Here you can select the number of cards to be placed in a row for each of supported screen resolutions. Your current resolution is highlighted in this way.
This design project will build up to 1.8 mi. of sidewalk facilities where n... more
This design project will build up to 1.8 mi. of sidewalk facilities where needed along both sides of Bethsaida Road from Old National Highway to Nunn Woods Way. This project also adds storm drainage facilities. The typical section includes a 2-ft. stamped concrete beauty strip and a 2.5-ft. curb and gutter
NULL
STV - AEI
April, 2028
August, 2024
August, 2030
August, 2030
Sales Tax
$348,843
$82,710
$266,133
NULL
NULL
Active
roussan.francois@cityofsouthfultonga.gov
2024
2026-09-17 10:39:34
Georgia
Bethsaida Road
2022-03-31
CSF- 299
NULL
Intersection Control Evaluation (ICE)
Tier 3
Operation and Safety Improvements
TSPLOST2
City of South Fulton
Planning
NULL
NULL
NULL
NULL
NULL
NULL
Sales Tax
$0
$0
$0
NULL
NULL
Active
jeff.mueller@cityofsouthfultonga.gov
NULL
2023-03-02 19:54:35
Georgia
City of South Fulton
2022-03-31
CSF- 3
RC 102
Cascade Road (Fulton Ind Blvd to Beechcrest Road SW)
Tier 1
Maintenance and Safety Enhancements
TSPLOST
City of South Fulton
Completed
The Cascade Road (Fulton Ind Blvd to Beechcrest Road SW) to be resurfaced m... more
The Cascade Road (Fulton Ind Blvd to Beechcrest Road SW) to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled.
CW Matthews
Not Applicable
Not Applicable
NULL
November, 2018
NULL
Sales Tax
$1,356,984
$1,336,163
$20,821
Green
Green
Active
roussan.francois@fultoncountyga.gov
2018
2021-05-03 16:08:49
NULL
NULL
NULL
CSF- 30
RS 386
Sherbrook Forest
Tier 1
Maintenance and Safety Enhancements
TSPLOST
City of South Fulton
Completed
The roads (Sherbrook Court and Sherbrook Drive) within the subdivision to b... more
The roads (Sherbrook Court and Sherbrook Drive) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled.
NULL
Not Applicable
Not Applicable
NULL
July, 2021
NULL
Sales Tax
$72,792
$137,122
$-64,330
Green
Green
Active
roussan.francois@fultoncountyga.gov
2021
2021-10-12 19:02:15
NULL
NULL
NULL
CSF- 300
T 271
Fairburn Road
Tier 1
Pedestrian and Bike Improvements
TSPLOST2
City of South Fulton
Construction
The project is located on Fairburn Road, starting at Cascade Road and conti... more
The project is located on Fairburn Road, starting at Cascade Road and continuing to North Utoy Creek. The typical section includes 12' travel lanes, curb and gutter, a 10-foot multi-use path on the West side and a 6-foot wide sidewalk behind a 2-foot stamped concrete strip on the east side of Fairburn Road. Improvements also include bridge replacements at North and South Utoy Creek with bottomless culverts and turning lane improvements at the Fairburn Road/Cascade Road intersection. Also included as part of CSF-349
NULL
Qk4
November, 2022
March, 2023
December, 2026
December, 2026
Sales Tax
$7,142,452
$1,349,760
$5,792,692
NULL
NULL
Active
roussan.francois@cityofsouthfultonga.gov
2023
2026-09-17 10:39:06
Georgia
Fairburn Road
2022-03-31
CSF- 301
P 903
Cascade Road
Tier 1
Pedestrian and Bike Improvements
TSPLOST2
City of South Fulton
Design
This design project will build up to 3.8 mi. of sidewalk facilities where n... more
This design project will build up to 3.8 mi. of sidewalk facilities where needed along both sides of Cascade from the Atlanta City Limits to Fulton Industrial Blvd. An Audit was done to determine which locations need this work performed. This project also adds storm drainage facilities. The typical section includes a 2-ft. stamped concrete beauty strip and a 2.5-ft. curb and gutter.
NULL
NULL
March, 2029
March, 2029
June, 2027
June, 2027
Sales Tax
$581,035
$261,979
$319,056
NULL
NULL
Active
roussan.francois@cityofsouthfultonga.gov
2026
2026-09-17 10:30:07
Georgia
Cascade Road
2022-03-31
CSF- 302
P 908
Flat Shoals Road
Tier 1
Pedestrian and Bike Improvements
TSPLOST2
City of South Fulton
Design
This design project will build up to 2.5 mi. of sidewalk facilities where n... more
This design project will build up to 2.5 mi. of sidewalk facilities where needed along both sides of Flat Shoals from Buffington Road to Old National Highway. An Audit was done to determine which locations need this work performed. This project also adds storm drainage facilities. The typical section includes a 2-ft. stamped concrete beauty strip and a 2.5-ft. curb and gutter.
NULL
NULL
November, 2028
September, 2024
March, 2029
March, 2029
Sales Tax
$536,925
$158,167
$378,758
NULL
NULL
Active
roussan.francois@cityofsouthfultonga.gov
2027
2026-09-17 10:27:16
Georgia
Flat Shoals Road
2022-03-31
CSF- 303
P 910
Jerome Road
Tier 1
Pedestrian and Bike Improvements
TSPLOST2
City of South Fulton
Design
This design project will fill in sidewalk gaps within the existing sidewalk... more
This design project will fill in sidewalk gaps within the existing sidewalk network on 0.8 mi Jerome between Old National Highway and Old Bill Cook Road. This project also adds storm drainage facilities. The typical section includes a 2-ft. stamped concrete beauty strip and a 2.5-ft. curb and gutter.
NULL
NULL
August, 2028
August, 2025
December, 2029
December, 2029
Sales Tax
$207,540
$78,433
$129,107
NULL
NULL
Active
roussan.francois@cityofsouthfultonga.gov
2025
2026-09-17 10:24:45
Georgia
Jerome Road
2022-03-31
CSF- 304
P 914
Union Road
Tier 1
Pedestrian and Bike Improvements
TSPLOST2
City of South Fulton
Design
This project will fill in sidewalk gaps within the existing 1.15 mi. sidewa... more
This project will fill in sidewalk gaps within the existing 1.15 mi. sidewalk network. Owl Rock Road to Bunting Lane. The project will add 6-ft sidewalks, 2 ft. stamped concrete buffer, 2.5 ft. curb and gutter and drainage facilities throughout as needed. Pedestrian scale streetlights will be considered during project construction.
NULL
Khafra
August, 2027
April, 2024
June, 2029
June, 2029
Sales Tax
$305,617
$0
$305,617
NULL
NULL
Active
roussan.francois@cityofsouthfultonga.gov
2024
2026-09-17 10:22:09
Georgia
Union Road
2022-03-31
CSF- 305
P 911
Merk Road
Tier 1
Pedestrian and Bike Improvements
TSPLOST2
City of South Fulton
Design
This design project will build up .75 mi. of sidewalk facilities where need... more
This design project will build up .75 mi. of sidewalk facilities where needed along both sides of Merk Rd. from Sanford J Jones to Miles Rd. It also adds storm drainage facilities. The typical section includes a 2.5-ft. curb and gutter, and a 2-ft. stamped concrete beauty strip. There will be 6 ft. and 8 ft. wide sidewalks. Streetlights will be installed throughout the length of the project.
NULL
STV - AEI
March, 2027
July, 2025
June, 2028
June, 2028
Sales Tax
$246,059
$39,101
$206,958
NULL
NULL
Active
roussan.francois@cityofsouthfultonga.gov
2026
2026-09-17 10:19:08
Georgia
Merk Road
2022-03-31
CSF- 306
P 909
Fulton Industrial Area
Tier 1
Pedestrian and Bike Improvements
TSPLOST2
City of South Fulton
Planning
Sidewalk Gaps
Various Locations in Fulton Industrial Blvd District
NULL
NULL
April, 2024
April, 2024
November, 2024
November, 2024
Sales Tax
$1,000,000
$0
$1,000,000
NULL
NULL
Active
jeff.mueller@cityofsouthfultonga.gov
2024
2023-03-02 21:37:07
Georgia
Fulton Industrial Area
2022-03-31
CSF- 307
P 906
Welcome All Road
Tier 1
Pedestrian and Bike Improvements
TSPLOST2
City of South Fulton
Planning
Multi-Use Trail
Roosevelt Highway to Will Lee Road
NULL
NULL
August, 2024
September, 2025
September, 2026
September, 2026
Sales Tax
$2,940,000
$0
$2,940,000
NULL
NULL
Active
jeff.mueller@cityofsouthfultonga.gov
2025
2023-03-02 21:50:01
Georgia
Welcome All Road
2022-03-31
CSF- 308
NULL
Harris Rd
Tier 2
Bridges
TSPLOST2
City of South Fulton
Planning
NULL
NULL
NULL
NULL
NULL
NULL
NULL
Sales Tax
NULL
NULL
$0
NULL
NULL
Active
NULL
NULL
NULL
Georgia
Harris Rd
2022-03-31
CSF- 309
NULL
Bethsaida Road
Tier 2
Operation and Safety Improvements
TSPLOST2
City of South Fulton
Planning
NULL
NULL
NULL
NULL
NULL
NULL
NULL
Sales Tax
NULL
NULL
$0
NULL
NULL
Active
NULL
NULL
NULL
Georgia
Bethsaida Road
2022-03-31
CSF- 31
RC 111
Merk Road (Butner Rd to Union Rd)
Tier 2
Maintenance and Safety Enhancements
TSPLOST
City of South Fulton
Completed
The Merk Road (Butner Rd to Union Rd) to be resurfaced may have either exis... more
The Merk Road (Butner Rd to Union Rd) to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled.