Actions Project ID Local ID Project Name Tier Project Type Initiatve Type City Current Stage Description Construction Firm Selected Design Firm Selected Estimated Design Completion Date Estimated Start Date For Project Estimated Construction Completion Date Estimated Substantial Completion Date Link To External Website Primary Funding Source TSPLOST Budget ($) TSPLOST Dollars Spent ($) TSPLOST Dollars Committed (not spent) ($) Cost Status Schedule Status Status Editor Project Year Last Update State Address Creation Date
CSF- 63 RST 201 Chestnut Ridge @ Cedar Grove Tier 1 Maintenance and Safety Enhancements TSPLOST City of South Fulton Completed The roads (Appaloose Cove and Sorrel Drive) within the subdivision is to re... more
The roads (Appaloose Cove and Sorrel Drive) within the subdivision is to resurface the final asphalt topping layer. The roads within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work includes all necessary preparation work (e.g., full depth patching and a single surface treatment). The roads will then have the final asphalt topping layer installed in a manner that will provide uniformity of the asphalt. Milling of the existing asphalt surface is not expected to be required for these roadways.
E R Snell Not Applicable Not Applicable March, 2018 August, 2018 Not Applicable Sales Tax $41,187 $39,476 $1,711 Green Green Active roussan.francois@fultoncountyga.gov 2017 2021-05-03 20:30:42 NULL NULL NULL
CSF- 64 OSI 609 Feldwood Road @ Morning Creek Drive Tier 1 Operation and Safety Improvements TSPLOST City of South Fulton Completed Intersection will be analyzed for traffic improvements including a roundabo... more
Intersection will be analyzed for traffic improvements including a roundabout alternative. Curb & Gutter, drainage, sidewalks, and street lights will be part of the proposed improvements. The intersection improvements will provide geometric and congestion relief.
NULL AEI December, 2022 NULL January, 2023 NULL Sales Tax $952,800 $79,878 $872,922 Green Green Active roussan.francois@fultoncountyga.gov 2021 2023-03-05 00:42:06 NULL NULL NULL
CSF- 65 OSI 610 Feldwood Road @ Bench Mark Drive Tier 1 Operation and Safety Improvements TSPLOST City of South Fulton Completed Intersection will be analyzed for traffic improvements including a roundabo... more
Intersection will be analyzed for traffic improvements including a roundabout alternative. Curb & Gutter, drainage, sidewalks, and street lights will be part of the proposed improvements. The intersection improvements will provide geometric and congestion relief.
NULL American Engineers, Inc December, 2022 December, 2020 December, 2022 NULL Sales Tax $775,200 $35,000 $740,200 Green Green Active roussan.francois@fultoncountyga.gov 2017 2023-03-05 00:45:19 NULL NULL NULL
CSF- 66 OSI 613/615 Old Fairburn Road @ Union Road Tier 1 Operation and Safety Improvements TSPLOST City of South Fulton Construction The current construction project will include the addition of two circular ... more
The current construction project will include the addition of two circular roundabouts to address congestion and reduce the severity of accidents at this intersection. Additional improvements include drainage, 24-inch curb & gutter, 24-inch stamp concrete beauty strip, streetlights, and 5' wide sidewalks. The extent of the project will extend approximately 500 feet each route direction from each roundabout. The roundabouts are approximately 900 feet apart. A 400 ft’ section of Old Fairburn Road will be removed as part of the realignment. Due to the proximity, this project is being delivered as a single construction project along with OSI 615 Stonewall Tell Road @ Union Road. Streetlights will also be added within the project limits
NULL American Engineers, Inc March, 2023 December, 2020 May, 2027 May, 2027 Sales Tax $4,279,207 $1,446,683 $2,832,524 Green Green Active roussan.francois@cityofsouthfultonga.gov 2017 2026-09-18 12:26:22 NULL NULL NULL
CSF- 67 OSI 614 Rivertown Road @ Cedar Grove Road Tier 1 Operation and Safety Improvements TSPLOST City of South Fulton Completed This construction project at Rivertown Road and Cedar Grove Road will build... more
This construction project at Rivertown Road and Cedar Grove Road will build a single-lane roundabout to address a sharp angle intersection skew, congestion, and reduce the severity of accidents at this intersection. Additional improvements with this project include improving storm drainage with a typical section consisting of a 2-ft. curb & gutter, 2-ft. stamped concrete beauty strip, and 5-ft. wide sidewalks throughout the project limits. The extent of construction is approximately 1250 ft. along Rivertown Road and 600 ft. along Cedar Grove Road. Streetlights will also be added within the project limits.
NULL American Engineers, Inc December, 2023 July, 2024 June, 2025 June, 2025 https://performance.fultoncountyga.gov/stories/s/f85b-5vnc Sales Tax $2,806,821 $2,555,621 $251,200 Green Green Active roussan.francois@cityofsouthfultonga.gov 2017 2026-09-18 12:29:20 NULL NULL NULL
CSF- 68 OSI 615 Stonewall Tell Road @ Union Road Tier 1 Operation and Safety Improvements TSPLOST City of South Fulton Design Improvements will include the addition of a circular roundabout to address ... more
Improvements will include the addition of a circular roundabout to address congestion and reduce the severity of accidents at this intersection. Additional improvements include drainage, curb & gutter, streetlights, and 5Æ wide sidewalks. Due to the proximity, this project will be delivered as a single construction project along with OSI 613 Old Fairburn Road at Union Road.
NULL American Engineers, Inc March, 2023 December, 2020 July, 2025 NULL https://performance.fultoncountyga.gov/stories/s/itui-hn3h Sales Tax $1,488,000 $32,049 $1,455,951 Green Green Active roussan.francois@fultoncountyga.gov 2017 2023-03-06 12:28:39 NULL NULL NULL
CSF- 69 OSI 616 Stonewall Tell Road @ Jones Road/Pittman Road Tier 1 Operation and Safety Improvements TSPLOST City of South Fulton Design The design project at Jones Road, Stonewall tell Road and Pittman Road will... more
The design project at Jones Road, Stonewall tell Road and Pittman Road will include the addition of a circular single lane roundabout to address congestion and reduce the severity of accidents at this intersection. Additional improvements include drainage, with a typical section of 30-inch curb & gutter, 2-ft of stamped concrete beauty strip, and 5' wide sidewalks. Streetlights will be added during construction.
NULL AEI November, 2024 December, 2020 January, 2028 January, 2028 Sales Tax $314,294 $199,426 $114,868 Green Green Active roussan.francois@cityofsouthfultonga.gov 2021 2026-09-18 13:37:49 NULL NULL NULL
CSF- 7 RC 106 New Hope Road (Boat Rock to Cascade Rd) Tier 1 Maintenance and Safety Enhancements TSPLOST City of South Fulton Completed The New Hope Road (Boat Rock to Cascade Rd) to be resurfaced may have eithe... more
The New Hope Road (Boat Rock to Cascade Rd) to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled.
E R Snell Not Applicable Not Applicable March, 2018 August, 2018 December, 2017 Sales Tax $414,358 $453,951 $-39,593 Yellow Green Active roussan.francois@fultoncountyga.gov 2017 2021-05-03 16:14:02 NULL NULL NULL
CSF- 70 OSI 617 Welcome All Road @ Jailette Road Tier 1 Operation and Safety Improvements TSPLOST City of South Fulton Bidding The design project at Welcome All Road and Jailette Road will realign the S... more
The design project at Welcome All Road and Jailette Road will realign the Stop regulated approach of Jailette Road to improve the angle of incidence at the intersection with Welcome All. Additional improvements include drainage, with a typical section of 30-inch curb & gutter, 2-ft of stamped concrete beauty strip, and 5' wide sidewalks. Streetlights will be added during construction.
NULL ATLAS August, 2026 May, 2021 July. 2027 NULL Sales Tax $95,353 $75 $95,278 Green Green Active roussan.francois@cityofsouthfultonga.gov 2020 2026-09-22 08:44:29 NULL NULL NULL
CSF- 71 OSI 618 Welcome All Road @ Scarboro Road Tier 1 Operation and Safety Improvements TSPLOST City of South Fulton Bidding The design project at Welcome All Road and Scarborough Road will include th... more
The design project at Welcome All Road and Scarborough Road will include the addition of a circular single lane roundabout to address congestion and reduce the severity of accidents at this intersection. Additional improvements include drainage with a typical section of 30-inch curb & gutter, streetlights, 2-ft of stamped concrete beauty strip, and 5' wide sidewalks. Streetlights will be added during construction
NULL AEI August, 2026 May, 2021 July. 2027 July. 2027 Sales Tax $304,266 $195,192 $109,074 Green Green Active roussan.francois@cityofsouthfultonga.gov NULL 2026-09-22 08:46:47 NULL NULL NULL
CSF- 72 RST 202 Falls @ Camp Creek Tier 1 Maintenance and Safety Enhancements TSPLOST City of South Fulton Completed The primary work is to resurface the final asphalt topping layer. The road ... more
The primary work is to resurface the final asphalt topping layer. The road Casa Blanca Lane) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work includes all necessary preparation work (e.g., full depth patching and a single surface treatment). The roads will then have the final asphalt topping layer installed in a manner that will provide uniformity of the asphalt. Milling of the existing asphalt surface is not expected to be required for these roadways.
E R Snell Not Applicable Not Applicable March, 2018 August, 2018 Not Applicable Sales Tax $50,297 $62,067 $-11,770 Green Green Active roussan.francois@fultoncountyga.gov 2017 2021-05-03 20:30:59 NULL NULL NULL
CSF- 73 OSI 619 West Stubbs Road @ Butner Road Tier 1 Operation and Safety Improvements TSPLOST City of South Fulton Design The City of South Fulton is evaluating options to upgrade the intersection ... more
The City of South Fulton is evaluating options to upgrade the intersection of West Stubbs Road at Butner Road to improve safety and capacity throughout the project corridor. It will also provide pedestrian access and safety through the intersection area. Additional improvements include a closed drainage system, 2.5-ft. curb & gutter, 2' stamped concrete, and 5 ft. sidewalks. Streetlights (overhead and pedestrian scale) will be implemented near the end of the project.
NULL NULL NULL July, 2021 NULL NULL Sales Tax $47,326 $47,326 $0 Green Green Active roussan.francois@cityofsouthfultonga.gov 2020 2026-09-22 08:56:25 NULL NULL NULL
CSF- 74 OSI 620 Aldredge Road @Merk Road Tier 2 Operation and Safety Improvements TSPLOST2 City of South Fulton Design improvements include three new turn lanes - a left on westbound Aldredge, a... more
improvements include three new turn lanes - a left on westbound Aldredge, and a right on eastbound Aldredge and a right on northbound Merk, a closed drainage system, 2.5-ft. curb & gutter, 2' stamped concrete, and 5 ft. sidewalks. Merk Road and Aldredge Road will be realigned to be a through street in the east-west direction and Merk Road from the south direction will be stop controlled.
NULL NULL February, 2027 July, 2021 October, 2028 October, 2030 Sales Tax $207,130 $70,283 $136,847 Green Green Active roussan.francois@cityofsouthfultonga.gov NULL 2026-09-22 09:00:21 NULL NULL NULL
CSF- 75 OSI 621 Bethsaida Road @ Old National Hwy. Tier 2 Operation and Safety Improvements TSPLOST City of South Fulton Planning Intersection will be analyzed for traffic improvements including a roundabo... more
Intersection will be analyzed for traffic improvements including a roundabout alternative. Curb & Gutter, drainage, sidewalks, and street lights will be part of the proposed improvements. The intersection improvements will provide geometric and congestion relief.
NULL NULL NULL July, 2021 NULL NULL Sales Tax $1,788,000 $0 $1,788,000 Gray Gray Active NULL NULL NULL NULL NULL NULL
CSF- 76 OSI 622 Butner Road @ Aldredge Road Tier 2 Operation and Safety Improvements TSPLOST City of South Fulton Planning Intersection will be analyzed for traffic improvements including a roundabo... more
Intersection will be analyzed for traffic improvements including a roundabout alternative. Curb & Gutter, drainage, sidewalks, and street lights will be part of the proposed improvements. The intersection improvements will provide geometric and congestion relief.
NULL NULL NULL July, 2021 NULL NULL Sales Tax $1,434,000 $0 $1,434,000 Gray Gray Active NULL NULL NULL NULL NULL NULL
CSF- 77 OSI 624 Washington Road @ Roosevelt Highway Tier 2 Operation and Safety Improvements TSPLOST City of South Fulton Completed Intersection will be analyzed for traffic improvements including a roundabo... more
Intersection will be analyzed for traffic improvements including a roundabout alternative. Curb & Gutter, drainage, sidewalks, and street lights will be part of the proposed improvements. The intersection improvements will provide geometric and congestion relief.
NULL NULL NULL July, 2021 NULL NULL Sales Tax $0 $0 $0 Gray Gray Active roussan.francois@cityofsouthfultonga.gov NULL 2026-09-22 09:07:07 NULL NULL NULL
CSF- 78 OSI 625 Welcome All Road @ Will Lee Road Tier 2 Operation and Safety Improvements TSPLOST City of South Fulton Planning Intersection will be analyzed for traffic improvements including a roundabo... more
Intersection will be analyzed for traffic improvements including a roundabout alternative. Curb & Gutter, drainage, sidewalks, and street lights will be part of the proposed improvements. The intersection improvements will provide geometric and congestion relief.
NULL NULL July, 2021 NULL NULL NULL Sales Tax $0 $0 $0 Gray Gray Active roussan.francois@cityofsouthfultonga.gov NULL 2026-09-22 09:08:49 NULL NULL NULL
CSF- 79 SU 700 Flat Shoals Rd at Old National Hwy Tier 1 Operation and Safety Improvements TSPLOST City of South Fulton Design Traffic signal upgrades will include new mast arm poles, new cabinets, dete... more
Traffic signal upgrades will include new mast arm poles, new cabinets, detection, signal heads, back plates, pedestrian signals, and pavement markings at the intersections. The work will include fiber communication along Flat Shoals Road from Mallory Road to Old National Highway.
NULL Jacobs March, 2023 September, 2020 July, 2024 NULL Sales Tax $250,000 $0 $250,000 Green Green Active roussan.francois@fultoncountyga.gov NULL 2023-03-06 12:54:47 NULL NULL NULL
CSF- 8 RC 107 Old Bill Cook Road (Buffington Rd to Old National Hwy) Tier 1 Maintenance and Safety Enhancements TSPLOST City of South Fulton Completed The Old Bill Cook Road (Buffington Rd to Old National Hwy) to be resurfaced... more
The Old Bill Cook Road (Buffington Rd to Old National Hwy) to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled.
NULL Not Applicable Not Applicable March, 2020 August, 2020 NULL Sales Tax $438,189 $458,162 $-19,973 Yellow Green Active roussan.francois@fultoncountyga.gov 2019 2021-05-03 16:14:51 NULL NULL NULL
CSF- 80 SU 701 Flat Shoals Rd at Hemperly Rd Tier 1 Operation and Safety Improvements TSPLOST City of South Fulton Planning The overall objective of this project is the redesign and reconstruction of... more
The overall objective of this project is the redesign and reconstruction of eleven (11) traffic signals along the Flat Shoals Road corridor to complement the proposed Advanced Traffic Management System (ATMS) along the corridor. Closed Circuit TV (CCTV) cameras will be installed as well as fiber optic drop cables to the cameras and existing traffic signals. Traffic signals will be timed to maintain coordinated traffic flow through the synchronized intersections. The progression of vehicles along the major roadway will be given priority even when the characteristics of the roadway traffic flow and control changes.
NULL NULL NULL July, 2019 NULL NULL Sales Tax $250,000 $0 $250,000 Green Green Active NULL NULL NULL NULL NULL NULL
SUM = 149,527,590 SUM = 63,061,247 SUM = 86,466,343