TSPLOSTProjects

Project ID Local ID Project Name Title Tier Project Type Initiatve Type City Current Stage Project Description Construction Firm Selected Design Firm Selected Estimated Design Completion Date Estimated Start Date For Project Estimated Construction Completion Date Estimated Substantial Completion Date Link To External Website Primary Funding Source TSPLOST Budget ($) TSPLOST Dollars Spent ($) TSPLOST Dollars Committed (not spent) ($) Cost Status Schedule Status Status Editor Project Year Last Update State Address Creation Date
FA- 3 17-005 Roadway Improvements on Various City Roads Project Tier 1 Maintenance and Safety Enhancements TSPLOST Fairburn Completed City-Wide Resurfacing. The project includes milling, temporary traffic control, asphalt paving, thermoplastic striping, manhole adjustments and associated tasks. Our strategy was to use 2017-2018 TSPLOST funds to focus our resurfacing efforts on the heart of the City (downtown) and extend future efforts to its extremities. In doing so, the implementation of the Downtown LCI Project, would have a more meaningful impact on the revitalization of FairburnÆs Historic Downtown. E.R. Snell Contractor, Inc. In-House June, 2017 November, 2017 December, 2018 October, 2018 Sales Tax $1,200,000 $968,367 $231,633 Green Green Active lthompson@fairburn.com 2017 NULL NULL NULL NULL
FA- 30 25-011 Oakley Industrial Boulevard Left Turn Lane Project Tier 1 Roadway Projects TSPLOST2 Fairburn Bidding The widening of 0.299 mi of a left turn lane for Oakley Industrial Boulevard at entrance of the SC Johnson's distribution enter. PIEDMONT PAVING Atlas Technical Consultants July, 2025 August, 2025 January, 2026 December, 2025 Fairburn Sales Tax $1,315,248 $0 $1,315,248 Green Green Active anthony.belcher@fairburn.com 2025 2025-08-01 14:35:20 Georgia Oakley Industrial Boulevard 2022-03-31
FA- 31 24-009 McLarin Road/E. Broad Street (Bohannon Road to Gullat Road) Full-Depth Reclamation Tier 1 Roadway Projects TSPLOST2 Fairburn Completed Full-Depth Reclamation of McLarin Road along with asphalt paving, the installation of thermoplastic striping and raised pavement markers (RPMs), and manhole and water valve adjustments. From Bohannon Rd. to Gullatt Road. BLOUNT CONSTRUCTION SOUTHEASTERN ENGINEERING INC. NULL NULL NULL NULL Sales Tax $100,000 $100,000 $0 Green NULL Active lthompson@fairburn.com 2024 2025-06-24 11:13:11 Georgia McLarin Road 2022-03-31
FA- 32 24-009 Gullatt Road Full-Depth Reclamation Tier 1 Roadway Projects TSPLOST2 Fairburn Completed "Full-Depth Reclamation of Gullatt Road from McLarin Road East to just west of Cleckler Road. The project also included asphalt paving, the installation of thermoplastic striping and raised pavement markers (RPMs), and manhole and water valve adjustments. The approved T-SPLOST Project List allocates $$674,612.00 of Roadway Projects funding to the Full-Depth Reclamation of Gullatt Road. Total Project cost 2,658,412.08 BLOUNT CONSTRUCTION SOUTHEASTERN ENGINEERING INC. April, 2024 July, 2024 November, 2024 October, 2024 Sales Tax $337,306 $674,612 $-337,306 Green Green Active anthony.belcher@fairburn.com 2024 2025-08-04 16:36:16 Georgia Gullatt Road 2022-03-31
FA- 33 NULL Quiet Zone R/R Crossings Tier 2 Operation and Safety Improvements TSPLOST2 Fairburn Planning NULL NULL NULL NULL NULL NULL NULL Sales Tax NULL NULL $0 NULL NULL Active NULL NULL NULL Georgia City of Fairburn 2022-03-31
FA- 34 23-002 Pedestrian and Bike Improvements (Phase 2) Tier 2 Pedestrian and Bike Improvements TSPLOST2 Fairburn Completed SOUTHEAST BROAD STREET PEDESTRIAN IMPROVEMENTS PROJECT #23-002. The work includes the removal of existing curb & gutter, sidewalk and driveway aprons as required, installation of new curb & gutter, installation of new sidewalk, replacement of existing sidewalk as required, installation of new driveway aprons, and the installation of new ADA handicap ramps. The contract will also include preparation of sub-grade, saw-cutting and demolition of existing asphalt and concrete, as well as clean up and backfilling. The Corbet Group Moreland Altobelli November, 2022 January, 2023 May, 2023 April, 2023 Sales Tax $678,277 $678,277 $0 Green Green Inactive anthony.belcher@fairburn.com 2023 2025-07-02 16:33:59 Georgia City of Fairburn 2022-03-31
FA- 35 NULL City Wide Tier 3 Congestion Relief TSPLOST2 Fairburn Planning NULL NULL NULL NULL NULL NULL NULL Sales Tax NULL NULL $0 NULL NULL Active NULL NULL NULL Georgia City of Fairburn 2022-03-31
FA- 36 NULL City Wide Tier 3 Operation and Safety Improvements TSPLOST2 Fairburn Planning NULL NULL NULL NULL NULL NULL NULL Sales Tax NULL NULL $0 NULL NULL Active NULL NULL NULL Georgia City of Fairburn 2022-03-31
FA- 37 NULL Dodd Street Roundabout Tier 3 Roadway Project TSPLOST2 Fairburn Planning NULL NULL NULL NULL NULL NULL NULL Sales Tax NULL NULL $0 NULL NULL Active NULL NULL NULL Georgia Dodd Street 2022-03-31
FA- 38 NULL Pedestrian and Bike Improvements (Phase 3) Tier 3 Pedestrian and Bike Improvements TSPLOST2 Fairburn Planning NULL NULL NULL NULL NULL NULL NULL Sales Tax NULL NULL $0 NULL NULL Active NULL NULL NULL Georgia City of Fairburn 2022-03-31
FA- 39 NULL Oakley Industrial Boulevard Extension (Design Only) Tier 1 Roadway Projects TSPLOST2 Fairburn Concept The extension of Oakley Industrial Boulevard, from Creekwood Road to Gullatt Road. NULL NULL June, 2025 August, 2025 November, 2025 October, 2025 Sales Tax $0 $0 $0 Green Green Active anthony.belcher@fairburn.com NULL 2025-08-01 14:57:15 Georgia Oakley Industrial Boulevard 2022-03-31
FA- 4 17-004 Pedestrian Improvements on Various City Roads Project Tier 1 Pedestrian and Bike Improvements TSPLOST Fairburn Completed The project includes grading complete, temporary traffic control, installation of sidewalk, driveway reconstruction, installation of handicap ramps, curb & gutter installation, header curb installation and associated tasks. The is the first TSPLOST Pedestrian and Bike Improvements Project. The objective was to install new sidewalk and handicap ramps at various locations throughout the City that were currently not served with pedestrian facilities. The project also proposed connection to existing pedestrian facilities in the area. The project's purpose was to improve safety by providing a safe means for pedestrian to walk downtown to access various services and amenities. The project also provided pedestrians a safe means by which access to the newly renovated Clarence Duncan Memorial Park. TOPLE Construction & Engineering In-House July, 2017 November, 2017 November, 2018 November, 2018 Sales Tax $439,288 $193,565 $245,723 Green Green Active lthompson@fairburn.com 2017 NULL NULL NULL NULL
FA- 40 25-003 MULLIS STREET PEDESTRIAN IMPROVEMENTS PROJECT Tier 1 Pedestrian and Bike Improvements TSPLOST2 Fairburn Construction The installation of a 5-foot concrete sidewalk with a 2-foot beauty strip along Mullis Street, from West Campbellton Street to Dodd Street, and from Dodd Street to Strickland Street. The project also entails the installation of pedestrian improvements on a section of Dodd Street, from Mullis Street to W. Broad Street. The work includes the removal of existing curb & gutter and header curb, and the installation of new header curb and sidewalk. This contract will also include preparation of sub-grade, saw-cutting and demolition of existing asphalt as well as clean up and backfilling. The scope of Add Alternate #1 consists of the installation of pedestrian lighting CONSTRUCTION 57 INC. POND ENGINEERING March, 2025 May, 2025 July, 2025 June, 2025 Sales Tax $570,201 $570,201 $0 Green Green Active anthony.belcher@fairburn.com 2025 2025-05-06 10:21:42 GA NULL 2025-05-06
FA- 41 24-009 Cleckler Rd Full-Depth Reclamation Project Tier 1 Maintenance and Safety Enhancements TSPLOST2 Fairburn Bidding Full-Depth Reclamation of Cleckler Road along with asphalt paving, the installation of thermoplastic striping and raised pavement markers (RPMs), and manhole and water valve adjustments. BLOUNT CONSTRUCTION SOUTHEASTERN ENGINEERING INC. May, 2024 July, 2024 November, 2024 October, 2024 Sales Tax $209,041 $0 $209,041 Green Green Active anthony.belcher@fairburn.com 2024 2025-08-04 16:18:35 GA Cleckler Rd. 2025-05-06
FA- 42 25-011 Oakley Industrial Boulevard Left Turn Lane Project Tier 1 Roadway Projects TSPLOST2 Fairburn Bidding This project consists of a total of 0.299 miles of Widening on Oakley Industrial Boulevard at the entrance of SC Johnson's distribution center. PIEDMONT PAVING Atlas Technical Consultants May, 2025 July, 2025 November, 2025 October, 2025 Fairburn Sales Tax $330,000 $0 $330,000 Gray Gray Active anthony.belcher@fairburn.com 2025 2025-08-01 14:37:15 Georgia 314 NW Broad St 2025-06-16
FA- 43 NULL BROOKS DR. EXTENSION Tier 1 Roadway Projects TSPLOST2 Fairburn Design Extension of 0.2 mi of Brooks Dr. NULL NULL January, 2024 NULL NULL NULL Sales Tax $100,000 $0 $100,000 Green NULL Active anthony.belcher@fairburn.com 2025 2025-08-03 19:06:57 NULL NULL 2025-07-31
FA- 5 18-002 Oakley Industrial Boulevard Full-Depth Reclamation (FDR) Project Tier 1 Roadway Projects TSPLOST Fairburn Completed Full-Depth Reclamation of Oakley Industrial Boulevard, from Bohannon Road to just west of SR 74/ Senoia Road. The project also included asphalt paving, the installation of thermoplastic striping and raised pavement markers (RPMs), and manhole and water valve adjustments. The approved T-SPLOST Project List allocates $897,309 of Roadway Projects funding to the Full-Depth Reclamation of Oakley Industrial Boulevard (OIB). Since we only did approximately half of the entire project, only $448,654.50 of TSPLOST Funds were allocated to the project.. C.W.Matthews Contracting Co., Inc. Moreland Altobelli Associates, LLC May, 2018 July, 2018 February, 2019 January, 2019 Sales Tax $629,879 $411,049 $218,830 Green Green Active lthompson@fairburn.com 2018 2021-09-08 19:22:03 NULL NULL NULL
FA- 6 18-002 McLarin Road Full-Depth Reclamation Project Tier 1 Maintenance and Safety Enhancements TSPLOST Fairburn Completed Full-Depth Reclamation of McLarin Road along with asphalt paving, the installation of thermoplastic striping and raised pavement markers (RPMs), and manhole and water valve adjustments. C.W.Matthews Contracting Co., Inc. Moreland Altobelli Associates, LLC May, 2018 July, 2018 February, 2019 January, 2019 Sales Tax $524,177 $330,790 $193,387 Green Green Active lthompson@fairburn.com 2018 NULL NULL NULL NULL
FA- 7 18-002 Terminus Drive Full-Depth Reclamation Project Tier 1 Maintenance and Safety Enhancements TSPLOST Fairburn Completed Full-Depth Reclamation of Terminus Drive along with asphalt paving, the installation of thermoplastic striping and raised pavement markers (RPMs), and the adjustment of manholes and water valves. C.W.Matthews Contracting Co., Inc. Moreland Altobelli Associates, LLC May, 2018 July, 2018 February, 2019 January, 2019 Sales Tax $622,226 $341,612 $280,614 Green Green Active lthompson@fairburn.com 2018 NULL NULL NULL NULL
FA- 8 18-006 Roadway Improvements on Various City Roads Project Tier 1 Maintenance and Safety Enhancements TSPLOST Fairburn Completed City-Wide Resurfacing. The project includes milling, temporary traffic control, asphalt paving, thermoplastic striping, manhole adjustments and associated tasks. City-Wide Resurfacing. This yearÆs project we again focused our resurfacing efforts on the heart of the City (downtown) in preparation for the implementation of Downtown LCI Project and extend future efforts to its extremities. In addition to areas in close proximity to downtown, this yearÆs project list also contains other priorities and cooperative efforts identified by Staff. The Invitation for Bid (IFB#18-006, Roadway Improvements on Various City Roads) was advertised on May 16th. The bid opening was bid opening date was June 15th, 2018 at 3:00 pm at which time the four (4) bids were opened and read aloud. After completion of the bid evaluation, it was determined that Baldwin Paving Company, Inc. was the lowest responsive and responsible bidder with a bid price of $2,289,810.12. Baving Paving, Inc. In-House July, 2018 October, 2018 October, 2019 April, 2019 Sales Tax $2,165,861 $1,717,810 $448,051 Green Yellow Active lthompson@fairburn.com 2018 2020-12-17 13:26:23 NULL NULL NULL
SUM = 1,336,287,302 SUM = 142,586,760,300 SUM = -141,250,472,998