Here you can select the number of cards to be placed in a row for each of supported screen resolutions. Your current resolution is highlighted in this way.
Bethsaida Road (Jonesboro Rd to Clayton County Ln)
Tier 1
Maintenance and Safety Enhancements
TSPLOST
City of South Fulton
Completed
The Bethsaida Road (Jonesboro Rd to Clayton County Ln) to be resurfaced may... more
The Bethsaida Road (Jonesboro Rd to Clayton County Ln) to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled.
NULL
Not Applicable
Not Applicable
NULL
November, 2018
NULL
Sales Tax
$697,059
$614,322
$82,737
Green
Green
Inactive
steve.williams@fultoncountyga.gov
2018
2021-10-12 13:20:26
NULL
NULL
NULL
CSF- 10
RC 109
Rivertown Road (Chattahoochee Hills City limits to Fairburn City Limits)
Tier 1
Maintenance and Safety Enhancements
TSPLOST
City of South Fulton
Completed
The Rivertown Road (Chattahoochee City Limits to Fairburn City Limits) to b... more
The Rivertown Road (Chattahoochee City Limits to Fairburn City Limits) to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled.
NULL
Not Applicable
Not Applicable
March, 2019
August, 2019
NULL
Sales Tax
$872,352
$726,550
$145,802
Green
Green
Active
roussan.francois@fultoncountyga.gov
2018
2021-05-03 16:16:33
NULL
NULL
NULL
CSF- 100
RST 208
Merrywood I-III (LL 159/162 Dist 13)
Tier 1
Maintenance and Safety Enhancements
TSPLOST
City of South Fulton
Completed
The primary work is to resurface the final asphalt topping layer. The roads... more
The primary work is to resurface the final asphalt topping layer. The roads (Merrywood Ct, Merrywood Dr, and Smokeridge Dr) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work includes all necessary preparation work (e.g., full depth patching and a single surface treatment). The roads will then have the final asphalt topping layer installed in a manner that will provide uniformity of the asphalt. Milling of the existing asphalt surface is not expected to be required for these roadways.
E R Snell
Not Applicable
Not Applicable
March, 2018
August, 2018
Not Applicable
Sales Tax
$94,383
$97,351
$-2,968
Red
Green
Active
roussan.francois@fultoncountyga.gov
2017
2021-05-03 16:40:02
NULL
NULL
NULL
CSF- 101
RST 209
Overlook Camp Creek 1/1A
Tier 1
Maintenance and Safety Enhancements
TSPLOST
City of South Fulton
Completed
The primary work is to resurface the final asphalt topping layer. The roads... more
The primary work is to resurface the final asphalt topping layer. The roads (Lost Cove Dr, Minkslide Dr, and War Trace Dr) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work includes all necessary preparation work (e.g., full depth patching and a single surface treatment). The roads will then have the final asphalt topping layer installed in a manner that will provide uniformity of the asphalt. Milling of the existing asphalt surface is not expected to be required for these roadways.
E R Snell
Not Applicable
Not Applicable
March, 2018
August, 2018
Not Applicable
Sales Tax
$95,530
$88,501
$7,029
Green
Green
Active
roussan.francois@fultoncountyga.gov
2017
2021-05-03 20:32:52
NULL
NULL
NULL
CSF- 102
RST 210
Parks at Cedar Grove 1/2 of Subdivision
Tier 1
Maintenance and Safety Enhancements
TSPLOST
City of South Fulton
Completed
The primary work is to resurface the final asphalt topping layer. The roads... more
The primary work is to resurface the final asphalt topping layer. The roads (Fairmont Way, Misty Walk, Parkland Bend, and Parks Trl) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work includes all necessary preparation work (e.g., full depth patching and a single surface treatment). The roads will then have the final asphalt topping layer installed in a manner that will provide uniformity of the asphalt. Milling of the existing asphalt surface is not expected to be required for these roadways.
E R Snell
Not Applicable
Not Applicable
March, 2018
August, 2018
Not Applicable
Sales Tax
$175,000
$192,027
$-17,027
Green
Green
Active
roussan.francois@fultoncountyga.gov
2017
2021-05-03 20:33:33
NULL
NULL
NULL
CSF- 103
RST 211
Preston's Vineyard, (LL 169, Dist 9F)
Tier 1
Maintenance and Safety Enhancements
TSPLOST
City of South Fulton
Completed
The primary work is to resurface the final asphalt topping layer. The road ... more
The primary work is to resurface the final asphalt topping layer. The road (Preston's Estates) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work includes all necessary preparation work (e.g., full depth patching and a single surface treatment). The roads will then have the final asphalt topping layer installed in a manner that will provide uniformity of the asphalt. Milling of the existing asphalt surface is not expected to be required for these roadways.
E R Snell
Not Applicable
Not Applicable
March, 2018
August, 2018
Not Applicable
Sales Tax
$19,830
$26,667
$-6,837
Red
Green
Active
roussan.francois@fultoncountyga.gov
2017
2021-05-03 20:34:01
NULL
NULL
NULL
CSF- 104
RST 212
Providence Glen < (LL 188 Dist 13)
Tier 1
Maintenance and Safety Enhancements
TSPLOST
City of South Fulton
Completed
The primary work is to resurface the final asphalt topping layer. The roads... more
The primary work is to resurface the final asphalt topping layer. The roads within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work includes all necessary preparation work (e.g., full depth patching and a single surface treatment). The roads will then have the final asphalt topping layer installed in a manner that will provide uniformity of the asphalt. Milling of the existing asphalt surface is not expected to be required for these roadways.
E R Snell
Not Applicable
Not Applicable
March, 2018
August, 2018
Not Applicable
Sales Tax
$42,960
$50,772
$-7,812
Red
Green
Active
roussan.francois@fultoncountyga.gov
2017
2021-05-03 20:34:18
NULL
NULL
NULL
CSF- 105
RST 213
Renaissance at South Park
Tier 1
Maintenance and Safety Enhancements
TSPLOST
City of South Fulton
Completed
The primary work is to resurface the final asphalt topping layer. The roads... more
The primary work is to resurface the final asphalt topping layer. The roads (Avalon Sq, Avalon Blvd, Bucknell Ter, Cabrini Pl, Radford Loop, Rutgers Cir, and Westwood Trl) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work includes all necessary preparation work (e.g., full depth patching and a single surface treatment). The roads will then have the final asphalt topping layer installed in a manner that will provide uniformity of the asphalt. Milling of the existing asphalt surface is not expected to be required for these roadways.
E R Snell
Not Applicable
Not Applicable
March, 2018
August, 2018
Not Applicable
Sales Tax
$141,831
$177,351
$-35,520
Red
Green
Active
roussan.francois@fultoncountyga.gov
2017
2021-05-03 20:34:30
NULL
NULL
NULL
CSF- 106
RST 214
Stoneridge 3
Tier 1
Maintenance and Safety Enhancements
TSPLOST
City of South Fulton
Completed
Garnet Ave, Sapphire Bend, Topaz Rd and Feldspar Way) within the subdivisio... more
Garnet Ave, Sapphire Bend, Topaz Rd and Feldspar Way) within the subdivision will have their final asphalt topping layer resurfaced. The work will include all the necessary preparation work which may include full depth of pavement patching and a surface treatment prior to final topping. Removal of the top asphalt layer (milling) is not expected to be required for these roadways. The roads will then be resurfaced with a uniform layer of asphalt in manner so as to provide uniformity of depth and a smooth transition to existing pavement. After resurfacing, all existing pavement markings such as line striping, crosswalks etc. will be reinstalled.
E R Snell
Not Applicable
Not Applicable
March, 2018
August, 2018
Not Applicable
Sales Tax
$168,840
$89,782
$79,058
Green
Green
Active
roussan.francois@fultoncountyga.gov
2017
2021-05-03 20:34:55
NULL
NULL
NULL
CSF- 107
RST 216
Thornwood Park , (LL 132/133 Dis 13)
Tier 1
Maintenance and Safety Enhancements
TSPLOST
City of South Fulton
Completed
The primary work is to resurface the final asphalt topping layer. The roads... more
The primary work is to resurface the final asphalt topping layer. The roads (Bigwood Trl, Splitpine Ct, and Old Madison Pl) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work includes all necessary preparation work (e.g., full depth patching and a single surface treatment). The roads will then have the final asphalt topping layer installed in a manner that will provide uniformity of the asphalt. Milling of the existing asphalt surface is not expected to be required for these roadways.
E R Snell
Not Applicable
Not Applicable
March, 2018
August, 2018
Not Applicable
Sales Tax
$101,920
$129,142
$-27,222
Green
Green
Active
roussan.francois@fultoncountyga.gov
2017
2021-05-03 20:13:48
NULL
NULL
NULL
CSF- 108
RST 215
St. Joseph Phase 1
Tier 1
Maintenance and Safety Enhancements
TSPLOST
City of South Fulton
Completed
The roads (Saint Peter Way, Saint Thomas Court, and Saint Judes Drive) with... more
The roads (Saint Peter Way, Saint Thomas Court, and Saint Judes Drive) within the subdivision is to resurface the final asphalt topping layer. The roads within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work includes all necessary preparation work (e.g., full depth patching and a single surface treatment). The roads will then have the final asphalt topping layer installed in a manner that will provide uniformity of the asphalt. The subject subdivison was topped through an earlier contract outside TSPLOST funding.
E R Snell
Not Applicable
Not Applicable
NULL
August, 2017
Not Applicable
Sales Tax
$101,920
$129,142
$-27,222
Green
Green
Active
roussan.francois@fultoncountyga.gov
2017
2021-05-03 16:49:07
NULL
NULL
NULL
CSF- 109
RST 217
Towncreek @ Cedar Grove PH2
Tier 1
Maintenance and Safety Enhancements
TSPLOST
City of South Fulton
Completed
The primary work is to resurface the final asphalt topping layer. The roads... more
The primary work is to resurface the final asphalt topping layer. The roads (Locherby Dr and Lochley Dr) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work includes all necessary preparation work (e.g., full depth patching and a single surface treatment). The roads will then have the final asphalt topping layer installed in a manner that will provide uniformity of the asphalt. Milling of the existing asphalt surface is not expected to be required for these roadways.
E R Snell
Not Applicable
Not Applicable
March, 2018
August, 2018
Not Applicable
Sales Tax
$45,998
$46,579
$-581
Green
Green
Active
roussan.francois@fultoncountyga.gov
2017
2021-05-03 20:14:04
NULL
NULL
NULL
CSF- 11
RS 367
Oakley Township
Tier 1
Maintenance and Safety Enhancements
TSPLOST
City of South Fulton
Completed
The roads (Oakley Road and Red Hawk Run) within the subdivision to be resur... more
The roads (Oakley Road and Red Hawk Run) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled.
NULL
Not Applicable
Not Applicable
NULL
November, 2020
NULL
Sales Tax
$459,740
$336,295
$123,445
Green
Green
Active
roussan.francois@fultoncountyga.gov
2019
2021-05-03 19:56:29
NULL
NULL
NULL
CSF- 110
RS 300
Ashley Downs
Tier 1
Maintenance and Safety Enhancements
TSPLOST
City of South Fulton
Completed
The roads (Ashington Court, Ashley Downs Lane, Circle Court, Fox Hall Lane ... more
The roads (Ashington Court, Ashley Downs Lane, Circle Court, Fox Hall Lane South, Green Bower Lane, Hallie Mill Road, Marcliff Court, Marley Drive, Thornbury Way I) to be resurfaced within the subdivision may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled.
CWM
Not Applicable
Not Applicable
NULL
May, 2018
NULL
Sales Tax
$431,006
$377,254
$53,752
Green
Green
Inactive
roussan.francois@fultoncountyga.gov
2018
2021-02-06 23:39:18
NULL
NULL
NULL
CSF- 111
RS 301
Beacon Hills
Tier 1
Maintenance and Safety Enhancements
TSPLOST
City of South Fulton
Completed
The roads (Berry Hill Court, Diann Court, Dianne Court, Dianne Drive, Green... more
The roads (Berry Hill Court, Diann Court, Dianne Court, Dianne Drive, Green Trail, and Greentree Court) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled.
CW Matthews
Not Applicable
Not Applicable
NULL
November, 2021
NULL
Sales Tax
$124,513
$89,983
$34,530
Green
Green
Active
roussan.francois@fultoncountyga.gov
2021
2023-03-02 14:13:31
NULL
NULL
NULL
CSF- 112
RS 302
Beaver Creek
Tier 1
Maintenance and Safety Enhancements
TSPLOST
City of South Fulton
Completed
The roads (Beaver Creek Trail and Kimberly Mill Lane) within the subdivisio... more
The roads (Beaver Creek Trail and Kimberly Mill Lane) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled.
CWM
Not Applicable
Not Applicable
NULL
June, 2018
NULL
Sales Tax
$76,623
$60,231
$16,392
Green
Green
Inactive
roussan.francois@fultoncountyga.gov
2018
2021-02-06 23:39:45
NULL
NULL
NULL
CSF- 113
RS 303
Benchmark
Tier 1
Maintenance and Safety Enhancements
TSPLOST
City of South Fulton
Completed
The roads (Azimuth Court, Bearing Way, Benchmark Drive, Transit Circle, and... more
The roads (Azimuth Court, Bearing Way, Benchmark Drive, Transit Circle, and Traverse Court) within he subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled.
CWM
Not Applicable
Not Applicable
NULL
November, 2018
NULL
Sales Tax
$130,260
$166,456
$-36,196
Red
Green
Inactive
roussan.francois@fultoncountyga.gov
2018
2021-02-06 23:40:44
NULL
NULL
NULL
CSF- 114
RS 304
Bentwood Trace
Tier 1
Maintenance and Safety Enhancements
TSPLOST
City of South Fulton
Completed
The roads (Brentwood Court, Fruitwood Trace, and Teakwood Lane) within the ... more
The roads (Brentwood Court, Fruitwood Trace, and Teakwood Lane) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled.
CWM
Not Applicable
Not Applicable
NULL
May, 2018
NULL
Sales Tax
$76,623
$98,773
$-22,150
Red
Green
Inactive
roussan.francois@fultoncountyga.gov
2018
2021-02-06 23:41:04
NULL
NULL
NULL
CSF- 115
RS 305
Bethsaida West
Tier 1
Maintenance and Safety Enhancements
TSPLOST
City of South Fulton
Completed
The roads (Dawn Drive, Lori Lane, Renee Dawn Court, and Sandy Circle) withi... more
The roads (Dawn Drive, Lori Lane, Renee Dawn Court, and Sandy Circle) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled.
CWM
Not Applicable
Not Applicable
NULL
May, 2018
NULL
Sales Tax
$394,610
$82,362
$312,248
Green
Green
Inactive
roussan.francois@fultoncountyga.gov
2018
2021-02-06 23:41:39
NULL
NULL
NULL
CSF- 116
RS 306
Big Creek
Tier 1
Maintenance and Safety Enhancements
TSPLOST
City of South Fulton
Completed
The roads (Ann Arbor Drive and Arbor Shores Drive) within the subdivision t... more
The roads (Ann Arbor Drive and Arbor Shores Drive) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled.