Actions Project ID Local ID Project Name Tier Project Type Initiatve Type City Current Stage Description Construction Firm Selected Design Firm Selected Estimated Design Completion Date Estimated Start Date For Project Estimated Construction Completion Date Estimated Substantial Completion Date Link To External Website Primary Funding Source TSPLOST Budget ($) TSPLOST Dollars Spent ($) TSPLOST Dollars Committed (not spent) ($) Cost Status Schedule Status Status Editor Project Year Last Update State Address Creation Date
CSF- 3 RC 102 Cascade Road (Fulton Ind Blvd to Beechcrest Road SW) Tier 1 Maintenance and Safety Enhancements TSPLOST City of South Fulton Completed The Cascade Road (Fulton Ind Blvd to Beechcrest Road SW) to be resurfaced m... more
The Cascade Road (Fulton Ind Blvd to Beechcrest Road SW) to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled.
CW Matthews Not Applicable Not Applicable NULL November, 2018 NULL Sales Tax $1,356,984 $1,336,163 $20,821 Green Green Active roussan.francois@fultoncountyga.gov 2018 2021-05-03 16:08:49 NULL NULL NULL
CSF- 30 RS 386 Sherbrook Forest Tier 1 Maintenance and Safety Enhancements TSPLOST City of South Fulton Completed The roads (Sherbrook Court and Sherbrook Drive) within the subdivision to b... more
The roads (Sherbrook Court and Sherbrook Drive) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled.
NULL Not Applicable Not Applicable NULL July, 2021 NULL Sales Tax $72,792 $137,122 $-64,330 Green Green Active roussan.francois@fultoncountyga.gov 2021 2021-10-12 19:02:15 NULL NULL NULL
CSF- 300 T 271 Fairburn Road Tier 1 Pedestrian and Bike Improvements TSPLOST2 City of South Fulton Construction The project is located on Fairburn Road, starting at Cascade Road and conti... more
The project is located on Fairburn Road, starting at Cascade Road and continuing to North Utoy Creek. The typical section includes 12' travel lanes, curb and gutter, a 10-foot multi-use path on the West side and a 6-foot wide sidewalk behind a 2-foot stamped concrete strip on the east side of Fairburn Road. Improvements also include bridge replacements at North and South Utoy Creek with bottomless culverts and turning lane improvements at the Fairburn Road/Cascade Road intersection. Also included as part of CSF-349
NULL Qk4 November, 2022 March, 2023 December, 2026 December, 2026 Sales Tax $7,142,452 $1,349,760 $5,792,692 NULL NULL Active roussan.francois@cityofsouthfultonga.gov 2023 2026-09-17 10:39:06 Georgia Fairburn Road 2022-03-31
CSF- 301 P 903 Cascade Road Tier 1 Pedestrian and Bike Improvements TSPLOST2 City of South Fulton Design This design project will build up to 3.8 mi. of sidewalk facilities where n... more
This design project will build up to 3.8 mi. of sidewalk facilities where needed along both sides of Cascade from the Atlanta City Limits to Fulton Industrial Blvd. An Audit was done to determine which locations need this work performed. This project also adds storm drainage facilities. The typical section includes a 2-ft. stamped concrete beauty strip and a 2.5-ft. curb and gutter.
NULL NULL March, 2029 March, 2029 June, 2027 June, 2027 Sales Tax $581,035 $261,979 $319,056 NULL NULL Active roussan.francois@cityofsouthfultonga.gov 2026 2026-09-17 10:30:07 Georgia Cascade Road 2022-03-31
CSF- 302 P 908 Flat Shoals Road Tier 1 Pedestrian and Bike Improvements TSPLOST2 City of South Fulton Design This design project will build up to 2.5 mi. of sidewalk facilities where n... more
This design project will build up to 2.5 mi. of sidewalk facilities where needed along both sides of Flat Shoals from Buffington Road to Old National Highway. An Audit was done to determine which locations need this work performed. This project also adds storm drainage facilities. The typical section includes a 2-ft. stamped concrete beauty strip and a 2.5-ft. curb and gutter.
NULL NULL November, 2028 September, 2024 March, 2029 March, 2029 Sales Tax $536,925 $158,167 $378,758 NULL NULL Active roussan.francois@cityofsouthfultonga.gov 2027 2026-09-17 10:27:16 Georgia Flat Shoals Road 2022-03-31
CSF- 303 P 910 Jerome Road Tier 1 Pedestrian and Bike Improvements TSPLOST2 City of South Fulton Design This design project will fill in sidewalk gaps within the existing sidewalk... more
This design project will fill in sidewalk gaps within the existing sidewalk network on 0.8 mi Jerome between Old National Highway and Old Bill Cook Road. This project also adds storm drainage facilities. The typical section includes a 2-ft. stamped concrete beauty strip and a 2.5-ft. curb and gutter.
NULL NULL August, 2028 August, 2025 December, 2029 December, 2029 Sales Tax $207,540 $78,433 $129,107 NULL NULL Active roussan.francois@cityofsouthfultonga.gov 2025 2026-09-17 10:24:45 Georgia Jerome Road 2022-03-31
CSF- 304 P 914 Union Road Tier 1 Pedestrian and Bike Improvements TSPLOST2 City of South Fulton Design This project will fill in sidewalk gaps within the existing 1.15 mi. sidewa... more
This project will fill in sidewalk gaps within the existing 1.15 mi. sidewalk network. Owl Rock Road to Bunting Lane. The project will add 6-ft sidewalks, 2 ft. stamped concrete buffer, 2.5 ft. curb and gutter and drainage facilities throughout as needed. Pedestrian scale streetlights will be considered during project construction.
NULL Khafra August, 2027 April, 2024 June, 2029 June, 2029 Sales Tax $305,617 $0 $305,617 NULL NULL Active roussan.francois@cityofsouthfultonga.gov 2024 2026-09-17 10:22:09 Georgia Union Road 2022-03-31
CSF- 305 P 911 Merk Road Tier 1 Pedestrian and Bike Improvements TSPLOST2 City of South Fulton Design This design project will build up .75 mi. of sidewalk facilities where need... more
This design project will build up .75 mi. of sidewalk facilities where needed along both sides of Merk Rd. from Sanford J Jones to Miles Rd. It also adds storm drainage facilities. The typical section includes a 2.5-ft. curb and gutter, and a 2-ft. stamped concrete beauty strip. There will be 6 ft. and 8 ft. wide sidewalks. Streetlights will be installed throughout the length of the project.
NULL STV - AEI March, 2027 July, 2025 June, 2028 June, 2028 Sales Tax $246,059 $39,101 $206,958 NULL NULL Active roussan.francois@cityofsouthfultonga.gov 2026 2026-09-17 10:19:08 Georgia Merk Road 2022-03-31
CSF- 306 P 909 Fulton Industrial Area Tier 1 Pedestrian and Bike Improvements TSPLOST2 City of South Fulton Planning Sidewalk Gaps Various Locations in Fulton Industrial Blvd District NULL NULL April, 2024 April, 2024 November, 2024 November, 2024 Sales Tax $1,000,000 $0 $1,000,000 NULL NULL Active jeff.mueller@cityofsouthfultonga.gov 2024 2023-03-02 21:37:07 Georgia Fulton Industrial Area 2022-03-31
CSF- 307 P 906 Welcome All Road Tier 1 Pedestrian and Bike Improvements TSPLOST2 City of South Fulton Planning Multi-Use Trail Roosevelt Highway to Will Lee Road NULL NULL August, 2024 September, 2025 September, 2026 September, 2026 Sales Tax $2,940,000 $0 $2,940,000 NULL NULL Active jeff.mueller@cityofsouthfultonga.gov 2025 2023-03-02 21:50:01 Georgia Welcome All Road 2022-03-31
CSF- 308 NULL Harris Rd Tier 2 Bridges TSPLOST2 City of South Fulton Planning NULL NULL NULL NULL NULL NULL NULL Sales Tax NULL NULL $0 NULL NULL Active NULL NULL NULL Georgia Harris Rd 2022-03-31
CSF- 309 NULL Bethsaida Road Tier 2 Operation and Safety Improvements TSPLOST2 City of South Fulton Planning NULL NULL NULL NULL NULL NULL NULL Sales Tax NULL NULL $0 NULL NULL Active NULL NULL NULL Georgia Bethsaida Road 2022-03-31
CSF- 31 RC 111 Merk Road (Butner Rd to Union Rd) Tier 2 Maintenance and Safety Enhancements TSPLOST City of South Fulton Completed The Merk Road (Butner Rd to Union Rd) to be resurfaced may have either exis... more
The Merk Road (Butner Rd to Union Rd) to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled.
NULL Not Applicable NULL June, 2021 November, 2021 NULL Sales Tax $622,536 $268,577 $353,959 Green Gray Active roussan.francois@cityofsouthfultonga.gov 2021 2026-09-22 09:59:23 NULL NULL NULL
CSF- 310 NULL City Wide Tier 1 Quick Response Projects TSPLOST2 City of South Fulton Planning NULL NULL NULL NULL NULL NULL NULL Sales Tax NULL NULL $0 NULL NULL Active NULL NULL NULL Georgia City of South Fulton 2022-03-31
CSF- 311 NULL Campbellton Road Tier 2 Operation and Safety Improvements TSPLOST2 City of South Fulton Planning NULL NULL NULL NULL NULL NULL NULL Sales Tax NULL NULL $0 NULL NULL Active NULL NULL NULL Georgia Campbellton Road 2022-03-31
CSF- 312 NULL Cascade Palmetto Highway Tier 2 Operation and Safety Improvements TSPLOST2 City of South Fulton Planning NULL NULL NULL NULL NULL NULL NULL Sales Tax NULL NULL $0 NULL NULL Active NULL NULL NULL Georgia Cascade Palmetto Highway 2022-03-31
CSF- 313 NULL Enon Road Tier 2 Operation and Safety Improvements TSPLOST2 City of South Fulton Planning NULL NULL NULL NULL NULL NULL NULL Sales Tax NULL NULL $0 NULL NULL Active NULL NULL NULL Georgia Enon Road 2022-03-31
CSF- 314 NULL Intersection Improvements Tier 2 Operation and Safety Improvements TSPLOST2 City of South Fulton Planning NULL NULL NULL NULL NULL NULL NULL Sales Tax NULL NULL $0 NULL NULL Active NULL NULL NULL Georgia City of South Fulton 2022-03-31
CSF- 315 NULL Scarborough Road Tier 2 Pedestrian and Bike Improvements TSPLOST2 City of South Fulton Planning NULL NULL NULL NULL NULL NULL NULL Sales Tax NULL NULL $0 NULL NULL Active NULL NULL NULL Georgia Scarborough Road 2022-03-31
CSF- 316 NULL South Fulton Parkway Tier 2 Operation and Safety Improvements TSPLOST2 City of South Fulton Planning NULL NULL NULL NULL NULL NULL NULL Sales Tax NULL NULL $0 NULL NULL Active NULL NULL NULL Georgia South Fulton Parkway 2022-03-31
SUM = 1,354,206,592 SUM = 717,806,831 SUM = 636,399,761