| Project Description |
The roads (Beacon Drive, Carriage Court I, Carriage Lane, Cedar Wood Drive, Cedarwood Court, Cheryl Lynne Lane, Green Trail Drive, Guilford Lane, Hillandale Drive, La Jean Drive, Middleburg Drive, Ocean Valley Drive, Old Carriage Drive, Old Farm Road, Pineside Drive, and Spruce Point Road(Beacon Drive, Carriage Court I, Carriage Lane, Cedar Wood Drive, Cedarwood Court, Cheryl Lynne Lane, Green Trail Drive, Guilford Lane, Hillandale Drive, La Jean Drive, Middleburg Drive, Ocean Valley Drive, Old Carriage Drive, Old Farm Road, Pineside Drive, and Spruce Point Road) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled. |