The roads (Old Bethsaida Way and Robinson Wood Drive) within the subdivisio... more
The roads (Old Bethsaida Way and Robinson Wood Drive) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled.
NULL
Not Applicable
Not Applicable
NULL
November, 2020
NULL
Sales Tax
$68,961
$92,695
$-23,734
Red
Green
Active
roussan.francois@fultoncountyga.gov
2019
2021-05-03 20:17:33
NULL
NULL
NULL
CSF- 280
RS 431
Retreat at Jones Mill
Tier 1
Maintenance and Safety Enhancements
TSPLOST2
City of South Fulton
Bidding
Deep base repair as needed, milling and resurface
Shamrock Drive
NULL
NULL
Not Applicable
April, 2024
August, 2024
August, 2024
Sales Tax
$116,000
$0
$116,000
NULL
NULL
Active
jeff.mueller@cityofsouthfultonga.gov
2024
2023-02-28 21:42:40
Georgia
Retreat at Jones Mill
2022-03-31
CSF- 281
RS 433
Three Lakes
Tier 1
Maintenance and Safety Enhancements
TSPLOST2
City of South Fulton
Bidding
Deep base repair as needed, milling and resurface
Three Lakes Drive
Twin ... more
Deep base repair as needed, milling and resurface
Three Lakes Drive
Twin Lakes Drive
Meadow Lake Road
NULL
NULL
Not Applicable
April, 2025
August, 2025
August, 2025
Sales Tax
$114,000
$0
$114,000
NULL
NULL
Active
jeff.mueller@cityofsouthfultonga.gov
2025
2023-02-28 21:53:39
Georgia
Three Lakes
2022-03-31
CSF- 282
RS 435
Wolf Creek Country (Excluding Current Toppings)
Tier 1
Maintenance and Safety Enhancements
TSPLOST2
City of South Fulton
Bidding
Deep base repair as needed, milling and resurface
Wolf Club Drive
Wolf Cl... more
Deep base repair as needed, milling and resurface
Wolf Club Drive
Wolf Club Court
Wolf Lake Court
Wolf Den Lane
Wolf Trail
Wolf Lake Drive
Wolf View Court
NULL
NULL
Not Applicable
April, 2025
August, 2025
August, 2025
Sales Tax
$306,000
$0
$306,000
NULL
NULL
Active
jeff.mueller@cityofsouthfultonga.gov
2025
2023-02-28 21:57:39
Georgia
Wolf Creek Country
2022-03-31
CSF- 283
T 276
Cochran Road over Deep Creek
Tier 1
Bridges
TSPLOST2
City of South Fulton
Completed
The proposed project will replace the bridge carrying Cochran Road over Dee... more
The proposed project will replace the bridge carrying Cochran Road over Deep Creek. The project begins 280 ft. south of the existing bridge and ends 280 ft. north of the existing bridge. This project would replace the existing substandard bridge over Deep Creek with a new structure and new roadway approaches. The proposed mainline will consist of two 11Æ-0ö travel lane and curb and gutter in each direction. Sidewalks will be constructed in each direction for the full project length. A 2.0Æ buffer will be provided between the sidewalk and curb.
NULL
Long Engineering
December, 2022
December, 2023
March, 2025
NULL
Sales Tax
$4,427,257
$4,427,257
$0
NULL
Green
Active
roussan.francois@cityofsouthfultonga.gov
2023
2026-09-17 09:24:27
Georgia
Cochran Road
2022-03-31
CSF- 284
RS 436
Woodside Hills
Tier 1
Maintenance and Safety Enhancements
TSPLOST2
City of South Fulton
Bidding
Deep base repair as needed, milling and resurface
Woodside Drive
Fern Val... more
Deep base repair as needed, milling and resurface
Woodside Drive
Fern Valley Drive
Fern Valley Court
Green Hill Court
Reynolds Road
Red Berry Lane
Zane Drive
Faron Drive
NULL
NULL
Not Applicable
April, 2024
August, 2024
August, 2024
Sales Tax
$337,000
$0
$337,000
NULL
NULL
Active
jeff.mueller@cityofsouthfultonga.gov
2024
2023-02-28 21:59:44
Georgia
Woodside Hills
2022-03-31
CSF- 285
B 505
Derrick Rd over Deep Creek Tributary
Tier 1
Bridges
TSPLOST2
City of South Fulton
Design
Bridge replacement of an aging bridge to meet a better rating capacity. The... more
Bridge replacement of an aging bridge to meet a better rating capacity. The design consultant will evaluate
the site survey and hydraulic study and size the proper culvert/bridge replacement. A complete street
solution will be employed within the project limits.
NULL
American Engineers, Inc.
August, 2027
August, 2024
November, 2028
November, 2028
Sales Tax
$352,517
$38,420
$314,097
NULL
NULL
Active
roussan.francois@cityofsouthfultonga.gov
2025
2026-09-17 09:19:21
Georgia
Derrick Rd
2022-03-31
CSF- 286
T 270
Demooney Road over Deep Creek
Tier 1
Bridges
TSPLOST2
City of South Fulton
Land
The project begins 1,000' southwest of the existing bridge and ends 980' no... more
The project begins 1,000' southwest of the existing bridge and ends 980' northeast of the existing bridge. It will replace the existing substandard bridge with a new structure and new roadway approaches. The proposed typical section consists of 12' travel lanes with curb and gutter along with sidewalks in each direction within the project limits.
NULL
Long Engineering
April, 2023
July, 2023
December, 2027
February, 2027
Sales Tax
$12,125
$2,400
$9,725
NULL
NULL
Active
roussan.francois@cityofsouthfultonga.gov
2023
2026-09-17 09:28:27
Georgia
Demooney Road
2022-03-31
CSF- 287
B 508
Koweta Rd over Deep Creek
Tier 1
Bridges
TSPLOST2
City of South Fulton
Design
Bridge replacement to meet better rating capacity. The design consultant wi... more
Bridge replacement to meet better rating capacity. The design consultant will evaluate the site survey and
hydraulic study and size the proper culvert/bridge replacement. A complete street solution will be employed
within the project limits
NULL
NULL
June, 2025
June, 2026
November, 2028
October, 2028
Sales Tax
$354,717
$31,613
$323,104
NULL
NULL
Active
roussan.francois@cityofsouthfultonga.gov
2026
2026-09-17 09:42:26
Georgia
Koweta Rd
2022-03-31
CSF- 288
T 271
Fairburn Rd
Tier 1
Bridges
TSPLOST2
City of South Fulton
Construction
The project is located on Fairburn Road, starting at Cascade Road and conti... more
The project is located on Fairburn Road, starting at Cascade Road and continuing to North Utoy Creek. The typical section includes 12' travel lanes, curb and gutter, a 10-foot multi-use path on the West side and a 6-foot wide sidewalk behind a 2-foot stamped concrete strip on the east side of Fairburn Road. Improvements also include bridge replacements at North and South Utoy Creek with bottomless culverts and turning lane improvements at the Fairburn Road/Cascade Road intersection.
NULL
Qk4
November, 2022
March, 2023
December, 2026
December, 2026
Sales Tax
$2,528,158
$2,506,248
$21,910
NULL
Yellow
Active
roussan.francois@cityofsouthfultonga.gov
2023
2026-09-17 09:34:06
Georgia
Fairburn Rd
2022-03-31
CSF- 289
B 510 / T 288
Stacks Rd over CSX RR
Tier 1
Bridges
TSPLOST2
City of South Fulton
Design
This project consists of replacement of bridge structure on Stacks Road ove... more
This project consists of replacement of bridge structure on Stacks Road over the CSX Railroad. The new bridge will span 200 feet over the CSX railroad tracks below and will have a sidewalk on the south side of the bridge. Sidewalk will be extended along Stacks Road 400 feet to the west and 300 feet to the east.
NULL
American Engineers, Inc.
December, 2023
June, 2024
July, 2028
July, 2028
Sales Tax
$197,332
$108,044
$89,288
NULL
Green
Active
roussan.francois@cityofsouthfultonga.gov
2024
2026-09-17 09:36:40
Georgia
Stacks Rd
2022-03-31
CSF- 29
RS 385
Sable Chase S/D
Tier 1
Maintenance and Safety Enhancements
TSPLOST
City of South Fulton
Completed
The roads (Carriage Chase Road, Devon Chase Road, Sable Chase Lane, Sable G... more
The roads (Carriage Chase Road, Devon Chase Road, Sable Chase Lane, Sable Glen Lane, Sable Glen Road, Sable Run Road, and Sable View Lane) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled.
NULL
Not Applicable
Not Applicable
NULL
July, 2021
NULL
Sales Tax
$480,812
$326,570
$154,242
Green
Green
Active
roussan.francois@fultoncountyga.gov
2020
2021-10-12 18:33:56
NULL
NULL
NULL
CSF- 290
OSI 620
Aldredge Road and Merk Road
Tier 1
Operation and Safety Improvements
TSPLOST2
City of South Fulton
Planning
Intersection improvements will include the addition of a circular roundabou... more
Intersection improvements will include the addition of a circular roundabout to address congestion and reduce the severity of accidents at this intersection. Additional improvements include drainage, curb & gutter, streetlights, and 5' wide sidewalks.
NULL
NULL
November, 2025
November, 2025
March, 2027
March, 2027
Sales Tax
$1,550,000
$0
$1,550,000
NULL
NULL
Active
jeff.mueller@cityofsouthfultonga.gov
2025
2023-03-02 19:22:10
Georgia
Aldredge Road
2022-03-31
CSF- 291
OSI 622
Bethlehem Rd and Cedar Grove Rd
Tier 1
Operation and Safety Improvements
TSPLOST2
City of South Fulton
Design
The T-intersection with a Stop control is being analyzed for traffic improv... more
The T-intersection with a Stop control is being analyzed for traffic improvements including a roundabout alternative. Additional improvements include 2.5-ft. curb & gutter, 2-ft. stamped concrete buffer, drainage, 5-ft. sidewalks, and streetlights. The proposed project will improve safety and relieve congestion.
NULL
NULL
September, 2026
April, 2024
January, 2029
January, 2029
Sales Tax
$189,750
$31,500
$158,250
NULL
NULL
Active
roussan.francois@cityofsouthfultonga.gov
2026
2026-09-22 09:03:21
Georgia
Bethlehem Rd
2022-03-31
CSF- 292
OSI 600
Bethsaida Road and Creel / West Road
Tier 1
Operation and Safety Improvements
TSPLOST2
City of South Fulton
Design
The Bethsaida Road at Creel Road/West Rd Design projects is to analyze the ... more
The Bethsaida Road at Creel Road/West Rd Design projects is to analyze the 4-way Stop controlled intersection for traffic improvements including a roundabout alternative. Additional improvements include a closed drainage system, 2.5-ft. curb & gutter, 2' stamped concrete, and 5 ft. sidewalks. Streetlights will be added during construction.
NULL
NULL
December, 2026
April, 2024
March, 2029
May, 2029
Sales Tax
$186,475
$30,801
$155,674
NULL
NULL
Active
roussan.francois@cityofsouthfultonga.gov
NULL
2026-09-18 11:24:14
Georgia
Bethsaida Rd
2022-03-31
CSF- 293
OSI 623
Butner Road and Aldredge Road
Tier 1
Operation and Safety Improvements
TSPLOST2
City of South Fulton
Design
The T-intersection with a Stop control is being analyzed for traffic improv... more
The T-intersection with a Stop control is being analyzed for traffic improvements including a roundabout alternative. Additional improvements include 2.5-ft. curb & gutter, 2-ft. stamped concrete buffer, drainage, 5-ft. sidewalks, and streetlights. The proposed project will improve safety and relieve congestion.
NULL
NULL
November, 2026
April, 2024
January, 2029
February, 2029
Sales Tax
$195,965
$28,400
$167,565
NULL
NULL
Active
roussan.francois@cityofsouthfultonga.gov
2026
2026-09-22 09:06:24
Georgia
Butner Road
2022-03-31
CSF- 294
NULL
Intersection Improvements
Tier 2
Operation and Safety Improvements
TSPLOST2
City of South Fulton
Planning
NULL
NULL
NULL
NULL
NULL
NULL
Sales Tax
$0
$0
$0
NULL
NULL
Active
jeff.mueller@cityofsouthfultonga.gov
NULL
2023-03-02 19:19:03
Georgia
City of South Fulton
2022-03-31
CSF- 295
OSI 628
Old Fairburn Road and Thaxton Road
Tier 1
Operation and Safety Improvements
TSPLOST2
City of South Fulton
Design
The current 3-way Stop intersection is being analyzed for traffic improveme... more
The current 3-way Stop intersection is being analyzed for traffic improvements including a roundabout alternative. Additional improvements include 2.5-ft. curb & gutter, 2-ft. stamped concrete buffer, drainage, 5-ft. sidewalks, and streetlights. The proposed project will improve safety and relieve congestion.
NULL
NULL
March, 2027
April, 2024
January, 2029
January, 2029
Sales Tax
$196,625
$35,150
$161,475
NULL
NULL
Active
roussan.francois@cityofsouthfultonga.gov
2026
2026-09-22 09:42:34
Georgia
Old Fairburn Road
2022-03-31
CSF- 296
OSI 629
Ono Rd/Hobgood Rd and Rivertown Rd
Tier 1
Operation and Safety Improvements
TSPLOST2
City of South Fulton
Design
The 4-leg Stop controlled intersection was analyzed for traffic improvement... more
The 4-leg Stop controlled intersection was analyzed for traffic improvements and a roundabout alternative was selected. Additional improvements include 2.5-ft. curb & gutter, 2-ft. stamped concrete buffer, drainage, 5-ft. sidewalks, and streetlights. The proposed project will improve safety and relieve congestion.
NULL
NULL
December, 2027
April, 2024
March, 2029
March, 2029
Sales Tax
$258,060
$90,999
$167,061
NULL
NULL
Active
roussan.francois@cityofsouthfultonga.gov
2024
2026-09-22 09:45:38
Georgia
Ono Rd/Hobgood Rd
2022-03-31
CSF- 297
OSI 801
Cascade Road (New Hope to City of Atlanta)
Tier 1
Operation and Safety Improvements
TSPLOST2
City of South Fulton
Planning
Connected vehicles deployment phase 2: connected vehicle signal communicat... more
Connected vehicles deployment phase 2: connected vehicle signal communication upgrades, including all signals on all roads, excluding those already upgraded or programmed for upgrade through CV1K initiative or through connected vehicles deployment phase 1