Actions Project ID Local ID Project Name Tier Project Type Initiatve Type City Current Stage Description Construction Firm Selected Design Firm Selected Estimated Design Completion Date Estimated Start Date For Project Estimated Construction Completion Date Estimated Substantial Completion Date Link To External Website Primary Funding Source TSPLOST Budget ($) TSPLOST Dollars Spent ($) TSPLOST Dollars Committed (not spent) ($) Cost Status Schedule Status Status Editor Project Year Last Update State Address Creation Date
CSF- 45 RS 399 Village Green Tier 1 Maintenance and Safety Enhancements TSPLOST City of South Fulton Completed The roads (North Star Trail and Windhaven Trail) within the subdivision to ... more
The roads (North Star Trail and Windhaven Trail) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled.
NULL Not Applicable Not Applicable NULL March, 2020 NULL Sales Tax $76,623 $78,900 $-2,277 Yellow Green Active roussan.francois@fultoncountyga.gov 2019 2021-05-03 20:27:25 NULL NULL NULL
CSF- 46 RS 401 Wexwood Glen Tier 1 Maintenance and Safety Enhancements TSPLOST City of South Fulton Completed The road (Kerry Drive) within the subdivision to be resurfaced may have eit... more
The road (Kerry Drive) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled.
NULL Not Applicable Not Applicable NULL July, 2021 NULL Sales Tax $40,227 $284,054 $-243,827 Green Green Active roussan.francois@fultoncountyga.gov 2020 2021-10-12 18:39:09 NULL NULL NULL
CSF- 47 RS 402 Will Lee Pines Tier 1 Maintenance and Safety Enhancements TSPLOST City of South Fulton Completed The roads (Fradon Court and Welcome All Terrace) within the subdivision to ... more
The roads (Fradon Court and Welcome All Terrace) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled.
CWM Not Applicable Not Applicable NULL November, 2018 NULL Sales Tax $93,864 $87,148 $6,716 Red Green Active roussan.francois@fultoncountyga.gov 2018 2021-05-03 20:28:49 NULL NULL NULL
CSF- 48 RS 403 Wolf Creek Forest Tier 1 Maintenance and Safety Enhancements TSPLOST City of South Fulton Completed The road (Wolf Creek Circle) within the sbdivision to be resurfaced may hav... more
The road (Wolf Creek Circle) within the sbdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled.
CWM Not Applicable Not Applicable NULL November, 2019 NULL Sales Tax $53,636 $35,151 $18,485 Red Green Active roussan.francois@fultoncountyga.gov 2018 2021-05-03 20:29:17 NULL NULL NULL
CSF- 49 RS 404 Woodland Estates Tier 1 Maintenance and Safety Enhancements TSPLOST City of South Fulton Completed The roads (Commonwood Place, Keels Lane, Smoke Ridge Drive II, Springtree C... more
The roads (Commonwood Place, Keels Lane, Smoke Ridge Drive II, Springtree Court, Squirrel Way, and Woody Path Lane) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled.
CWM Not Applicable Not Applicable NULL May, 2019 NULL Sales Tax $210,714 $129,044 $81,670 Green Green Active roussan.francois@fultoncountyga.gov 2018 2021-05-03 20:29:35 NULL NULL NULL
CSF- 5 RC 104 Creel Road (Old National Hwy to West Rd) Tier 1 Maintenance and Safety Enhancements TSPLOST City of South Fulton Completed The Creel Road (Old National Hwy to West Rd) to be resurfaced may have eith... more
The Creel Road (Old National Hwy to West Rd) to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled.
NULL Not Applicable Not Applicable March, 2019 August, 2019 NULL Sales Tax $295,100 $283,472 $11,628 Green Green Active roussan.francois@fultoncountyga.gov 2019 2021-05-03 16:11:47 NULL NULL NULL
CSF- 50 RS 405 Woodward Estates Tier 1 Maintenance and Safety Enhancements TSPLOST City of South Fulton Completed The roads (Amethist Court, Garnett Way, Mica Trace, Old Rocky Road, Rockway... more
The roads (Amethist Court, Garnett Way, Mica Trace, Old Rocky Road, Rockway Road, Rocky Court, Topaz Trail, Turquoise Trail, and Woodward Road) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled.
CWM Not Applicable Not Applicable NULL June, 2019 NULL Sales Tax $469,318 $294,440 $174,878 Green Green Active roussan.francois@fultoncountyga.gov 2018 2021-05-03 20:29:52 NULL NULL NULL
CSF- 51 B 500 Butner Road over Camp Creek Tier 1 Bridges TSPLOST City of South Fulton Land The proposed Butner Road over Camp Creek includes improvements to the bridg... more
The proposed Butner Road over Camp Creek includes improvements to the bridge that will extend to the Camp Creek Parkway edge of pavement on the south leg of the intersection. A new bridge is proposed to replace the existing near the Butner Road/Camp Creek Parkway intersection. The proposed bridge will be wide enough to accommodate two traffic lanes of 24-ft wide, 30'' curb and gutter and 12-ft wide pedestrian sidewalk on the west side to tie into a proposed multi-use trail off the bridge and 6-ft wide sidewalk on the east side. A turning lane will be designed off the bridge to finish free flow and stacking length up to the intersection with Camp Creek Parkway.
NULL William-Russell & Johnson December, 2022 April, 2028 April, 2028 NULL Sales Tax $121,685 $116,562 $5,123 Green Green Active roussan.francois@cityofsouthfultonga.gov 2019 2026-09-17 09:42:10 NULL NULL NULL
CSF- 52 RST 200 Camp Creek Village (SFR), (LL 73 Dist 14FF) Tier 1 Maintenance and Safety Enhancements TSPLOST City of South Fulton Completed The primary work is to resurface the final asphalt topping layer. The roads... more
The primary work is to resurface the final asphalt topping layer. The roads (Zultana and zoya) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work includes all necessary preparation work (e.g., full depth patching and a single surface treatment). The roads will then have the final asphalt topping layer installed in a manner that will provide uniformity of the asphalt. Milling of the existing asphalt surface is not expected to be required for these roadways.
E R Snell Not Applicable Not Applicable March, 2018 August, 2018 Not Applicable Sales Tax $44,140 $49,491 $-5,351 Red Green Active roussan.francois@fultoncountyga.gov 2017 2021-05-03 20:30:27 NULL NULL NULL
CSF- 53 B 501 Enon Road over Camp Creek Tributary (Timber Bridge) Tier 1 Bridges TSPLOST City of South Fulton Completed The proposed project will replace the existing culvert located on Enon Road... more
The proposed project will replace the existing culvert located on Enon Road between Enon Mill Drive and Enon Pines Drive. The deteriorated timber culvert will be removed and replaced with a structure to carry two 12-foot travel lanes and 8-foot shoulders, which include 6-foot sidewalks.
NULL AEI February, 2022 December, 2022 February, 2024 NULL Sales Tax $1,537,103 $1,530,803 $6,300 Green Green Active roussan.francois@cityofsouthfultonga.gov 2020 2026-09-17 09:45:25 NULL NULL NULL
CSF- 54 B 502 Bethsaida over Morning Creek Tier 2 Bridges TSPLOST City of South Fulton Construction Bridge replacement to be analyzed for a better rating capacity and alleviat... more
Bridge replacement to be analyzed for a better rating capacity and alleviate congestion.
NULL NULL NULL NULL April, 2028 April, 2028 Sales Tax $0 $0 $0 Gray Gray Active roussan.francois@cityofsouthfultonga.gov NULL 2026-09-17 09:48:38 NULL NULL NULL
CSF- 55 OSI 601 Butner Road @ Camp Creek Parkway Tier 1 Operation and Safety Improvements TSPLOST City of South Fulton Land The proposed Butner Road project is a capacity project that begins at the i... more
The proposed Butner Road project is a capacity project that begins at the intersection of Camp Creek Parkway and extends approximately 1,000 feet to the north along Butner Road. It consists of widening the existing Butner Road by adding left and right-turn lanes, providing a nature trail at-grade crossing and updating the intersection signalization and guardrails, as a safety measure, on the east side of Butner Road to Merk Road. The travel lanes will be minimum 11 foot-wide with 2-foot stamped concrete and 12-foot trail on the east side. This project also includes signal upgrade and installation of new decorative mast arms.
NULL American Engineers, Inc September, 2023 August, 2020 April, 2028 April, 2028 Sales Tax $82,045 $18,595 $63,450 Green Green Active roussan.francois@cityofsouthfultonga.gov 2017 2026-09-18 11:29:30 NULL NULL NULL
CSF- 56 OSI 602 Butner Road @ Union Road Tier 1 Operation and Safety Improvements TSPLOST City of South Fulton Completed This construction project at the Stop-controlled intersection at Butner Roa... more
This construction project at the Stop-controlled intersection at Butner Road and Union Road will build a single-lane roundabout to address a sharp angle intersection skew, congestion and reduce the severity of accidents at this intersection. Additional improvements with this project include improving storm drainage with a typical section consisting of a 2.5-ft. curb & gutter, 2-ft. stamped concrete beauty strip, and 5-ft. wide sidewalks throughout the project limits. The extent of construction is approximately 950 ft. along Butner Road and 800 ft. along Union Road
NULL American Engineers, Inc March, 2023 December, 2019 May, 2025 May, 2025 https://performance.fultoncountyga.gov/stories/s/v555-6sca Sales Tax $3,641,163 $3,641,163 $0 Green Green Active roussan.francois@cityofsouthfultonga.gov 2017 2026-09-18 11:32:03 NULL NULL NULL
CSF- 57 OSI 603 Butner Road @ Pittman Road Tier 1 Operation and Safety Improvements TSPLOST City of South Fulton Design The design project on Burner Road will improve traffic safety by realigning... more
The design project on Burner Road will improve traffic safety by realigning the approach of Pittman Road to eliminate an extreme angle of incidence at the intersection through the use of a roundabout. Additional improvements include a closed drainage system, 2.5-ft. curb & gutter, 2' stamped concrete, and 5 ft. sidewalks. Streetlights will be added during construction.
NULL AEI March, 2027 December, 2020 July, 2029 July, 2029 Sales Tax $143,672 $83,680 $59,992 Green Green Active roussan.francois@cityofsouthfultonga.gov 2020 2026-09-18 11:38:58 NULL NULL NULL
CSF- 58 OSI 604 Campbellton Road @ Stonewall Tell Road (Project Design on Hold) Tier 1 Operation and Safety Improvements TSPLOST City of South Fulton Completed This completed construction project included a realignment of the intersect... more
This completed construction project included a realignment of the intersection from a skewed intersection with a stop condition to standard 4-way intersection with a new traffic signal. Additional improvements included adding turning lanes in each direction along Campbellton Road and Stonewall Tell Road, installation of 5-feet sidewalks, curb and gutter, improved stormwater drainage, 2-feet stamp concrete, and installation of streetlights within the project limits.
CMC, INC American Engineers, Inc December, 2022 April, 2020 March, 2024 NULL Sales Tax $3,386,248 $3,386,248 $0 Red Green Active roussan.francois@cityofsouthfultonga.gov 2017 2026-09-18 11:55:23 NULL NULL NULL
CSF- 59 OSI 605 Campbellton-Fairburn Road @ Jones Road (Project Design on Hold) Tier 1 Operation and Safety Improvements TSPLOST City of South Fulton Design The project will install two single-lane roundabouts with a wide footprint ... more
The project will install two single-lane roundabouts with a wide footprint to potentially convert to multi-lane roundabouts in future on both intersections of SR 92 at Jones Road and SR 92 at Demooney Road. This project will be managed and funded by GDOT under their safety program.
NULL American Engineers, Inc August, 2018 NULL November, 2028 NULL Sales Tax $0 $0 $0 Green Green Active roussan.francois@cityofsouthfultonga.gov NULL 2026-09-18 12:01:25 NULL NULL NULL
CSF- 6 RC 105 Enon Road (Stonewall Tell Rd to Atlanta City limits) Tier 1 Maintenance and Safety Enhancements TSPLOST City of South Fulton Completed The Enon Road (Stonewall Tell Rd to Atlanta City limits)to be resurfaced ma... more
The Enon Road (Stonewall Tell Rd to Atlanta City limits)to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled.
NULL Not Applicable Not Applicable March, 2019 August, 2019 NULL Sales Tax $921,496 $752,801 $168,695 Green Green Active roussan.francois@fultoncountyga.gov 2018 2021-05-03 16:12:54 NULL NULL NULL
CSF- 60 OSI 606 Cascade-Palmetto Highway @ West Stubbs Road Tier 1 Operation and Safety Improvements TSPLOST City of South Fulton Completed The project and plans reflect the installation of a new signal at the inter... more
The project and plans reflect the installation of a new signal at the intersection of Cascade Palmetto Highway and West Stubbs Road. In addition, it includes the installation of curb & gutter, a solar powered advanced signal warning sign, ADA ramps, and signing & marking. The existing non-signalized intersection already includes the necessary turn lanes and right of way.
NULL Not Applicable Not Applicable May, 2018 November, 2018 NULL Sales Tax $1,554,000 $272,757 $1,281,243 Green Green Active roussan.francois@fultoncountyga.gov 2019 2021-05-03 22:46:16 NULL NULL NULL
CSF- 61 OSI 607 Demooney Road @ West Stubbs Road Tier 1 Operation and Safety Improvements TSPLOST City of South Fulton Bidding This design project at Demooney Road and West Stubbs Road will include the ... more
This design project at Demooney Road and West Stubbs Road will include the addition of a single lane roundabout to address congestion and reduce the severity of accidents at this 2-way Stop controlled intersection. Additional improvements include a closed drainage system, 2.5-ft. curb & gutter, 2' stamped concrete, and 5 ft. sidewalks. Streetlights will be added during construction.
NULL AEI August, 2026 December, 2020 October, 2027 October, 2027 Sales Tax $187,298 $182,533 $4,765 Green Green Active roussan.francois@cityofsouthfultonga.gov 2021 2026-09-18 12:08:41 NULL NULL NULL
CSF- 62 OSI 608 Enon Road @ Stonewall Tell Road Tier 1 Operation and Safety Improvements TSPLOST City of South Fulton Land The roundabout at Enon Road and Stonewall Tell Road will replace the curren... more
The roundabout at Enon Road and Stonewall Tell Road will replace the current stop-controlled intersection. The typical section consists of two 11-ft. travel lanes with curb and gutter, and a 2 ft stamped concrete buffer. Five-foot sidewalks will be constructed on both shoulders for the length of the project. Streetlights will be installed throughout the length of the project.
NULL AEI February, 2026 December, 2020 October, 2027 October, 2027 Sales Tax $284,743 $284,743 $0 Green Green Active roussan.francois@cityofsouthfultonga.gov 2021 2026-09-18 12:14:34 NULL NULL NULL