Project ID Local ID Project Name Title Tier Project Type Initiatve Type City Current Stage Project Description Construction Firm Selected Design Firm Selected Estimated Design Completion Date Estimated Start Date For Project Estimated Construction Completion Date Estimated Substantial Completion Date Link To External Website Primary Funding Source TSPLOST Budget ($) TSPLOST Dollars Spent ($) TSPLOST Dollars Committed (not spent) ($) Cost Status Schedule Status Status Editor Project Year Last Update State Address Creation Date
EP- 8 EP-006 Dodson Drive Resurfacing Tier 1 Maintenance and Safety Enhancements TSPLOST East Point Completed The project is in design for roadway resurfacing. The projects listed below were grouped together for solicitation: EP-152 $190,000; EP-133 $419,667; EP-132 $26,000; EP-136 $189,000; EP-153 $174,500; EP-154 $52,800; EP-155 $248,000 EP-156 $311,500 EP-157 $84,500 EP-135 $32,000 EP-137 $120,000 EP-138 $405,000 EP-144 $65,000 EP-147 $442,700 EP-160 $341,500 EP-162 $41,500 EP-168 $82,500 EP-148 $116,000 EP-173 $51,000 EP-175 $296,000 EP-140 $300,000 EP-151 $280,000 EP-304 $385,000 EP-103 $336,667 EP-106 $393,333 Mullin's Brothers Paving Griffin & Davis Consulting June, 2018 February, 2020 November, 2020 December, 2020 http://www.eastpointcity.org Sales Tax $5,384,167 $5,384,167 $0 Green Green Active guest 2020 2021-10-11 22:24:39 NULL NULL NULL
EP- 9 EP-101 Bonnybrooke Way Resurfacing Tier 1 Maintenance and Safety Enhancements TSPLOST East Point Completed Maintenance and Safety Enhancements in City of East Point -Resurfacing. Bonnybrooke Way (see EP - 006) Mullin's Brothers Paving Griffin & Davis Consulting January, 2020 April, 2020 November, 2020 November, 2020 Sales Tax $103,000 $10,300 $92,700 Green Green Active guest 2020 2021-08-17 20:28:26 NULL NULL NULL
FA- 10 NULL E. Broad Street & E. Malone Street Pedestrian Improvements Project Tier 2 Pedestrian and Bike Improvements TSPLOST Fairburn Completed Pedestrian Improvements on E. Broad Street & E. Malone Street near Landmark Christain School. BOSS Concrete Design-Build April, 2018 August, 2018 November, 2018 October, 2018 Sales Tax $32,354 $32,354 $0 Green Green Active anthony.belcher@fairburn.com 2018 2025-08-01 07:44:59 GA E. Broad St. NULL
FA- 11 18-011 Renaissance Parkway Extension Project Tier 3 Congestion Relief TSPLOST Fairburn Completed Renaissance Parkway Roadway Extension Roadway project designed to provide congestiion relief to SR 74/Senoia Road. AMCON Construction Harris-Gray, LLC August, 2018 March, 2019 December, 2019 November, 2019 Sales Tax $87,611 $87,611 $0 Green Green Active lthompson@fairburn.com 2019 2021-09-08 19:24:28 NULL NULL NULL
FA- 12 19-002 Roadway Improvements on Various City Roads Project Tier 1 Maintenance and Safety Enhancements TSPLOST Fairburn Completed City-Wide Resurfacing, 2019 Roadway Improvements on Various City Roads Project Shepco Paving, Inc. In-House June, 2023 August, 2019 December, 2019 December, 2019 Sales Tax $544,894 $463,461 $81,433 Green Green Active lthompson@fairburn.com 2019 2020-12-17 13:31:23 NULL NULL NULL
FA- 13 20-004 Howell Avenue Extension Roadway Project Tier 1 Roadway Projects TSPLOST Fairburn Completed T-SPLOST Roadway Project designed to provide connectivity between Bohannon Road and SR74/Senoia Road, an alternative route for motorists (trucks), and to open up parcels for future development. Strack Incorporated Southeastern Engineering. Inc. May, 2020 July, 2020 July, 2021 June, 2021 Sales Tax $4,543,122 $1,872,795 $2,670,327 Green Green Active lthompson@fairburn.com 2020 2021-09-08 19:59:14 NULL NULL NULL
FA- 14 20-002 Roadway Improvements on Various City Roads Project Tier 1 Maintenance and Safety Enhancements TSPLOST Fairburn Completed 2020 City-Wide Resurfacing, Roadway Improvements Project C.W.Matthews In-House March, 2020 July, 2020 December, 2020 November, 2020 Sales Tax $1,157,670 $694,620 $463,050 Green Green Active lthompson@fairburn.com 2020 2020-12-17 20:18:13 NULL NULL NULL
FA- 15 25-004 Duncan Park Road, New Location Roadway Project Tier 1 Roadway Projects TSPLOST Fairburn Construction Extension of Park Road to provide a secondary entrance/exit into Clarence Duncan Park. REBID IFB: November 12th, 2025 Bid Opening: December 19th, 2025; 18 bids received. Low bidder: Piedmont Paving, Inc. for $4,566,732.55 NTP: March 16th, 2026 All work associated with the Duncan Park Road Project to be completed within three hundred and sixty (360) calendar days of the NTP. Piedmont Paving, Inc. Southeastern Engineering, Inc. November, 2025 March, 2026 May, 2027 March, 2027 Sales Tax $722,685 $0 $722,685 Green Green Active lthompson@fairburn.com 2026 2026-08-27 08:24:38 GA NULL NULL
FA- 16 21-001 Oakley Industrial Boulevard Full-Depth Reclamation Project Phase II Tier 1 Roadway Projects TSPLOST Fairburn Completed The work consists of full depth reclamation, asphalt paving and striping on Oakley Industrial Boulevard Road from the deceleration lane of the Solstice Apartment Complex to SR 74 as the base bid. In addition, (Add Alternate #1) Oakley Industrial Boulevard (from SR 74 to SR 92), (Add Alternate #2) Oakley Industrial Boulevard (from SR 92 to Fayetteville Road), (Add Alternate #4) Oakley Industrial Boulevard (from just west of Bohannon Road to Creekwood Road). C.W.Matthews Moreland Altobelli Associates, LLC December, 2020 July, 2021 March, 2022 October, 2021 Sales Tax $2,609,883 $1,191,210 $1,418,673 Green Green Active lthompson@fairburn.com 2021 2023-03-08 15:55:42 NULL NULL NULL
FA- 17 23-003 Rivertown Connector Project Tier 1 Roadway Projects TSPLOST Fairburn Planning City of Fairburn Roadway Project design to provide connectivity between Rivertown Road and Virlyn B. Smith Road. NULL SOUTHEASTERN ENGINEERING INC. April, 2025 May, 2025 August, 2025 July, 2025 Sales Tax $937,240 $0 $937,240 Gray Gray Inactive lthompson@fairburn.com 2020 2026-08-31 10:12:18 NULL NULL NULL
FA- 18 NULL SR 14/Senoia Road Traffic Signal Project Tier 1 Quick Response TSPLOST Fairburn Completed Operation and Safety Improvements in City of Fairburn - To Be Determined 11/10/2020: There are several reasons why the District does not recommend a signal to be installed at this location. The reasons why can be a bit difficult to explain because there is a lot to consider when it comes to signalizing an intersection but basically the intersection does not meet vehicular or pedestrian volume thresholds needed to warrant a signal and the number of correctable crashes also do not meet the necessary threshold to warrant installation of a signal. This intersection seems to be congested during “peak hours” of the day, and all other hours have very little volume. Adding a signal at this location would cause unnecessary delay to the surrounding roadway network that already appears to have signalized intersections that may not be needed. Josh Montefusco GDOT, District 7 Traffic Operations Manager JMontefusco@dot.ga.gov Revised TE Report submitted to GDOT on 05/02/2025. If a Pedestrian Hybrid Beacon is the final recommendation, Railroad coordination may not be required. NULL Pond & Company NULL NULL NULL NULL Sales Tax $200,000 $15,530 $184,470 Gray Gray Active lthompson@fairburn.com 2020 2026-08-31 10:23:18 NULL NULL NULL
FA- 19 20-005 Bohannon Road Sidewalk Project Tier 2 Pedestrian and Bike Improvements TSPLOST Fairburn Completed Pedestrian Improvements project designed to provide workers in the area a safe route to and from work. The Corbett Group Moreland Altobelli Associates, LLC April, 2020 July, 2020 December, 2020 November, 2020 Sales Tax $234,488 $23,862 $210,626 Green NULL Active lthompson@fairburn.com 2020 2021-09-08 19:41:40 NULL NULL NULL
FA- 20 NULL Quiet Zone R/R Crossings Project Tier 2 Operation and Safety Improvements TSPLOST Fairburn Planning Quiet Zone Railroad Crossings Project Authorized a Task Order with Pond & Company for Quiet Zone Evaluation and Report on December 16, 2025. Quiet Zone Support Agreement with CSX for $25,300.00 executed on October 7, 2025. Quiet Zone Field Diagnostic conducted on February 6, 2026. NULL Pond & Company NULL NULL NULL NULL Sales Tax $750,000 $0 $750,000 Gray Gray Active lthompson@fairburn.com 2020 2026-08-31 10:13:22 NULL NULL NULL
FA- 21 20-001 Pedestrian Improvements on Various City Roads Tier 2 Pedestrian and Bike Improvements TSPLOST Fairburn Completed 2020 TSPLOST Pedestrian Improvements, Pedestrian Improvements on Various City Roads Construction 57 In-House February, 2020 May, 2020 July, 2020 June, 2020 Sales Tax $182,250 $181,586 $664 Green Green Active lthompson@fairburn.com 2020 2020-12-17 20:45:08 NULL NULL NULL
FA- 22 21-004 Roadway Improvements on Various City Roads Project Tier 1 Maintenance and Safety Enhancements TSPLOST Fairburn Completed 2021 City-Wide Resurfacing Blount Construction Company, Inc. In-House May, 2021 September, 2021 March, 2022 December, 2021 Sales Tax $1,649,113 $1,061,356 $587,757 Green Green Active lthompson@fairburn.com 2021 2023-03-08 16:13:32 NULL NULL NULL
FA- 23 NULL 2022 Roadway Improvement on Various City Roads Project Tier 1 Maintenance and Safety Enhancements TSPLOST Fairburn Completed 2022 City-Wide Resurfacing Project. Magnum Paving, LLC In-House February, 2022 June, 2022 October, 2022 September, 2022 Sales Tax $1,802,279 $1,525,031 $277,248 Green Green Active lthompson@fairburn.com 2022 2023-03-08 16:31:05 NULL NULL NULL
FA- 24 NULL Quick Response Project Tier 3 Quick Response TSPLOST Fairburn Planning Quick Response Project NULL NULL NULL NULL NULL NULL Sales Tax $41,417 $0 $41,417 Gray Gray Active lthompson@fairburn.com NULL NULL NULL NULL NULL
FA- 25 20-003 Dodd Street Pedestrian Improvements Tier 1 Maintenance and Safety Enhancements TSPLOST Fairburn Completed Streetscape project on Dodd Street in the Lightning Neighborhood. The work includes the removal of existing header curb, installation of new header curb, installation of new sidewalk, replacement of existing sidewalk as required, installation of new ADA handicap ramps, the replacement of existing handicap ramps as required, and the installation of concrete sidewalk-header curb-retaining wall combination as required. The scope of the Add Alternate includes milling, asphalt paving, the installation of traffic-print textured paving crosswalks, manhole adjustments and associated tasks. *It is important to note that TSPLOST dollars were spent on the Add-Alternate only. The Corbett Group In-House April, 2020 June, 2020 December, 2020 November, 2020 Sales Tax $409,659 $31,449 $378,210 Green Green Active lthompson@fairburn.com 2020 2021-09-09 11:53:10 NULL NULL NULL
FA- 26 NULL Milo Fisher, Bay Street & Grant Street Pedestrian Improvements Tier 2 Pedestrian and Bike Improvements TSPLOST Fairburn Completed Extend sidewalk on Milo Fisher to the intersection of Clayton Street, extend sidewalk on Bay Street to the intersection of Malone Street, install sidewalk on Grant street from Milo Fisher Street to Chestnut Street. BOSS Concrete Construction, LLC NULL March, 2021 April, 2021 June, 2021 May, 2021 Sales Tax $25,000 $19,977 $5,023 Green Green Active lthompson@fairburn.com 2021 2021-09-09 11:55:01 NULL NULL NULL
FA- 27 25-004 City Wide Road Resurfacing Tier 1 Roadway Projects TSPLOST2 Fairburn Completed The City of Fairburn will accept sealed bids from qualified Contractors for furnishing all labor, equipment, and materials necessary to complete 4.1 mi of Roadway Improvements ON VARIOUS CITY ROADS Contract #25-004. The work includes milling, temporary traffic control, asphalt paving, manhole adjustments and associated tasks. The scope of Add Alternate #1 consists of the paving of the VETERANS OF FOREIGN WARS (VFW) parking lot located at 1699 Park Rd. Fairburn, GA 30213. All work must be completed within one hundred and twenty (120) calendar days of the Notice to Proceed (NTP). The first $224,198.83 in project expenditures was paid for with a GDOT LMIG Grant; the second $275,054.39 in project expenditures was paid for with a GDOT Local Road Assistance (LRA) Grant; Add Alternate #1 expenditures ($167,592.18) for paving the Veterans of Foreign Wars (VFW) Parking Lot at Duncan Park was paid for with Capital Improvements Projects funds; and the remaining $1,262,737.92 was paid with TSPLOST Funds. The total project cost total was $1,929,583.32. TRIPLE R CONSTRUCTION In-house June, 2025 July, 2025 November, 2025 October, 2025 Fairburn Sales Tax $1,688,078 $1,262,738 $425,340 Green Green Active lthompson@fairburn.com 2025 2026-08-31 10:11:13 Georgia City of Fairburn 2022-03-31
SUM = 1,354,206,592 SUM = 717,806,831 SUM = 636,399,761