Here you can select the number of cards to be placed in a row for each of supported screen resolutions. Your current resolution is highlighted in this way.
The overall objective of this project is the redesign and reconstruction of... more
The overall objective of this project is the redesign and reconstruction of eleven (11) traffic signals along the Flat Shoals Road corridor to complement the proposed Advanced Traffic Management System (ATMS) along the corridor. Closed Circuit TV (CCTV) cameras will be installed as well as fiber optic drop cables to the cameras and existing traffic signals. Traffic signals will be timed to maintain coordinated traffic flow through the synchronized intersections. The progression of vehicles along the major roadway will be given priority even when the characteristics of the roadway traffic flow and control changes.
NULL
NULL
NULL
July, 2019
NULL
NULL
Sales Tax
$250,000
$0
$250,000
Green
Green
Active
NULL
NULL
NULL
NULL
NULL
NULL
CSF- 82
RST 218
Forrest Creek
Tier 1
Maintenance and Safety Enhancements
TSPLOST
City of South Fulton
Completed
The primary work is to resurface the final asphalt topping layer. The roads... more
The primary work is to resurface the final asphalt topping layer. The roads (Amberland Sq, Bluemist Cove, Graywind Trl, and Jadetree La) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work includes all necessary preparation work (e.g., full depth patching and a single surface treatment). The roads will then have the final asphalt topping layer installed in a manner that will provide uniformity of the asphalt. Milling of the existing asphalt surface is not expected to be required for these roadways.
E R Snell
Not Applicable
Not Applicable
March, 2018
August, 2018
Not Applicable
Sales Tax
$86,578
$101,379
$-14,801
Red
Green
Active
roussan.francois@fultoncountyga.gov
2017
2021-05-03 20:14:31
NULL
NULL
NULL
CSF- 83
SU 703
Flat Shoals Rd at Red Oak Rd
Tier 1
Operation and Safety Improvements
TSPLOST
City of South Fulton
Planning
The overall objective of this project is the redesign and reconstruction of... more
The overall objective of this project is the redesign and reconstruction of eleven (11) traffic signals along the Flat Shoals Road corridor to complement the proposed Advanced Traffic Management System (ATMS) along the corridor. Closed Circuit TV (CCTV) cameras will be installed as well as fiber optic drop cables to the cameras and existing traffic signals. Traffic signals will be timed to maintain coordinated traffic flow through the synchronized intersections. The progression of vehicles along the major roadway will be given priority even when the characteristics of the roadway traffic flow and control changes.
Not Applicable
Not Applicable
NULL
July, 2019
NULL
NULL
Sales Tax
$250,000
$0
$250,000
Green
Green
Active
NULL
NULL
NULL
NULL
NULL
NULL
CSF- 84
SU 704
Flat Shoals Rd at Hidden Brook Dr
Tier 1
Operation and Safety Improvements
TSPLOST
City of South Fulton
Planning
The overall objective of this project is the redesign and reconstruction of... more
The overall objective of this project is the redesign and reconstruction of eleven (11) traffic signals along the Flat Shoals Road corridor to complement the proposed Advanced Traffic Management System (ATMS) along the corridor. Closed Circuit TV (CCTV) cameras will be installed as well as fiber optic drop cables to the cameras and existing traffic signals. Traffic signals will be timed to maintain coordinated traffic flow through the synchronized intersections. The progression of vehicles along the major roadway will be given priority even when the characteristics of the roadway traffic flow and control changes.
NULL
NULL
NULL
July, 2019
NULL
NULL
Sales Tax
$250,000
$0
$250,000
Green
Green
Active
NULL
NULL
NULL
NULL
NULL
NULL
CSF- 85
SU 705
Flat Shoals Rd at Connel Rd
Tier 1
Operation and Safety Improvements
TSPLOST
City of South Fulton
Planning
The overall objective of this project is the redesign and reconstruction of... more
The overall objective of this project is the redesign and reconstruction of eleven (11) traffic signals along the Flat Shoals Road corridor to complement the proposed Advanced Traffic Management System (ATMS) along the corridor. Closed Circuit TV (CCTV) cameras will be installed as well as fiber optic drop cables to the cameras and existing traffic signals. Traffic signals will be timed to maintain coordinated traffic flow through the synchronized intersections. The progression of vehicles along the major roadway will be given priority even when the characteristics of the roadway traffic flow and control changes.
NULL
NULL
NULL
July, 2019
NULL
NULL
Sales Tax
$250,000
$0
$250,000
Green
Green
Active
NULL
NULL
NULL
NULL
NULL
NULL
CSF- 86
SU 706
Flat Shoals Rd at Buffington Rd
Tier 1
Operation and Safety Improvements
TSPLOST
City of South Fulton
Planning
The overall objective of this project is the redesign and reconstruction of... more
The overall objective of this project is the redesign and reconstruction of eleven (11) traffic signals along the Flat Shoals Road corridor to complement the proposed Advanced Traffic Management System (ATMS) along the corridor. Closed Circuit TV (CCTV) cameras will be installed as well as fiber optic drop cables to the cameras and existing traffic signals. Traffic signals will be timed to maintain coordinated traffic flow through the synchronized intersections. The progression of vehicles along the major roadway will be given priority even when the characteristics of the roadway traffic flow and control changes.
NULL
NULL
NULL
July, 2019
NULL
NULL
Sales Tax
$250,000
$0
$250,000
Green
Green
Active
NULL
NULL
NULL
NULL
NULL
NULL
CSF- 87
SU 707
Flat Shoals Rd at I -85 North
Tier 1
Operation and Safety Improvements
TSPLOST
City of South Fulton
Planning
The overall objective of this project is the redesign and reconstruction of... more
The overall objective of this project is the redesign and reconstruction of eleven (11) traffic signals along the flat Shoals Road corridor to complement the proposed ATMS along the corridor. CCTV cameras will be installed as well as fiber optic drop cables to the cameras and existing traffic signals. Traffic signals will be timed to maintain coordinated traffic flow progression through the synchronized intersections. The progression of vehicles along the major roadway will be given priority even when the characteristics of the roadway traffic flow and control changes.
NULL
NULL
NULL
July, 2019
NULL
NULL
Sales Tax
$250,000
$0
$250,000
Green
Green
Active
NULL
NULL
NULL
NULL
NULL
NULL
CSF- 88
SU 708
Flat Shoals Rd at I -85 South
Tier 1
Operation and Safety Improvements
TSPLOST
City of South Fulton
Planning
The overall objective of this project is the redesign and reconstruction of... more
The overall objective of this project is the redesign and reconstruction of eleven (11) traffic signals along the Flat Shoals Road corridor to complement the proposed Advanced Traffic Management System (ATMS) along the corridor. Closed Circuit TV (CCTV) cameras will be installed as well as fiber optic drop cables to the cameras and existing traffic signals. Traffic signals will be timed to maintain coordinated traffic flow through the synchronized intersections. The progression of vehicles along the major roadway will be given priority even when the characteristics of the roadway traffic flow and control changes.
NULL
NULL
NULL
July, 2019
NULL
NULL
Sales Tax
$250,000
$0
$250,000
Green
Green
Active
NULL
NULL
NULL
NULL
NULL
NULL
CSF- 89
SU 709
Flat Shoals Rd at Feldwood Rd
Tier 1
Operation and Safety Improvements
TSPLOST
City of South Fulton
Planning
The overall objective of this project is the redesign and reconstruction of... more
The overall objective of this project is the redesign and reconstruction of eleven (11) traffic signals along the Flat Shoals Road corridor to complement the proposed Advanced Traffic Management System (ATMS) along the corridor. Closed Circuit TV (CCTV) cameras will be installed as well as fiber optic drop cables to the cameras and existing traffic signals. Traffic signals will be timed to maintain coordinated traffic flow through the synchronized intersections. The progression of vehicles along the major roadway will be given priority even when the characteristics of the roadway traffic flow and control changes.
NULL
NULL
NULL
July, 2019
NULL
NULL
Sales Tax
$250,000
$0
$250,000
Green
Green
Active
NULL
NULL
NULL
NULL
NULL
NULL
CSF- 9
RC 108
Old Fairburn Road (Union Rd to Camp Creek Pkwy)
Tier 1
Maintenance and Safety Enhancements
TSPLOST
City of South Fulton
Completed
The Old Fairburn Road (Union Rd to Camp Creek Pkwy) to be resurfaced may ha... more
The Old Fairburn Road (Union Rd to Camp Creek Pkwy) to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled.
E R Snell
Not Applicable
Not Applicable
March, 2018
August, 2018
December, 2017
Sales Tax
$606,253
$642,227
$-35,974
Yellow
Green
Active
roussan.francois@fultoncountyga.gov
2017
2021-05-03 16:15:50
NULL
NULL
NULL
CSF- 90
SU 710
Flat Shoals Rd at Mallory Rd
Tier 1
Operation and Safety Improvements
TSPLOST
City of South Fulton
Planning
The overall objective of this project is the redesign and reconstruction of... more
The overall objective of this project is the redesign and reconstruction of eleven (11) traffic signals along the Flat Shoals Road corridor to complement the proposed Advanced Traffic Management System (ATMS) along the corridor. Closed Circuit TV (CCTV) cameras will be installed as well as fiber optic drop cables to the cameras and existing traffic signals. Traffic signals will be timed to maintain coordinated traffic flow through the synchronized intersections. The progression of vehicles along the major roadway will be given priority even when the characteristics of the roadway traffic flow and control changes.
NULL
NULL
NULL
July, 2019
NULL
NULL
Sales Tax
$250,000
$0
$250,000
Green
Green
Active
NULL
NULL
NULL
NULL
NULL
NULL
CSF- 91
ATMS 800
Flat Shoals Road
Tier 2
Operation and Safety Improvements
TSPLOST
City of South Fulton
Design
The overall objective of this project is the redesign and reconstruction of... more
The overall objective of this project is the redesign and reconstruction of eleven (11) traffic signals along the Flat Shoals Road corridor to complement the proposed Advanced Traffic Management System (ATMS) along the corridor. Closed Circuit TV (CCTV) cameras will be installed as well as fiber optic drop cables to the cameras and existing traffic signals. Traffic signals will be timed to maintain coordinated traffic flow through the synchronized intersections. The progression of vehicles along the major roadway will be given priority even when the characteristics of the roadway traffic flow and control changes.
NULL
NULL
December, 2021
July, 2021
March, 2023
NULL
Sales Tax
$1,000,000
$326,837
$673,163
Green
Green
Active
roussan.francois@fultoncountyga.gov
2020
2021-05-03 23:10:11
NULL
NULL
NULL
CSF- 92
PBI 900
Danforth Road (Rehoboth Circle to Cascade Road)
Tier 1
Pedestrian and Bike Improvements
TSPLOST
City of South Fulton
Construction
The project scope includes the installation of 5 foot-wide concrete ADA (Am... more
The project scope includes the installation of 5 foot-wide concrete ADA (Americans with Disabilities Act) compliant sidewalks, concrete curb and gutter, a 2- foot stamped concrete, drainage and pedestrian lighting on both sides of Danforth Road from Rehoboth Circle to Cascade Road. The approximate length of the project is 0.8 mile.
CMC, INC
AEI
September, 2022
February, 2022
December, 2023
NULL
Sales Tax
$2,250,000
$90,653
$2,159,347
Green
Green
Active
roussan.francois@fultoncountyga.gov
2017
2023-03-06 12:44:33
NULL
NULL
NULL
CSF- 93
PBI 901
Enon Road (Lynarbor Lane to Sanford J. Jones)
Tier 1
Pedestrian and Bike Improvements
TSPLOST
City of South Fulton
Design
Proposed project includes sidewalk facilities along both sides of Enon Road... more
Proposed project includes sidewalk facilities along both sides of Enon Road from just north of Lynarbor Lane and extends to Sanford J. Jones Boulevard for a distance of approximately 1.5 miles. Project features include adding 5-6 foot sidewalks along the west side, 8-ft. sidewalks along east side from Lynarbor Lane to Sanford J. Jones Boulevard. Drainage improvements, curb and gutter, and 2-foot stamped concrete is also included.
NULL
AAEI
March, 2023
September, 2020
June, 2024
NULL
Sales Tax
$2,000,000
$43,650
$1,956,350
Green
Green
Active
roussan.francois@fultoncountyga.gov
2017
2023-03-06 12:46:48
NULL
NULL
NULL
CSF- 94
RST 203
Falls @ Cascade Palms Phase 2
Tier 1
Maintenance and Safety Enhancements
TSPLOST
City of South Fulton
Completed
The roads (Palmview Court, Smithers Way, Talkeetna Court, Muskeg Court, and... more
The roads (Palmview Court, Smithers Way, Talkeetna Court, Muskeg Court, and Cutbank Court) within the subdivision is to resurface the final asphalt topping layer. The roads within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work includes all necessary preparation work (e.g., full depth patching and a single surface treatment). The roads will then have the final asphalt topping layer installed in a manner that will provide uniformity of the asphalt. The subject subdivison was topped through an earlier contract outside TSPLOST funding.
E R Snell
Not Applicable
Not Applicable
March, 2018
August, 2018
Not Applicable
Sales Tax
$86,578
$103,523
$-16,945
Red
Green
Active
roussan.francois@fultoncountyga.gov
2017
2021-05-03 20:31:37
NULL
NULL
NULL
CSF- 95
OSI 600
Bethsaida Road at Creel Road
Tier 2
Operation and Safety Improvements
TSPLOST
City of South Fulton
Planning
Intersection will include either a roundabout or conventional improvements.... more
Intersection will include either a roundabout or conventional improvements. A conventional improvement includes additional turn lanes and sometimes, if warranted, a signal. Whichever alternative is concluded, sidewalks, street lights, curb & gutter, and drainage will be included.
NULL
NULL
NULL
July, 2021
NULL
NULL
Sales Tax
$1,353,600
$0
$1,353,600
Gray
Gray
Active
NULL
NULL
NULL
NULL
NULL
NULL
CSF- 96
RST 204
Foxfire PH2, (LL 124/133 Dist 13)
Tier 1
Maintenance and Safety Enhancements
TSPLOST
City of South Fulton
Completed
The primary work is to resurface the final asphalt topping layer. The roads... more
The primary work is to resurface the final asphalt topping layer. The roads (Grey Fox Way and Polar Fox Ct) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work includes all necessary preparation work (e.g., full depth patching and a single surface treatment). The roads will then have the final asphalt topping layer installed in a manner that will provide uniformity of the asphalt. Milling of the existing asphalt surface is not expected to be required for these roadways.
The primary work is to resurface the final asphalt topping layer. The roads... more
The primary work is to resurface the final asphalt topping layer. The roads (Halcyon Dr, Herron Trl, Herron La, Herron Pass, Herron Point, and Herron Trace) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work includes all necessary preparation work (e.g., full depth patching and a single surface treatment). The roads will then have the final asphalt topping layer installed in a manner that will provide uniformity of the asphalt. Milling of the existing asphalt surface is not expected to be required for these roadways.
E R Snell
Not Applicable
Not Applicable
March, 2018
August, 2018
Not Applicable
Sales Tax
$68,057
$90,131
$-22,074
Red
Green
Active
roussan.francois@fultoncountyga.gov
2017
2021-05-03 20:32:08
NULL
NULL
NULL
CSF- 98
RST 206
Lake Royale U3, (LL 188 Dist 13)
Tier 1
Maintenance and Safety Enhancements
TSPLOST
City of South Fulton
Completed
The primary work is to resurface the final asphalt topping layer. The roads... more
The primary work is to resurface the final asphalt topping layer. The roads (Lake Rorale Drive and Lake Royale Pl)) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work includes all necessary preparation work (e.g., full depth patching and a single surface treatment). The roads will then have the final asphalt topping layer installed in a manner that will provide uniformity of the asphalt. Milling of the existing asphalt surface is not expected to be required for these roadways.
E R Snell
Not Applicable
Not Applicable
NULL
November, 2017
Not Applicable
Sales Tax
$43,845
$32,373
$11,472
Green
Green
Active
roussan.francois@fultoncountyga.gov
2017
2021-05-03 20:32:26
NULL
NULL
NULL
CSF- 99
RST 207
Le Jardin Multiple Phases
Tier 1
Maintenance and Safety Enhancements
TSPLOST
City of South Fulton
Completed
The primary work is to resurface the final asphalt topping layer. The roads... more
The primary work is to resurface the final asphalt topping layer. The roads (Artistry Way, Botanica Way, Butchart Pl, Concerto Ct, Le Jardin Blvd, Les Fleurs La, Matisse Lane, Queen Ann Cage Ct, and Tapestry Club Dr) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work includes all necessary preparation work (e.g., full depth patching and a single surface treatment). The roads will then have the final asphalt topping layer installed in a manner that will provide uniformity of the asphalt. Milling of the existing asphalt surface is not expected to be required for these roadways.