| Project ID | Local ID | Project Name Title | Tier | Project Type | Initiatve Type | City | Current Stage | Project Description | Construction Firm Selected | Design Firm Selected | Estimated Design Completion Date | Estimated Start Date For Project | Estimated Construction Completion Date | Estimated Substantial Completion Date | Link To External Website | Primary Funding Source | TSPLOST Budget ($) | TSPLOST Dollars Spent ($) | TSPLOST Dollars Committed (not spent) ($) | Cost Status | Schedule Status | Status | Editor | Project Year | Last Update | State | Address | Creation Date |
| CSF- 81 | SU 702 | Flat Shoals Rd at Kimberly Mill Road | Tier 1 | Operation and Safety Improvements | TSPLOST | City of South Fulton | Planning | The overall objective of this project is the redesign and reconstruction of eleven (11) traffic signals along the Flat Shoals Road corridor to complement the proposed Advanced Traffic Management System (ATMS) along the corridor. Closed Circuit TV (CCTV) cameras will be installed as well as fiber optic drop cables to the cameras and existing traffic signals. Traffic signals will be timed to maintain coordinated traffic flow through the synchronized intersections. The progression of vehicles along the major roadway will be given priority even when the characteristics of the roadway traffic flow and control changes. | NULL | NULL | NULL | July, 2019 | NULL | NULL | Sales Tax | $250,000 | $0 | $250,000 | Green | Green | Active | NULL | NULL | NULL | NULL | NULL | NULL | |
| CSF- 82 | RST 218 | Forrest Creek | Tier 1 | Maintenance and Safety Enhancements | TSPLOST | City of South Fulton | Completed | The primary work is to resurface the final asphalt topping layer. The roads (Amberland Sq, Bluemist Cove, Graywind Trl, and Jadetree La) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work includes all necessary preparation work (e.g., full depth patching and a single surface treatment). The roads will then have the final asphalt topping layer installed in a manner that will provide uniformity of the asphalt. Milling of the existing asphalt surface is not expected to be required for these roadways. | E R Snell | Not Applicable | Not Applicable | March, 2018 | August, 2018 | Not Applicable | Sales Tax | $86,578 | $101,379 | $-14,801 | Red | Green | Active | roussan.francois@fultoncountyga.gov | 2017 | 2021-05-03 20:14:31 | NULL | NULL | NULL | |
| CSF- 83 | SU 703 | Flat Shoals Rd at Red Oak Rd | Tier 1 | Operation and Safety Improvements | TSPLOST | City of South Fulton | Planning | The overall objective of this project is the redesign and reconstruction of eleven (11) traffic signals along the Flat Shoals Road corridor to complement the proposed Advanced Traffic Management System (ATMS) along the corridor. Closed Circuit TV (CCTV) cameras will be installed as well as fiber optic drop cables to the cameras and existing traffic signals. Traffic signals will be timed to maintain coordinated traffic flow through the synchronized intersections. The progression of vehicles along the major roadway will be given priority even when the characteristics of the roadway traffic flow and control changes. | Not Applicable | Not Applicable | NULL | July, 2019 | NULL | NULL | Sales Tax | $250,000 | $0 | $250,000 | Green | Green | Active | NULL | NULL | NULL | NULL | NULL | NULL | |
| CSF- 84 | SU 704 | Flat Shoals Rd at Hidden Brook Dr | Tier 1 | Operation and Safety Improvements | TSPLOST | City of South Fulton | Planning | The overall objective of this project is the redesign and reconstruction of eleven (11) traffic signals along the Flat Shoals Road corridor to complement the proposed Advanced Traffic Management System (ATMS) along the corridor. Closed Circuit TV (CCTV) cameras will be installed as well as fiber optic drop cables to the cameras and existing traffic signals. Traffic signals will be timed to maintain coordinated traffic flow through the synchronized intersections. The progression of vehicles along the major roadway will be given priority even when the characteristics of the roadway traffic flow and control changes. | NULL | NULL | NULL | July, 2019 | NULL | NULL | Sales Tax | $250,000 | $0 | $250,000 | Green | Green | Active | NULL | NULL | NULL | NULL | NULL | NULL | |
| CSF- 85 | SU 705 | Flat Shoals Rd at Connel Rd | Tier 1 | Operation and Safety Improvements | TSPLOST | City of South Fulton | Planning | The overall objective of this project is the redesign and reconstruction of eleven (11) traffic signals along the Flat Shoals Road corridor to complement the proposed Advanced Traffic Management System (ATMS) along the corridor. Closed Circuit TV (CCTV) cameras will be installed as well as fiber optic drop cables to the cameras and existing traffic signals. Traffic signals will be timed to maintain coordinated traffic flow through the synchronized intersections. The progression of vehicles along the major roadway will be given priority even when the characteristics of the roadway traffic flow and control changes. | NULL | NULL | NULL | July, 2019 | NULL | NULL | Sales Tax | $250,000 | $0 | $250,000 | Green | Green | Active | NULL | NULL | NULL | NULL | NULL | NULL | |
| CSF- 86 | SU 706 | Flat Shoals Rd at Buffington Rd | Tier 1 | Operation and Safety Improvements | TSPLOST | City of South Fulton | Planning | The overall objective of this project is the redesign and reconstruction of eleven (11) traffic signals along the Flat Shoals Road corridor to complement the proposed Advanced Traffic Management System (ATMS) along the corridor. Closed Circuit TV (CCTV) cameras will be installed as well as fiber optic drop cables to the cameras and existing traffic signals. Traffic signals will be timed to maintain coordinated traffic flow through the synchronized intersections. The progression of vehicles along the major roadway will be given priority even when the characteristics of the roadway traffic flow and control changes. | NULL | NULL | NULL | July, 2019 | NULL | NULL | Sales Tax | $250,000 | $0 | $250,000 | Green | Green | Active | NULL | NULL | NULL | NULL | NULL | NULL | |
| CSF- 87 | SU 707 | Flat Shoals Rd at I -85 North | Tier 1 | Operation and Safety Improvements | TSPLOST | City of South Fulton | Planning | The overall objective of this project is the redesign and reconstruction of eleven (11) traffic signals along the flat Shoals Road corridor to complement the proposed ATMS along the corridor. CCTV cameras will be installed as well as fiber optic drop cables to the cameras and existing traffic signals. Traffic signals will be timed to maintain coordinated traffic flow progression through the synchronized intersections. The progression of vehicles along the major roadway will be given priority even when the characteristics of the roadway traffic flow and control changes. | NULL | NULL | NULL | July, 2019 | NULL | NULL | Sales Tax | $250,000 | $0 | $250,000 | Green | Green | Active | NULL | NULL | NULL | NULL | NULL | NULL | |
| CSF- 88 | SU 708 | Flat Shoals Rd at I -85 South | Tier 1 | Operation and Safety Improvements | TSPLOST | City of South Fulton | Planning | The overall objective of this project is the redesign and reconstruction of eleven (11) traffic signals along the Flat Shoals Road corridor to complement the proposed Advanced Traffic Management System (ATMS) along the corridor. Closed Circuit TV (CCTV) cameras will be installed as well as fiber optic drop cables to the cameras and existing traffic signals. Traffic signals will be timed to maintain coordinated traffic flow through the synchronized intersections. The progression of vehicles along the major roadway will be given priority even when the characteristics of the roadway traffic flow and control changes. | NULL | NULL | NULL | July, 2019 | NULL | NULL | Sales Tax | $250,000 | $0 | $250,000 | Green | Green | Active | NULL | NULL | NULL | NULL | NULL | NULL | |
| CSF- 89 | SU 709 | Flat Shoals Rd at Feldwood Rd | Tier 1 | Operation and Safety Improvements | TSPLOST | City of South Fulton | Planning | The overall objective of this project is the redesign and reconstruction of eleven (11) traffic signals along the Flat Shoals Road corridor to complement the proposed Advanced Traffic Management System (ATMS) along the corridor. Closed Circuit TV (CCTV) cameras will be installed as well as fiber optic drop cables to the cameras and existing traffic signals. Traffic signals will be timed to maintain coordinated traffic flow through the synchronized intersections. The progression of vehicles along the major roadway will be given priority even when the characteristics of the roadway traffic flow and control changes. | NULL | NULL | NULL | July, 2019 | NULL | NULL | Sales Tax | $250,000 | $0 | $250,000 | Green | Green | Active | NULL | NULL | NULL | NULL | NULL | NULL | |
| CSF- 9 | RC 108 | Old Fairburn Road (Union Rd to Camp Creek Pkwy) | Tier 1 | Maintenance and Safety Enhancements | TSPLOST | City of South Fulton | Completed | The Old Fairburn Road (Union Rd to Camp Creek Pkwy) to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled. | E R Snell | Not Applicable | Not Applicable | March, 2018 | August, 2018 | December, 2017 | Sales Tax | $606,253 | $642,227 | $-35,974 | Yellow | Green | Active | roussan.francois@fultoncountyga.gov | 2017 | 2021-05-03 16:15:50 | NULL | NULL | NULL | |
| CSF- 90 | SU 710 | Flat Shoals Rd at Mallory Rd | Tier 1 | Operation and Safety Improvements | TSPLOST | City of South Fulton | Planning | The overall objective of this project is the redesign and reconstruction of eleven (11) traffic signals along the Flat Shoals Road corridor to complement the proposed Advanced Traffic Management System (ATMS) along the corridor. Closed Circuit TV (CCTV) cameras will be installed as well as fiber optic drop cables to the cameras and existing traffic signals. Traffic signals will be timed to maintain coordinated traffic flow through the synchronized intersections. The progression of vehicles along the major roadway will be given priority even when the characteristics of the roadway traffic flow and control changes. | NULL | NULL | NULL | July, 2019 | NULL | NULL | Sales Tax | $250,000 | $0 | $250,000 | Green | Green | Active | NULL | NULL | NULL | NULL | NULL | NULL | |
| CSF- 91 | ATMS 800 | Flat Shoals Road | Tier 2 | Operation and Safety Improvements | TSPLOST | City of South Fulton | Design | The overall objective of this project is the redesign and reconstruction of eleven (11) traffic signals along the Flat Shoals Road corridor to complement the proposed Advanced Traffic Management System (ATMS) along the corridor. Closed Circuit TV (CCTV) cameras will be installed as well as fiber optic drop cables to the cameras and existing traffic signals. Traffic signals will be timed to maintain coordinated traffic flow through the synchronized intersections. The progression of vehicles along the major roadway will be given priority even when the characteristics of the roadway traffic flow and control changes. | NULL | NULL | December, 2021 | July, 2021 | March, 2023 | NULL | Sales Tax | $1,000,000 | $326,837 | $673,163 | Green | Green | Active | roussan.francois@fultoncountyga.gov | 2020 | 2021-05-03 23:10:11 | NULL | NULL | NULL | |
| CSF- 92 | PBI 900 | Danforth Road (Rehoboth Circle to Cascade Road) | Tier 1 | Pedestrian and Bike Improvements | TSPLOST | City of South Fulton | Construction | The project scope includes the installation of 5 foot-wide concrete ADA (Americans with Disabilities Act) compliant sidewalks, concrete curb and gutter, a 2- foot stamped concrete, drainage and pedestrian lighting on both sides of Danforth Road from Rehoboth Circle to Cascade Road. The approximate length of the project is 0.8 mile. | CMC, INC | AEI | September, 2022 | February, 2022 | December, 2023 | NULL | Sales Tax | $2,250,000 | $90,653 | $2,159,347 | Green | Green | Active | roussan.francois@fultoncountyga.gov | 2017 | 2023-03-06 12:44:33 | NULL | NULL | NULL | |
| CSF- 93 | PBI 901 | Enon Road (Lynarbor Lane to Sanford J. Jones) | Tier 1 | Pedestrian and Bike Improvements | TSPLOST | City of South Fulton | Design | Proposed project includes sidewalk facilities along both sides of Enon Road from just north of Lynarbor Lane and extends to Sanford J. Jones Boulevard for a distance of approximately 1.5 miles. Project features include adding 5-6 foot sidewalks along the west side, 8-ft. sidewalks along east side from Lynarbor Lane to Sanford J. Jones Boulevard. Drainage improvements, curb and gutter, and 2-foot stamped concrete is also included. | NULL | AAEI | March, 2023 | September, 2020 | June, 2024 | NULL | Sales Tax | $2,000,000 | $43,650 | $1,956,350 | Green | Green | Active | roussan.francois@fultoncountyga.gov | 2017 | 2023-03-06 12:46:48 | NULL | NULL | NULL | |
| CSF- 94 | RST 203 | Falls @ Cascade Palms Phase 2 | Tier 1 | Maintenance and Safety Enhancements | TSPLOST | City of South Fulton | Completed | The roads (Palmview Court, Smithers Way, Talkeetna Court, Muskeg Court, and Cutbank Court) within the subdivision is to resurface the final asphalt topping layer. The roads within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work includes all necessary preparation work (e.g., full depth patching and a single surface treatment). The roads will then have the final asphalt topping layer installed in a manner that will provide uniformity of the asphalt. The subject subdivison was topped through an earlier contract outside TSPLOST funding. | E R Snell | Not Applicable | Not Applicable | March, 2018 | August, 2018 | Not Applicable | Sales Tax | $86,578 | $103,523 | $-16,945 | Red | Green | Active | roussan.francois@fultoncountyga.gov | 2017 | 2021-05-03 20:31:37 | NULL | NULL | NULL | |
| CSF- 95 | OSI 600 | Bethsaida Road at Creel Road | Tier 2 | Operation and Safety Improvements | TSPLOST | City of South Fulton | Planning | Intersection will include either a roundabout or conventional improvements. A conventional improvement includes additional turn lanes and sometimes, if warranted, a signal. Whichever alternative is concluded, sidewalks, street lights, curb & gutter, and drainage will be included. | NULL | NULL | NULL | July, 2021 | NULL | NULL | Sales Tax | $1,353,600 | $0 | $1,353,600 | Gray | Gray | Active | NULL | NULL | NULL | NULL | NULL | NULL | |
| CSF- 96 | RST 204 | Foxfire PH2, (LL 124/133 Dist 13) | Tier 1 | Maintenance and Safety Enhancements | TSPLOST | City of South Fulton | Completed | The primary work is to resurface the final asphalt topping layer. The roads (Grey Fox Way and Polar Fox Ct) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work includes all necessary preparation work (e.g., full depth patching and a single surface treatment). The roads will then have the final asphalt topping layer installed in a manner that will provide uniformity of the asphalt. Milling of the existing asphalt surface is not expected to be required for these roadways. | E R Snell | Not Applicable | Not Applicable | March, 2018 | August, 2018 | Not Applicable | Sales Tax | $57,555 | $113,654 | $-56,099 | Red | Green | Active | roussan.francois@fultoncountyga.gov | 2017 | 2021-05-03 20:31:52 | NULL | NULL | NULL | |
| CSF- 97 | RST 205 | Herron Creek PH2, (LL 99 Dist 14FF, LL 175 Dist 9C) | Tier 1 | Maintenance and Safety Enhancements | TSPLOST | City of South Fulton | Completed | The primary work is to resurface the final asphalt topping layer. The roads (Halcyon Dr, Herron Trl, Herron La, Herron Pass, Herron Point, and Herron Trace) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work includes all necessary preparation work (e.g., full depth patching and a single surface treatment). The roads will then have the final asphalt topping layer installed in a manner that will provide uniformity of the asphalt. Milling of the existing asphalt surface is not expected to be required for these roadways. | E R Snell | Not Applicable | Not Applicable | March, 2018 | August, 2018 | Not Applicable | Sales Tax | $68,057 | $90,131 | $-22,074 | Red | Green | Active | roussan.francois@fultoncountyga.gov | 2017 | 2021-05-03 20:32:08 | NULL | NULL | NULL | |
| CSF- 98 | RST 206 | Lake Royale U3, (LL 188 Dist 13) | Tier 1 | Maintenance and Safety Enhancements | TSPLOST | City of South Fulton | Completed | The primary work is to resurface the final asphalt topping layer. The roads (Lake Rorale Drive and Lake Royale Pl)) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work includes all necessary preparation work (e.g., full depth patching and a single surface treatment). The roads will then have the final asphalt topping layer installed in a manner that will provide uniformity of the asphalt. Milling of the existing asphalt surface is not expected to be required for these roadways. | E R Snell | Not Applicable | Not Applicable | NULL | November, 2017 | Not Applicable | Sales Tax | $43,845 | $32,373 | $11,472 | Green | Green | Active | roussan.francois@fultoncountyga.gov | 2017 | 2021-05-03 20:32:26 | NULL | NULL | NULL | |
| CSF- 99 | RST 207 | Le Jardin Multiple Phases | Tier 1 | Maintenance and Safety Enhancements | TSPLOST | City of South Fulton | Completed | The primary work is to resurface the final asphalt topping layer. The roads (Artistry Way, Botanica Way, Butchart Pl, Concerto Ct, Le Jardin Blvd, Les Fleurs La, Matisse Lane, Queen Ann Cage Ct, and Tapestry Club Dr) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work includes all necessary preparation work (e.g., full depth patching and a single surface treatment). The roads will then have the final asphalt topping layer installed in a manner that will provide uniformity of the asphalt. Milling of the existing asphalt surface is not expected to be required for these roadways. | E R Snell | Not Applicable | Not Applicable | March, 2018 | August, 2018 | Not Applicable | Sales Tax | $250,000 | $245,590 | $4,410 | Green | Green | Active | roussan.francois@fultoncountyga.gov | 2017 | 2021-05-03 20:32:41 | NULL | NULL | NULL | |
| SUM = 193,906,703 | SUM = 142,040,425,058 | SUM = -141,846,518,355 |