| Project ID | Local ID | Project Name Title | Tier | Project Type | Initiatve Type | City | Current Stage | Project Description | Construction Firm Selected | Design Firm Selected | Estimated Design Completion Date | Estimated Start Date For Project | Estimated Construction Completion Date | Estimated Substantial Completion Date | Link To External Website | Primary Funding Source | TSPLOST Budget ($) | TSPLOST Dollars Spent ($) | TSPLOST Dollars Committed (not spent) ($) | Cost Status | Schedule Status | Status | Editor | Project Year | Last Update | State | Address | Creation Date |
| CSF- 135 | RS 325 | Edgewater | Tier 1 | Maintenance and Safety Enhancements | TSPLOST | City of South Fulton | Completed | The roads (Canyon Lake Court and Canyon Lake Drive) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled. | CW Matthews | Not Applicable | Not Applicable | NULL | November, 2021 | NULL | Sales Tax | $93,864 | $116,466 | $-22,602 | Green | Green | Active | roussan.francois@fultoncountyga.gov | 2021 | 2023-03-02 14:14:38 | NULL | NULL | NULL | |
| CSF- 136 | RS 326 | Emerald Pointe | Tier 1 | Maintenance and Safety Enhancements | TSPLOST | City of South Fulton | Completed | The roads (Emerald Green Court, Emerald Pointe Circle, Gemstone Court, Gemstone Place, Crystal Green Court, and Hemperly Road) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled. | CWM | Not Applicable | Not Applicable | NULL | July, 2018 | NULL | Sales Tax | $314,156 | $230,653 | $83,503 | Green | Green | Inactive | roussan.francois@fultoncountyga.gov | 2018 | 2021-02-06 23:43:30 | NULL | NULL | NULL | |
| CSF- 137 | RS 327 | Enon Forest | Tier 1 | Maintenance and Safety Enhancements | TSPLOST | City of South Fulton | Completed | The roads (Datona Drive, Happy Valley Circle, and Orange Road) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled. | NULL | Not Applicable | Not Applicable | NULL | May, 2021 | NULL | Sales Tax | $362,045 | $265,342 | $96,703 | Green | Green | Active | roussan.francois@fultoncountyga.gov | 2020 | 2021-10-12 18:18:19 | NULL | NULL | NULL | |
| CSF- 138 | RS 328 | Estes Drive | Tier 1 | Maintenance and Safety Enhancements | TSPLOST | City of South Fulton | Completed | The road (Estes Drive) with the subdivisionto be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled. | CWM | Not Applicable | Not Applicable | NULL | November, 2018 | NULL | Sales Tax | $57,468 | $29,728 | $27,740 | Red | Green | Inactive | roussan.francois@fultoncountyga.gov | 2018 | 2021-02-06 23:44:07 | NULL | NULL | NULL | |
| CSF- 139 | RS 329 | Falcon Forest | Tier 1 | Maintenance and Safety Enhancements | TSPLOST | City of South Fulton | Completed | The roads (Kelden Circle and Kelden Court) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled. | CW Matthews | Not Applicable | Not Applicable | NULL | November, 2020 | NULL | Sales Tax | $113,019 | $93,426 | $19,593 | Green | Green | Active | roussan.francois@fultoncountyga.gov | 2020 | 2023-03-02 13:45:31 | NULL | NULL | NULL | |
| CSF- 14 | RS 371 | Parkland Woods | Tier 1 | Maintenance and Safety Enhancements | TSPLOST | City of South Fulton | Completed | The roads (Marsh Drive, Marshwood Trace II, and Westcliffe Court) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled. | NULL | Not Applicable | Not Applicable | NULL | August, 2021 | NULL | Sales Tax | $70,877 | $427,564 | $-356,687 | Green | Green | Active | roussan.francois@fultoncountyga.gov | 2020 | 2023-03-02 14:08:04 | NULL | NULL | NULL | |
| CSF- 140 | RS 330 | Feldwood Pines | Tier 1 | Maintenance and Safety Enhancements | TSPLOST | City of South Fulton | Completed | The roads (Bearing Way II and Morning Creek Drive) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled. | CW Matthews | Not Applicable | Not Applicable | NULL | May, 2021 | NULL | Sales Tax | $65,130 | $65,130 | $0 | Green | Green | Active | roussan.francois@fultoncountyga.gov | 2020 | 2023-03-02 13:46:09 | NULL | NULL | NULL | |
| CSF- 141 | RS 331 | Flat Shoals Estates | Tier 1 | Maintenance and Safety Enhancements | TSPLOST | City of South Fulton | Completed | The roads (Beethoven Circle, Beethoven Court, Liszt Lane, Mozart Court, and Mozart Drive) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled. | CW Matthews | Not Applicable | Not Applicable | NULL | July, 2020 | NULL | Sales Tax | $279,675 | $210,978 | $68,697 | Green | Green | Active | roussan.francois@fultoncountyga.gov | 2019 | 2021-05-03 19:32:04 | NULL | NULL | NULL | |
| CSF- 142 | RS 332 | Forest Downs | Tier 1 | Maintenance and Safety Enhancements | TSPLOST | City of South Fulton | Completed | The roads (Forest Crossing Way, Forest Downs Circle, Forest Downs Lane, Wolf Down Court, and Wolf Downs Way) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled. | CWM | Not Applicable | Not Applicable | NULL | November, 2019 | NULL | Sales Tax | $319,903 | $339,214 | $-19,311 | Yellow | Green | Active | roussan.francois@fultoncountyga.gov | 2018 | 2021-05-03 19:33:13 | NULL | NULL | NULL | |
| CSF- 143 | RS 333 | Fox Fire S/D | Tier 1 | Maintenance and Safety Enhancements | TSPLOST | City of South Fulton | Completed | The roads (Blue Fox Circle, Sable Fox Rd, Grey Fox Way, and Polar Fox Court) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled. | CW Matthews | Not Applicable | Not Applicable | NULL | June, 2021 | NULL | Sales Tax | $377,370 | $205,805 | $171,565 | Green | Green | Active | roussan.francois@fultoncountyga.gov | 2020 | 2023-03-02 13:46:46 | NULL | NULL | NULL | |
| CSF- 144 | RS 334 | Gladstone Hills | Tier 1 | Maintenance and Safety Enhancements | TSPLOST | City of South Fulton | Completed | The roads (Gage Court, Galena Court, Garvey Drive, Gladden Road, Gledstone Way, and Gledstone Way) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled. | NULL | Not Applicable | Not Applicable | NULL | August, 2021 | NULL | Sales Tax | $172,403 | $370,153 | $-197,750 | Green | Green | Active | roussan.francois@fultoncountyga.gov | 2021 | 2021-10-12 18:45:36 | NULL | NULL | NULL | |
| CSF- 145 | RS 335 | Granada | Tier 1 | Maintenance and Safety Enhancements | TSPLOST | City of South Fulton | Completed | The roads (Casa Verde Drive and San Costa Court) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled. | CW Matthews | Not Applicable | Not Applicable | NULL | November, 2020 | NULL | Sales Tax | $76,623 | $62,018 | $14,605 | Green | Green | Active | roussan.francois@fultoncountyga.gov | 2020 | 2023-03-02 13:47:24 | NULL | NULL | NULL | |
| CSF- 146 | RS 336 | Guilford Pointe | Tier 1 | Maintenance and Safety Enhancements | TSPLOST | City of South Fulton | Completed | The roads (Birdie Lane II, Brightwood Lane, and Ninas Trace) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled. | CW Matthews | Not Applicable | Not Applicable | NULL | November, 2021 | NULL | Sales Tax | $65,130 | $107,303 | $-42,173 | Green | Green | Active | roussan.francois@fultoncountyga.gov | 2020 | 2023-03-02 14:15:32 | NULL | NULL | NULL | |
| CSF- 147 | RS 337 | Hallie Hills | Tier 1 | Maintenance and Safety Enhancements | TSPLOST | City of South Fulton | Completed | The roads (Ansted Lane, Butterfield Court, Butterfield Lane, Carisbrook Court, Earlhurst Road, Fox Hall Court, Greenbower Court, Greenbower Lane, Hallie Lane, Hickory Fox Court, Mapledale Lane, Marlborough Circle, Millsboro Lane, Neola Lane, Pennfair Lane, Peppermill Court, Peppermill Lane, Ravencliff Lane, Ravencliff Road, Rimel Lane, Rocky Springs Court, Shoppers Lane, Spicewood Court, Spicewood Court North, Spicewood Court South, Spicewood Lane, Stockdale Court, Turtle Bend Lane, and Winterside Lane) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled. | CW Matthews | Not Applicable | Not Applicable | NULL | November, 2021 | NULL | Sales Tax | $733,669 | $1,649,962 | $-916,293 | Green | Green | Active | roussan.francois@fultoncountyga.gov | 2021 | 2023-03-02 14:16:04 | NULL | NULL | NULL | |
| CSF- 148 | RS 338 | Hania Flowers Estates | Tier 1 | Maintenance and Safety Enhancements | TSPLOST | City of South Fulton | Completed | The roads (Darry Court, Hania Drive, Hassana Lane, Hussamy Lane, and Imad Court) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled. | CWM | Not Applicable | Not Applicable | NULL | April, 2018 | NULL | Sales Tax | $281,591 | $212,601 | $68,990 | Green | Green | Active | roussan.francois@fultoncountyga.gov | 2018 | 2021-05-03 19:36:31 | NULL | NULL | NULL | |
| CSF- 149 | RS 339 | Happy Hollow | Tier 1 | Maintenance and Safety Enhancements | TSPLOST | City of South Fulton | Completed | The roads (Happy Hollow Court and Pullen Lane) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled. | CW Matthews | Not Applicable | Not Applicable | NULL | November, 2021 | NULL | Sales Tax | $57,468 | $66,586 | $-9,118 | Green | Green | Active | roussan.francois@fultoncountyga.gov | 2021 | 2023-03-02 14:18:32 | NULL | NULL | NULL | |
| CSF- 15 | RS 372 | Picardy Circle South | Tier 1 | Maintenance and Safety Enhancements | TSPLOST | City of South Fulton | Completed | The roads (Lantern Lane II, Picardy Circle North, and Picardy Circle South) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled. | CWM | Not Applicable | Not Applicable | NULL | July, 2019 | NULL | Sales Tax | $61,299 | $47,859 | $13,440 | Green | Green | Active | roussan.francois@fultoncountyga.gov | 2018 | 2021-05-03 19:59:53 | NULL | NULL | NULL | |
| CSF- 150 | RS 340 | Hidden Valley | Tier 1 | Maintenance and Safety Enhancements | TSPLOST | City of South Fulton | Completed | The roads (Hidden Court and Hidden Valley Drive) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled. | CW Matthews | Not Applicable | Not Applicable | NULL | November, 2021 | NULL | Sales Tax | $86,201 | $136,845 | $-50,644 | Green | Green | Active | roussan.francois@fultoncountyga.gov | 2020 | 2023-03-02 13:49:15 | NULL | NULL | NULL | |
| CSF- 151 | RS 341 | Highpoint | Tier 1 | Maintenance and Safety Enhancements | TSPLOST | City of South Fulton | Completed | The road (North Close) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled. | CW Matthews | Not Applicable | Not Applicable | NULL | November, 2021 | NULL | Sales Tax | $9,578 | $221,507 | $-211,929 | Green | Green | Active | roussan.francois@fultoncountyga.gov | 2021 | 2023-03-02 14:19:10 | NULL | NULL | NULL | |
| CSF- 152 | RS 342 | Hillandale | Tier 1 | Maintenance and Safety Enhancements | TSPLOST | City of South Fulton | Completed | The roads (Beacon Drive, Carriage Court I, Carriage Lane, Cedar Wood Drive, Cedarwood Court, Cheryl Lynne Lane, Green Trail Drive, Guilford Lane, Hillandale Drive, La Jean Drive, Middleburg Drive, Ocean Valley Drive, Old Carriage Drive, Old Farm Road, Pineside Drive, and Spruce Point Road(Beacon Drive, Carriage Court I, Carriage Lane, Cedar Wood Drive, Cedarwood Court, Cheryl Lynne Lane, Green Trail Drive, Guilford Lane, Hillandale Drive, La Jean Drive, Middleburg Drive, Ocean Valley Drive, Old Carriage Drive, Old Farm Road, Pineside Drive, and Spruce Point Road) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled. | CWM | Not Applicable | Not Applicable | NULL | July, 2018 | NULL | Sales Tax | $865,844 | $424,896 | $440,948 | Green | Green | Active | roussan.francois@fultoncountyga.gov | 2018 | 2021-05-03 19:38:40 | NULL | NULL | NULL | |
| SUM = 193,906,703 | SUM = 142,040,425,058 | SUM = -141,846,518,355 |