| Project ID | Local ID | Project Name Title | Tier | Project Type | Initiatve Type | City | Current Stage | Project Description | Construction Firm Selected | Design Firm Selected | Estimated Design Completion Date | Estimated Start Date For Project | Estimated Construction Completion Date | Estimated Substantial Completion Date | Link To External Website | Primary Funding Source | TSPLOST Budget ($) | TSPLOST Dollars Spent ($) | TSPLOST Dollars Committed (not spent) ($) | Cost Status | Schedule Status | Status | Editor | Project Year | Last Update | State | Address | Creation Date |
| CSF- 49 | RS 404 | Woodland Estates | Tier 1 | Maintenance and Safety Enhancements | TSPLOST | City of South Fulton | Completed | The roads (Commonwood Place, Keels Lane, Smoke Ridge Drive II, Springtree Court, Squirrel Way, and Woody Path Lane) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled. | CWM | Not Applicable | Not Applicable | NULL | May, 2019 | NULL | Sales Tax | $210,714 | $129,044 | $81,670 | Green | Green | Active | roussan.francois@fultoncountyga.gov | 2018 | 2021-05-03 20:29:35 | NULL | NULL | NULL | |
| CSF- 5 | RC 104 | Creel Road (Old National Hwy to West Rd) | Tier 1 | Maintenance and Safety Enhancements | TSPLOST | City of South Fulton | Completed | The Creel Road (Old National Hwy to West Rd) to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled. | NULL | Not Applicable | Not Applicable | March, 2019 | August, 2019 | NULL | Sales Tax | $295,100 | $283,472 | $11,628 | Green | Green | Active | roussan.francois@fultoncountyga.gov | 2019 | 2021-05-03 16:11:47 | NULL | NULL | NULL | |
| CSF- 50 | RS 405 | Woodward Estates | Tier 1 | Maintenance and Safety Enhancements | TSPLOST | City of South Fulton | Completed | The roads (Amethist Court, Garnett Way, Mica Trace, Old Rocky Road, Rockway Road, Rocky Court, Topaz Trail, Turquoise Trail, and Woodward Road) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled. | CWM | Not Applicable | Not Applicable | NULL | June, 2019 | NULL | Sales Tax | $469,318 | $294,440 | $174,878 | Green | Green | Active | roussan.francois@fultoncountyga.gov | 2018 | 2021-05-03 20:29:52 | NULL | NULL | NULL | |
| CSF- 51 | B 500 | Butner Road over Camp Creek | Tier 1 | Bridges | TSPLOST | City of South Fulton | Design | The proposed Butner Road over Camp Creek includes improvements to the bridge that will extend to the Camp Creek Parkway edge of pavement on the south leg of the intersection. A new bridge is proposed to replace the existing near the Butner Road/Camp Creek Parkway intersection. The proposed bridge will be wide enough to accommodate two traffic lanes of 24-ft wide, 30'' curb and gutter and 12-ft wide pedestrian sidewalk on the west side to tie into a proposed multi-use trail off the bridge and 6-ft wide sidewalk on the east side. A turning lane will be designed off the bridge to finish free flow and stacking length up to the intersection with Camp Creek Parkway. | NULL | William-Russell & Johnson | December, 2022 | April, 2020 | September, 2024 | NULL | Sales Tax | $1,600,000 | $61,911 | $1,538,089 | Green | Green | Active | roussan.francois@fultoncountyga.gov | 2019 | 2023-03-05 00:19:21 | NULL | NULL | NULL | |
| CSF- 52 | RST 200 | Camp Creek Village (SFR), (LL 73 Dist 14FF) | Tier 1 | Maintenance and Safety Enhancements | TSPLOST | City of South Fulton | Completed | The primary work is to resurface the final asphalt topping layer. The roads (Zultana and zoya) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work includes all necessary preparation work (e.g., full depth patching and a single surface treatment). The roads will then have the final asphalt topping layer installed in a manner that will provide uniformity of the asphalt. Milling of the existing asphalt surface is not expected to be required for these roadways. | E R Snell | Not Applicable | Not Applicable | March, 2018 | August, 2018 | Not Applicable | Sales Tax | $44,140 | $49,491 | $-5,351 | Red | Green | Active | roussan.francois@fultoncountyga.gov | 2017 | 2021-05-03 20:30:27 | NULL | NULL | NULL | |
| CSF- 53 | B 501 | Enon Road over Camp Creek Tributary (Timber Bridge) | Tier 1 | Bridges | TSPLOST | City of South Fulton | Design | The proposed project will replace the existing culvert located on Enon Road between Enon Mill Drive and Enon Pines Drive. The deteriorated timber culvert will be removed and replaced with a structure to carry two 12-foot travel lanes and 8-foot shoulders, which include 6-foot sidewalks. | NULL | AEI | February, 2022 | December, 2022 | February, 2024 | NULL | Sales Tax | $600,000 | $87,454 | $512,546 | Green | Green | Active | roussan.francois@fultoncountyga.gov | 2020 | 2023-03-05 00:22:05 | NULL | NULL | NULL | |
| CSF- 54 | B 502 | Bethsaida over Morning Creek | Tier 2 | Bridges | TSPLOST | City of South Fulton | Planning | Bridge replacement to be analyzed for a better rating capacity and alleviate congestion. | NULL | NULL | NULL | NULL | NULL | NULL | Sales Tax | $1,500,000 | $0 | $1,500,000 | Gray | Gray | Active | roussan.francois@fultoncountyga.gov | NULL | 2023-03-05 00:23:02 | NULL | NULL | NULL | |
| CSF- 55 | OSI 601 | Butner Road @ Camp Creek Parkway | Tier 1 | Operation and Safety Improvements | TSPLOST | City of South Fulton | Design | The proposed Butner Road project is a capacity project that begins at the intersection of Camp Creek Parkway and extends approximately 1,000 feet to the north along Butner Road. It consists of widening the existing Butner Road by adding left and right-turn lanes, providing a nature trail at-grade crossing and updating the intersection signalization and guardrails, as a safety measure, on the east side of Butner Road to Merk Road. The travel lanes will be minimum 11 foot-wide with 2-foot stamped concrete and 12-foot trail on the east side. This project also includes signal upgrade and installation of new decorative mast arms. | NULL | American Engineers, Inc | December, 2022 | August, 2020 | January, 2025 | NULL | Sales Tax | $3,174,000 | $16,250 | $3,157,750 | Green | Green | Active | roussan.francois@fultoncountyga.gov | 2017 | 2023-03-05 00:26:37 | NULL | NULL | NULL | |
| CSF- 56 | OSI 602 | Butner Road @ Union Road | Tier 1 | Operation and Safety Improvements | TSPLOST | City of South Fulton | Design | Intersection improvements will include the use of an oval roundabout or circular roundabout. A traffic report concluded that a roundabout is the best alternative to handle the traffic congestion at this intersection. Additional improvements include drainage, curb & gutter, street lights, and sidewalks. | NULL | American Engineers, Inc | December, 2022 | December, 2019 | August, 2024 | NULL | https://performance.fultoncountyga.gov/stories/s/v555-6sca | Sales Tax | $1,986,000 | $241,500 | $1,744,500 | Green | Green | Active | roussan.francois@fultoncountyga.gov | 2017 | 2023-03-05 00:28:01 | NULL | NULL | NULL |
| CSF- 57 | OSI 603 | Butner Road @ Pittman Road | Tier 1 | Operation and Safety Improvements | TSPLOST | City of South Fulton | Design | The proposed project will improve traffic safety by realigning the approach of PIttman Road to eliminate an extreme angle of incidence at the intersection. Additional improvements include curb & gutter, drainage, sidewalks, and streetlights | NULL | AEI | May, 2023 | December, 2020 | December, 2024 | NULL | Sales Tax | $1,412,000 | $73,234 | $1,338,766 | Green | Green | Active | roussan.francois@fultoncountyga.gov | 2020 | 2023-03-05 00:30:11 | NULL | NULL | NULL | |
| CSF- 58 | OSI 604 | Campbellton Road @ Stonewall Tell Road (Project Design on Hold) | Tier 1 | Operation and Safety Improvements | TSPLOST | City of South Fulton | Construction | Intersection will be analyzed for traffic improvements including a roundabout alternative. Curb & Gutter, drainage, sidewalks, and street lights will be part of the proposed improvements. The intersection improvements will provide geometric and congestion relief. | CMC, INC | American Engineers, Inc | December, 2022 | April, 2020 | March, 2024 | NULL | Sales Tax | $1,422,000 | $172,932 | $1,249,068 | Red | Green | Active | roussan.francois@fultoncountyga.gov | 2017 | 2023-03-05 00:40:45 | NULL | NULL | NULL | |
| CSF- 59 | OSI 605 | Campbellton-Fairburn Road @ Jones Road (Project Design on Hold) | Tier 1 | Operation and Safety Improvements | TSPLOST | City of South Fulton | Design | Geometric and capacity improvements to include traditional or roundabouts | NULL | American Engineers, Inc | August, 2018 | NULL | August, 2019 | NULL | Sales Tax | $1,464,000 | $0 | $1,464,000 | Green | Green | Active | roussan.francois@fultoncountyga.gov | NULL | 2021-05-03 22:55:24 | NULL | NULL | NULL | |
| CSF- 6 | RC 105 | Enon Road (Stonewall Tell Rd to Atlanta City limits) | Tier 1 | Maintenance and Safety Enhancements | TSPLOST | City of South Fulton | Completed | The Enon Road (Stonewall Tell Rd to Atlanta City limits)to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled. | NULL | Not Applicable | Not Applicable | March, 2019 | August, 2019 | NULL | Sales Tax | $921,496 | $752,801 | $168,695 | Green | Green | Active | roussan.francois@fultoncountyga.gov | 2018 | 2021-05-03 16:12:54 | NULL | NULL | NULL | |
| CSF- 60 | OSI 606 | Cascade-Palmetto Highway @ West Stubbs Road | Tier 1 | Operation and Safety Improvements | TSPLOST | City of South Fulton | Completed | The project and plans reflect the installation of a new signal at the intersection of Cascade Palmetto Highway and West Stubbs Road. In addition, it includes the installation of curb & gutter, a solar powered advanced signal warning sign, ADA ramps, and signing & marking. The existing non-signalized intersection already includes the necessary turn lanes and right of way. | NULL | Not Applicable | Not Applicable | May, 2018 | November, 2018 | NULL | Sales Tax | $1,554,000 | $272,757 | $1,281,243 | Green | Green | Active | roussan.francois@fultoncountyga.gov | 2019 | 2021-05-03 22:46:16 | NULL | NULL | NULL | |
| CSF- 61 | OSI 607 | Demooney Road @ West Stubbs Road | Tier 1 | Operation and Safety Improvements | TSPLOST | City of South Fulton | Design | Intersection improvements will include the addition of a circular roundabout to address congestion and reduce the severity of accidents at this intersection. Additional improvements include drainage, curb & gutter, streetlights, and 5' wide sidewalks. | NULL | AEI | May, 2023 | December, 2020 | November, 2024 | NULL | Sales Tax | $1,422,000 | $108,809 | $1,313,191 | Green | Green | Active | roussan.francois@fultoncountyga.gov | 2021 | 2023-03-05 00:38:41 | NULL | NULL | NULL | |
| CSF- 62 | OSI 608 | Enon Road @ Stonewall Tell Road | Tier 1 | Operation and Safety Improvements | TSPLOST | City of South Fulton | Design | .Intersection will be analyzed for traffic improvements including a roundabout alternative. Curb & Gutter, drainage, sidewalks, and street lights will be part of the proposed improvements. The intersection improvements will provide geometric and congestion relief. | NULL | AEI | May, 2023 | December, 2020 | October, 2024 | NULL | Sales Tax | $1,674,000 | $104,310 | $1,569,690 | Green | Green | Active | roussan.francois@fultoncountyga.gov | 2021 | 2023-03-05 00:40:33 | NULL | NULL | NULL | |
| CSF- 63 | RST 201 | Chestnut Ridge @ Cedar Grove | Tier 1 | Maintenance and Safety Enhancements | TSPLOST | City of South Fulton | Completed | The roads (Appaloose Cove and Sorrel Drive) within the subdivision is to resurface the final asphalt topping layer. The roads within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work includes all necessary preparation work (e.g., full depth patching and a single surface treatment). The roads will then have the final asphalt topping layer installed in a manner that will provide uniformity of the asphalt. Milling of the existing asphalt surface is not expected to be required for these roadways. | E R Snell | Not Applicable | Not Applicable | March, 2018 | August, 2018 | Not Applicable | Sales Tax | $41,187 | $39,476 | $1,711 | Green | Green | Active | roussan.francois@fultoncountyga.gov | 2017 | 2021-05-03 20:30:42 | NULL | NULL | NULL | |
| CSF- 64 | OSI 609 | Feldwood Road @ Morning Creek Drive | Tier 1 | Operation and Safety Improvements | TSPLOST | City of South Fulton | Completed | Intersection will be analyzed for traffic improvements including a roundabout alternative. Curb & Gutter, drainage, sidewalks, and street lights will be part of the proposed improvements. The intersection improvements will provide geometric and congestion relief. | NULL | AEI | December, 2022 | NULL | January, 2023 | NULL | Sales Tax | $952,800 | $79,878 | $872,922 | Green | Green | Active | roussan.francois@fultoncountyga.gov | 2021 | 2023-03-05 00:42:06 | NULL | NULL | NULL | |
| CSF- 65 | OSI 610 | Feldwood Road @ Bench Mark Drive | Tier 1 | Operation and Safety Improvements | TSPLOST | City of South Fulton | Completed | Intersection will be analyzed for traffic improvements including a roundabout alternative. Curb & Gutter, drainage, sidewalks, and street lights will be part of the proposed improvements. The intersection improvements will provide geometric and congestion relief. | NULL | American Engineers, Inc | December, 2022 | December, 2020 | December, 2022 | NULL | Sales Tax | $775,200 | $35,000 | $740,200 | Green | Green | Active | roussan.francois@fultoncountyga.gov | 2017 | 2023-03-05 00:45:19 | NULL | NULL | NULL | |
| CSF- 66 | OSI 613 | Old Fairburn Road @ Union Road | Tier 1 | Operation and Safety Improvements | TSPLOST | City of South Fulton | Design | Improvements will include the addition of a circular roundabout to address congestion and reduce the severity of accidents at this intersection. Additional improvements include drainage, curb & gutter, streetlights, and 5' wide sidewalks. Due to the proximity, this project will be delivered as a single construction project along with OSI 615 Stonewall Tell Road @ Union Road. | NULL | American Engineers, Inc | March, 2023 | December, 2020 | July, 2025 | NULL | Sales Tax | $1,464,000 | $38,399 | $1,425,601 | Green | Green | Active | roussan.francois@fultoncountyga.gov | 2017 | 2023-03-05 00:46:59 | NULL | NULL | NULL | |
| SUM = 1,336,287,302 | SUM = 142,586,760,300 | SUM = -141,250,472,998 |