Here you can select the number of cards to be placed in a row for each of supported screen resolutions. Your current resolution is highlighted in this way.
traffic control, single pass chip seal, microsurfacing, thermoplastic solid... more
traffic control, single pass chip seal, microsurfacing, thermoplastic solid traffic striping 5” white, thermoplastic solid traffic striping 5” yellow, thermoplastic traffic striping 24” white, thermoplastic skip traffic striping 5” white, and raised pavement markers single indicated on centerline for roadways identified by the engineers and public works director
traffic control, single pass chip seal, microsurfacing, thermoplastic solid... more
traffic control, single pass chip seal, microsurfacing, thermoplastic solid traffic striping 5” white, thermoplastic solid traffic striping 5” yellow, thermoplastic traffic striping 24” white, thermoplastic skip traffic striping 5” white, and raised pavement markers single indicated on centerline for roadways identified by the engineers and public works director
deep patching on Rico Road (SFP to Hutcheson Ferry Road) utilizing 19mm asp... more
deep patching on Rico Road (SFP to Hutcheson Ferry Road) utilizing 19mm asphalt, a 4” wide milling head at a depth of 4”, as well as 4” paint to repair existing striping damaged during construction
deep patching on Rico Road (SFP to Hutcheson Ferry Road) utilizing 19mm asp... more
deep patching on Rico Road (SFP to Hutcheson Ferry Road) utilizing 19mm asphalt, a 4” wide milling head at a depth of 4”, as well as 4” paint to repair existing striping damaged during construction
The project consists of Hot Mix Asphalt (HMA) patching, HMA leveling, HMA t... more
The project consists of Hot Mix Asphalt (HMA) patching, HMA leveling, HMA topping, striping, shoulder building, and grassing on 1.4 miles of Rico Road beginning at South Fulton Parkway and ending at Campbellton Redwine Road.
ER Snell
NULL
August, 2017
September, 2017
December, 2017
December, 2017
Sales Tax
$304,770
$301,469
$3,301
Green
Green
Active
robbie.rokovitz@chatthillsga.us
2017
2021-12-13 18:29:50
NULL
NULL
NULL
CH- 3
CH-102
Quick Response Projects
Tier 1
Quick Response
TSPLOST
Chattahoochee Hills
Completed
Location #1 û Wilkerson Mill Road: This portion of the project consists of... more
Location #1 û Wilkerson Mill Road: This portion of the project consists of Hot Mix Asphalt (HMA) patching, HMA leveling, HMA topping, striping, raised pavement markers, shoulder building, and grassing on approx. 2.5 miles of Wilkerson Mill Road beginning at Cochran Mill Road and ending at Cascade Palmetto Highway.
Location #2 û Atlanta Newnan Road: This portion of the project consists of Full Depth Reclamation of the existing road bed, HMA binder and topping course, shoulder building, grassing, striping and raised pavement markers on 1.5 miles of roadway beginning at Hutcheson Ferry Road and ending at the bridge at the Coweta County line.
Atlanta Paving
DWS
September, 2018
October, 2018
December, 2018
February, 2019
$470,233 TSPLOST & $663,154 Capital Fund
$1,176,646
$1,133,387
$43,259
Green
Green
Active
robbie.rokovitz@chatthillsga.us
2018-2019
2021-12-13 18:30:01
NULL
NULL
NULL
CH- 4
CH-201
Maintenance and Safety Enhancements
Tier 2
Maintenance and Safety Enhancements
TSPLOST
Chattahoochee Hills
Completed
The project consists of ôdeep patchingö (mill & inlay) repair of various ro... more
The project consists of ôdeep patchingö (mill & inlay) repair of various roads as outlined in the bid packet. All milling quantities are based on the use of a 4Æ wide milling head. All patching asphalt quantities are based on an average depth of 3.5ö of asphalt binder. Precise locations have not been determined but will be marked in conjunction with Contractor prior to commencement of actual work. The tonnage shown for each road is an estimate and may be adjusted as required to match field conditions.
Blount Construction
DW Smith
June, 2019
September, 2019
October, 2019
October, 2019
Sales Tax ($365,000 TSPLOST/$52,8836 Capital Fund)
$418,322
$417,836
$486
Green
Green
Active
robbie.rokovitz@chatthillsga.us
2018-2019
2021-12-13 18:30:13
NULL
NULL
NULL
CH- 5
CH-202
Maintenance and Safety Enhancements
Tier 1
Maintenance and Safety Enhancements
TSPLOST
Chattahoochee Hills
Construction
This project consists of deep patching South Fulton Parkway at the bridge/C... more
This project consists of deep patching South Fulton Parkway at the bridge/County line, Two locations on Campbellton-Redwine (approx. 1,000 lf), Cochran Mill @ Woodruff, Rivertown @ Campbellton-Redwine, Complete work begun on Rivertown, Hutcheson Ferry (approx. 1,000 lf). Crack sealing South Fulton Parkway (areas not addressed by GDOT), Hutcheson Ferry (from The Inn to Cochran Mill), Campbellton-Redwine, and striping South Fulton Parkway, Hutcheson Ferry, Rico Road (southern portion), Cochran Mill Road, Rivertown Road and Campbellton-Redwine