the section of Academy Street from SR-9 ... more
This proposed project would review the section of Academy Street from SR-9 to Haynes Bridge Road for improvements that would reduce vehicle speeds, improve visibility, shorten the distance to cross the street and provide pedestrian refuge areas.
This project is for the design and construction of the Alpha Loop Trail fro... more
This project is for the design and construction of the Alpha Loop Trail from the existing trail adjacent to the Chelsea Walk Subdivision to the existing trail off Northwinds Parkway. The trail is 12' wide and this particular section will consist of multiple bridges and a tunnel under Westisde Parkway.
Mid-Block Crosswalk (Mid Broadwell Rd at Charlotte Dr)
Tier 1
Pedestrian Improvements
TSPLOST2
Alpharetta
Completed
This project is for the construction of a midblock pedestrian crossing on M... more
This project is for the construction of a midblock pedestrian crossing on Mid Broadwell Road at the intersection of Charlotte Drive. It includes a refuge area for pedestrians, installation of rectangular rapid flashing beacons (RRFBs), and 6' wide sidewalk along Mid Broadwell Road with approximately 70' length to provide connection to Charlotte Drive sidewalk.
This project is for the construction of a midblock pedestrian crossing on C... more
This project is for the construction of a midblock pedestrian crossing on Cogburn Road, in front of the Gatewood subdivision and Cogburn Road park. This includes a refuge area for pedestrians and installation of rectangular rapid flashing beacons (RRFBs).
This is for safety improvements on Roswell Street between Old Roswell Stree... more
This is for safety improvements on Roswell Street between Old Roswell Street and Old Milton Pkwy. Some of the main elements included in this project are: wide sidewalk and pedestrian light poles on the east side of Roswell Street, and safety improvements at the intersection of Roswell Street and Marietta Street (4-way STOP controlled).
4 Pedestrian Bridges (Windward Pkwy over Big Creek; Greenway access
Tier 1
Pedestrian and Bike Improvements
TSPLOST2
Alpharetta
Construction
This is for the design and construction of 4 pedestrian bridges over Big Cr... more
This is for the design and construction of 4 pedestrian bridges over Big Creek and Big Creek Tributary along Windward Parkway. The pedestrian bridges will provide connections between the existing sidewalks, facilitating pedestrian movement and crossing over the Creeks.
Four bridges are with the following general specifications:
1. Two pedestrian bridges over Big Creek between Union Hill Road and Clubhouse Drive. It consists of an 8' pedestrian bridge (6' clear width) on the north side of Windward Parkway; and another same type of bridge with an additional 10' multi-use trail on the south side of Windward Parkway to connect the existing sidewalk to Big Creek Greenway.
2. Two 8' pedestrian bridges (6' clear width) over Big Creek Tributary between Clubhouse Drive and Admiral Crossing on both sides of Windward Parkway.
This is to improve the safety, accessibility, and walkability of pedestrian... more
This is to improve the safety, accessibility, and walkability of pedestrians along the North Point Parkway corridor from Mansell Road to Haynes Bridge Road. Some of the major elements that are considered in this project include reducing the number of travel lanes from 6 to 4 (both sides), 10' curb planter median bioswales, 12' multi-use trail, and 10' planting strip on both sides of the roadway. Also, energy efficient lighting, roadway condition monitoring, and green infrastructure monitoring systems are considered for this project.
This project includes the design of a series of traffic improvements at mul... more
This project includes the design of a series of traffic improvements at multiple intersections due to GA 400 Express Lanes and Tradewinds Parkway access point. Some of the major improvements include dual southbound left turn lanes at the intersection of Westside Parkway and Webb Bridge Road, a roundabout at the intersection of Westside Parkway and Tradewinds Parkway, a traffic signal at the intersection of North Point Parkway and Tradewinds Parkway, and closing roadway median on North Point Parkway at the intersection with Morris Road.
The project consists of design and construction of pedestrian and bike safe... more
The project consists of design and construction of pedestrian and bike safety improvements along Cumming Street, between Highway 9 and Westside Parkway. The proposed project would add a sidewalk on the south side of Cumming Street: 1) from Cricket Lane to Clairmonte Ave, and 2) from where the sidewalk stops on the east side of Henderson Pkwy to Westside Pkwy.
This 400-foot roadway improvement will provide operational enhancements as ... more
This 400-foot roadway improvement will provide operational enhancements as well as bicycle and pedestrian accommodation along Milton Avenue between Old Roswell Street and Roswell Street. This project complements improvements being implemented on the north side of Milton Avenue by the Private Developer.
Improvements include correcting excessive cross slope and widening the sidewalk along the south side of the road. Reconfiguring much of the south side parking to parallel parking on paver material, and modifying drainage as needed to accommodate the new configuration. Lighting with hanging baskets and new trees in tree wells are also being proposed. This project will also incorporate utility relocations.
Since this project is a Tier 2 Project in the TSPLSOT Program, projects in Tier 1 are accomplished first prior to moving onto Tier 2 or 3 projects, unless there is a re-allocation of funds or revenue collected permits moving onto the other tiers.
This project is for construction of a series of improvements on Academy Str... more
This project is for construction of a series of improvements on Academy Street with the following elements: 6' wide sidewalk on the north side of Academy Street from Loxford Lane to Fire Station 81; inclusion of left turn lanes between Loxford Lane and Wedgewood Drive where possible; inclusion of landscape medians between Loxford Lane and Wedgewood Drive where possible; creation of bike lanes on both sides of Academy Street; Addition of pedestrian lighting along the north side of Academy Street from the driveway of Alpharetta Presbyterian to Fire Station 81; and installation of an emergency traffic signal on Academy Street at Fire Station 81. Design work has been completed.
Since this project is a Tier 2 Project in the TSPLSOT Program, projects in Tier 1 are accomplished first prior to moving onto Tier 2 or 3 projects, unless there is a re-allocation of funds or revenue collected permits moving onto the other tiers.
This project is to perform necessary studies, evaluations, and analysis for... more
This project is to perform necessary studies, evaluations, and analysis for replacement of the existing traffic signal at the intersection of Mayfield Road at Canton Street with a single-lane roundabout. Improved traffic flow and safety benefits are potential advantages of a roundabout compared to the existing traffic signal at this location.
Since this project is a Tier 3 Project in the TSPLSOT Program, projects in Tier 1 are accomplished first prior to moving onto Tier 2 or 3 projects, unless there is a re-allocation of funds or revenue collected permits moving onto the other tiers.
Design of a roundabout at the intersection of Hopewell Road and Vaughan Dri... more
Design of a roundabout at the intersection of Hopewell Road and Vaughan Drive was funded in FY 2020 and is complete. The roundabout would serve to assist in the following: denote one is entering into Alpharetta; aid in slowing traffic entering into the Downtown area; and assist in turning onto/off of Vaughan Drive.
Since this project is a Tier 3 Project in the TSPLSOT Program, projects in Tier 1 are accomplished first prior to moving onto Tier 2 or 3 projects, unless there is a re-allocation of funds or revenue collected permits moving onto the other tiers.