Multi-Use Trail
Old National Highway to Nunn Woods Way
NULL
NULL
October, 2024
October, 2024
October, 2025
October, 2025
Sales Tax
$3,600,000
$0
$3,600,000
NULL
NULL
Active
jeff.mueller@cityofsouthfultonga.gov
2024
2023-03-02 21:21:48
Georgia
Bethsaida Road
2022-03-31
CSF- 299
NULL
Intersection Control Evaluation (ICE)
Tier 3
Operation and Safety Improvements
TSPLOST2
City of South Fulton
Planning
NULL
NULL
NULL
NULL
NULL
NULL
Sales Tax
$0
$0
$0
NULL
NULL
Active
jeff.mueller@cityofsouthfultonga.gov
NULL
2023-03-02 19:54:35
Georgia
City of South Fulton
2022-03-31
CSF- 3
RC 102
Cascade Road (Fulton Ind Blvd to Beechcrest Road SW)
Tier 1
Maintenance and Safety Enhancements
TSPLOST
City of South Fulton
Completed
The Cascade Road (Fulton Ind Blvd to Beechcrest Road SW) to be resurfaced m... more
The Cascade Road (Fulton Ind Blvd to Beechcrest Road SW) to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled.
CW Matthews
Not Applicable
Not Applicable
NULL
November, 2018
NULL
Sales Tax
$1,356,984
$1,336,163
$20,821
Green
Green
Active
roussan.francois@fultoncountyga.gov
2018
2021-05-03 16:08:49
NULL
NULL
NULL
CSF- 30
RS 386
Sherbrook Forest
Tier 1
Maintenance and Safety Enhancements
TSPLOST
City of South Fulton
Completed
The roads (Sherbrook Court and Sherbrook Drive) within the subdivision to b... more
The roads (Sherbrook Court and Sherbrook Drive) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled.
NULL
Not Applicable
Not Applicable
NULL
July, 2021
NULL
Sales Tax
$72,792
$137,122
$-64,330
Green
Green
Active
roussan.francois@fultoncountyga.gov
2021
2021-10-12 19:02:15
NULL
NULL
NULL
CSF- 300
T 271
Fairburn Road
Tier 1
Pedestrian and Bike Improvements
TSPLOST2
City of South Fulton
Planning
The project is located on Fairburn Road, starting at Cascade Road and conti... more
The project is located on Fairburn Road, starting at Cascade Road and continuing to North Utoy Creek. The typical section includes 12' travel lanes, curb and gutter, a 10-foot multi-use path on the West side and a 6-foot wide sidewalk behind a 2-foot stamped concrete strip on the east side of Fairburn Road. Improvements also include bridge replacements at North and South Utoy Creek with bottomless culverts and turning lane improvements at the Fairburn Road/Cascade Road intersection. Also included as part of CSF-349
NULL
Qk4
November, 2022
March, 2023
September, 2024
September, 2024
Sales Tax
$2,045,000
$37,000
$2,008,000
NULL
NULL
Active
jeff.mueller@cityofsouthfultonga.gov
2023
2023-03-02 21:29:15
Georgia
Fairburn Road
2022-03-31
CSF- 301
P 903
Cascade Road
Tier 1
Pedestrian and Bike Improvements
TSPLOST2
City of South Fulton
Planning
Multi-Use Trail
City of Altanta Limits to Fulton Industrial Blvd
NULL
NULL
March, 2026
March, 2026
June, 2027
June, 2027
Sales Tax
$6,632,000
$0
$6,632,000
NULL
NULL
Active
jeff.mueller@cityofsouthfultonga.gov
2026
2023-03-02 21:24:02
Georgia
Cascade Road
2022-03-31
CSF- 302
P 908
Flat Shoals Road
Tier 1
Pedestrian and Bike Improvements
TSPLOST2
City of South Fulton
Planning
Multi-Use Trail
Old National Highway to Buffington Road
NULL
NULL
October, 2027
October, 2027
March, 2029
March, 2029
Sales Tax
$5,427,000
$0
$5,427,000
NULL
NULL
Active
jeff.mueller@cityofsouthfultonga.gov
2027
2023-03-02 21:33:31
Georgia
Flat Shoals Road
2022-03-31
CSF- 303
P 910
Jerome Road
Tier 1
Pedestrian and Bike Improvements
TSPLOST2
City of South Fulton
Planning
Fill in sidewalk gaps within the existing sidewalk network.
Old National H... more
Fill in sidewalk gaps within the existing sidewalk network.
Old National Highway to Old Bill Cook Road
NULL
NULL
June, 2024
June, 2024
March, 2025
March, 2025
Sales Tax
$1,500,000
$0
$1,500,000
NULL
NULL
Active
jeff.mueller@cityofsouthfultonga.gov
2025
2023-03-02 21:41:10
Georgia
Jerome Road
2022-03-31
CSF- 304
P 914
Union Road
Tier 1
Pedestrian and Bike Improvements
TSPLOST2
City of South Fulton
Planning
Fill in sidewalk gaps within the existing sidewalk network.
Campbellton Ro... more
Fill in sidewalk gaps within the existing sidewalk network.
Campbellton Road to Vandiver Road
NULL
NULL
December, 2023
December, 2024
December, 2025
December, 2025
Sales Tax
$1,200,000
$0
$1,200,000
NULL
NULL
Active
jeff.mueller@cityofsouthfultonga.gov
2024
2023-03-02 21:45:54
Georgia
Union Road
2022-03-31
CSF- 305
P 911
Merk Road
Tier 1
Pedestrian and Bike Improvements
TSPLOST2
City of South Fulton
Planning
Multi-Use Trail
Camp Creek Parkway to Aldredge Road
NULL
NULL
September, 2025
September, 2025
June, 2026
June, 2026
Sales Tax
$2,720,000
$0
$2,720,000
NULL
NULL
Active
jeff.mueller@cityofsouthfultonga.gov
2026
2023-03-02 21:43:07
Georgia
Merk Road
2022-03-31
CSF- 306
P 909
Fulton Industrial Area
Tier 1
Pedestrian and Bike Improvements
TSPLOST2
City of South Fulton
Planning
Sidewalk Gaps
Various Locations in Fulton Industrial Blvd District
NULL
NULL
April, 2024
April, 2024
November, 2024
November, 2024
Sales Tax
$1,000,000
$0
$1,000,000
NULL
NULL
Active
jeff.mueller@cityofsouthfultonga.gov
2024
2023-03-02 21:37:07
Georgia
Fulton Industrial Area
2022-03-31
CSF- 307
P 906
Welcome All Road
Tier 1
Pedestrian and Bike Improvements
TSPLOST2
City of South Fulton
Planning
Multi-Use Trail
Roosevelt Highway to Will Lee Road
NULL
NULL
August, 2024
September, 2025
September, 2026
September, 2026
Sales Tax
$2,940,000
$0
$2,940,000
NULL
NULL
Active
jeff.mueller@cityofsouthfultonga.gov
2025
2023-03-02 21:50:01
Georgia
Welcome All Road
2022-03-31
CSF- 308
NULL
Harris Rd
Tier 2
Bridges
TSPLOST2
City of South Fulton
Planning
NULL
NULL
NULL
NULL
NULL
NULL
NULL
Sales Tax
NULL
NULL
$0
NULL
NULL
Active
NULL
NULL
NULL
Georgia
Harris Rd
2022-03-31
CSF- 309
NULL
Bethsaida Road
Tier 2
Operation and Safety Improvements
TSPLOST2
City of South Fulton
Planning
NULL
NULL
NULL
NULL
NULL
NULL
NULL
Sales Tax
NULL
NULL
$0
NULL
NULL
Active
NULL
NULL
NULL
Georgia
Bethsaida Road
2022-03-31
CSF- 31
RC 111
Merk Road (Butner Rd to Union Rd)
Tier 2
Maintenance and Safety Enhancements
TSPLOST
City of South Fulton
Construction
The Merk Road (Butner Rd to Union Rd) to be resurfaced may have either exis... more
The Merk Road (Butner Rd to Union Rd) to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled.