TSPLOSTProjects

Project ID Local ID Project Name Title Tier Project Type Initiatve Type City Current Stage Project Description Construction Firm Selected Design Firm Selected Estimated Design Completion Date Estimated Start Date For Project Estimated Construction Completion Date Estimated Substantial Completion Date Link To External Website Primary Funding Source TSPLOST Budget ($) TSPLOST Dollars Spent ($) TSPLOST Dollars Committed (not spent) ($) Cost Status Schedule Status Status Editor Project Year Last Update State Address Creation Date
CSF- 49 RS 404 Woodland Estates Tier 1 Maintenance and Safety Enhancements TSPLOST City of South Fulton Completed The roads (Commonwood Place, Keels Lane, Smoke Ridge Drive II, Springtree Court, Squirrel Way, and Woody Path Lane) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled. CWM Not Applicable Not Applicable NULL May, 2019 NULL Sales Tax $210,714 $129,044 $81,670 Green Green Active roussan.francois@fultoncountyga.gov 2018 2021-05-03 20:29:35 NULL NULL NULL
CSF- 5 RC 104 Creel Road (Old National Hwy to West Rd) Tier 1 Maintenance and Safety Enhancements TSPLOST City of South Fulton Completed The Creel Road (Old National Hwy to West Rd) to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled. NULL Not Applicable Not Applicable March, 2019 August, 2019 NULL Sales Tax $295,100 $283,472 $11,628 Green Green Active roussan.francois@fultoncountyga.gov 2019 2021-05-03 16:11:47 NULL NULL NULL
CSF- 50 RS 405 Woodward Estates Tier 1 Maintenance and Safety Enhancements TSPLOST City of South Fulton Completed The roads (Amethist Court, Garnett Way, Mica Trace, Old Rocky Road, Rockway Road, Rocky Court, Topaz Trail, Turquoise Trail, and Woodward Road) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled. CWM Not Applicable Not Applicable NULL June, 2019 NULL Sales Tax $469,318 $294,440 $174,878 Green Green Active roussan.francois@fultoncountyga.gov 2018 2021-05-03 20:29:52 NULL NULL NULL
CSF- 51 B 500 Butner Road over Camp Creek Tier 1 Bridges TSPLOST City of South Fulton Design The proposed Butner Road over Camp Creek includes improvements to the bridge that will extend to the Camp Creek Parkway edge of pavement on the south leg of the intersection. A new bridge is proposed to replace the existing near the Butner Road/Camp Creek Parkway intersection. The proposed bridge will be wide enough to accommodate two traffic lanes of 24-ft wide, 30'' curb and gutter and 12-ft wide pedestrian sidewalk on the west side to tie into a proposed multi-use trail off the bridge and 6-ft wide sidewalk on the east side. A turning lane will be designed off the bridge to finish free flow and stacking length up to the intersection with Camp Creek Parkway. NULL William-Russell & Johnson December, 2022 April, 2020 September, 2024 NULL Sales Tax $1,600,000 $61,911 $1,538,089 Green Green Active roussan.francois@fultoncountyga.gov 2019 2023-03-05 00:19:21 NULL NULL NULL
CSF- 52 RST 200 Camp Creek Village (SFR), (LL 73 Dist 14FF) Tier 1 Maintenance and Safety Enhancements TSPLOST City of South Fulton Completed The primary work is to resurface the final asphalt topping layer. The roads (Zultana and zoya) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work includes all necessary preparation work (e.g., full depth patching and a single surface treatment). The roads will then have the final asphalt topping layer installed in a manner that will provide uniformity of the asphalt. Milling of the existing asphalt surface is not expected to be required for these roadways. E R Snell Not Applicable Not Applicable March, 2018 August, 2018 Not Applicable Sales Tax $44,140 $49,491 $-5,351 Red Green Active roussan.francois@fultoncountyga.gov 2017 2021-05-03 20:30:27 NULL NULL NULL
CSF- 53 B 501 Enon Road over Camp Creek Tributary (Timber Bridge) Tier 1 Bridges TSPLOST City of South Fulton Design The proposed project will replace the existing culvert located on Enon Road between Enon Mill Drive and Enon Pines Drive. The deteriorated timber culvert will be removed and replaced with a structure to carry two 12-foot travel lanes and 8-foot shoulders, which include 6-foot sidewalks. NULL AEI February, 2022 December, 2022 February, 2024 NULL Sales Tax $600,000 $87,454 $512,546 Green Green Active roussan.francois@fultoncountyga.gov 2020 2023-03-05 00:22:05 NULL NULL NULL
CSF- 54 B 502 Bethsaida over Morning Creek Tier 2 Bridges TSPLOST City of South Fulton Planning Bridge replacement to be analyzed for a better rating capacity and alleviate congestion. NULL NULL NULL NULL NULL NULL Sales Tax $1,500,000 $0 $1,500,000 Gray Gray Active roussan.francois@fultoncountyga.gov NULL 2023-03-05 00:23:02 NULL NULL NULL
CSF- 55 OSI 601 Butner Road @ Camp Creek Parkway Tier 1 Operation and Safety Improvements TSPLOST City of South Fulton Design The proposed Butner Road project is a capacity project that begins at the intersection of Camp Creek Parkway and extends approximately 1,000 feet to the north along Butner Road. It consists of widening the existing Butner Road by adding left and right-turn lanes, providing a nature trail at-grade crossing and updating the intersection signalization and guardrails, as a safety measure, on the east side of Butner Road to Merk Road. The travel lanes will be minimum 11 foot-wide with 2-foot stamped concrete and 12-foot trail on the east side. This project also includes signal upgrade and installation of new decorative mast arms. NULL American Engineers, Inc December, 2022 August, 2020 January, 2025 NULL Sales Tax $3,174,000 $16,250 $3,157,750 Green Green Active roussan.francois@fultoncountyga.gov 2017 2023-03-05 00:26:37 NULL NULL NULL
CSF- 56 OSI 602 Butner Road @ Union Road Tier 1 Operation and Safety Improvements TSPLOST City of South Fulton Design Intersection improvements will include the use of an oval roundabout or circular roundabout. A traffic report concluded that a roundabout is the best alternative to handle the traffic congestion at this intersection. Additional improvements include drainage, curb & gutter, street lights, and sidewalks. NULL American Engineers, Inc December, 2022 December, 2019 August, 2024 NULL https://performance.fultoncountyga.gov/stories/s/v555-6sca Sales Tax $1,986,000 $241,500 $1,744,500 Green Green Active roussan.francois@fultoncountyga.gov 2017 2023-03-05 00:28:01 NULL NULL NULL
CSF- 57 OSI 603 Butner Road @ Pittman Road Tier 1 Operation and Safety Improvements TSPLOST City of South Fulton Design The proposed project will improve traffic safety by realigning the approach of PIttman Road to eliminate an extreme angle of incidence at the intersection. Additional improvements include curb & gutter, drainage, sidewalks, and streetlights NULL AEI May, 2023 December, 2020 December, 2024 NULL Sales Tax $1,412,000 $73,234 $1,338,766 Green Green Active roussan.francois@fultoncountyga.gov 2020 2023-03-05 00:30:11 NULL NULL NULL
CSF- 58 OSI 604 Campbellton Road @ Stonewall Tell Road (Project Design on Hold) Tier 1 Operation and Safety Improvements TSPLOST City of South Fulton Construction Intersection will be analyzed for traffic improvements including a roundabout alternative. Curb & Gutter, drainage, sidewalks, and street lights will be part of the proposed improvements. The intersection improvements will provide geometric and congestion relief. CMC, INC American Engineers, Inc December, 2022 April, 2020 March, 2024 NULL Sales Tax $1,422,000 $172,932 $1,249,068 Red Green Active roussan.francois@fultoncountyga.gov 2017 2023-03-05 00:40:45 NULL NULL NULL
CSF- 59 OSI 605 Campbellton-Fairburn Road @ Jones Road (Project Design on Hold) Tier 1 Operation and Safety Improvements TSPLOST City of South Fulton Design Geometric and capacity improvements to include traditional or roundabouts NULL American Engineers, Inc August, 2018 NULL August, 2019 NULL Sales Tax $1,464,000 $0 $1,464,000 Green Green Active roussan.francois@fultoncountyga.gov NULL 2021-05-03 22:55:24 NULL NULL NULL
CSF- 6 RC 105 Enon Road (Stonewall Tell Rd to Atlanta City limits) Tier 1 Maintenance and Safety Enhancements TSPLOST City of South Fulton Completed The Enon Road (Stonewall Tell Rd to Atlanta City limits)to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled. NULL Not Applicable Not Applicable March, 2019 August, 2019 NULL Sales Tax $921,496 $752,801 $168,695 Green Green Active roussan.francois@fultoncountyga.gov 2018 2021-05-03 16:12:54 NULL NULL NULL
CSF- 60 OSI 606 Cascade-Palmetto Highway @ West Stubbs Road Tier 1 Operation and Safety Improvements TSPLOST City of South Fulton Completed The project and plans reflect the installation of a new signal at the intersection of Cascade Palmetto Highway and West Stubbs Road. In addition, it includes the installation of curb & gutter, a solar powered advanced signal warning sign, ADA ramps, and signing & marking. The existing non-signalized intersection already includes the necessary turn lanes and right of way. NULL Not Applicable Not Applicable May, 2018 November, 2018 NULL Sales Tax $1,554,000 $272,757 $1,281,243 Green Green Active roussan.francois@fultoncountyga.gov 2019 2021-05-03 22:46:16 NULL NULL NULL
CSF- 61 OSI 607 Demooney Road @ West Stubbs Road Tier 1 Operation and Safety Improvements TSPLOST City of South Fulton Design Intersection improvements will include the addition of a circular roundabout to address congestion and reduce the severity of accidents at this intersection. Additional improvements include drainage, curb & gutter, streetlights, and 5' wide sidewalks. NULL AEI May, 2023 December, 2020 November, 2024 NULL Sales Tax $1,422,000 $108,809 $1,313,191 Green Green Active roussan.francois@fultoncountyga.gov 2021 2023-03-05 00:38:41 NULL NULL NULL
CSF- 62 OSI 608 Enon Road @ Stonewall Tell Road Tier 1 Operation and Safety Improvements TSPLOST City of South Fulton Design .Intersection will be analyzed for traffic improvements including a roundabout alternative. Curb & Gutter, drainage, sidewalks, and street lights will be part of the proposed improvements. The intersection improvements will provide geometric and congestion relief. NULL AEI May, 2023 December, 2020 October, 2024 NULL Sales Tax $1,674,000 $104,310 $1,569,690 Green Green Active roussan.francois@fultoncountyga.gov 2021 2023-03-05 00:40:33 NULL NULL NULL
CSF- 63 RST 201 Chestnut Ridge @ Cedar Grove Tier 1 Maintenance and Safety Enhancements TSPLOST City of South Fulton Completed The roads (Appaloose Cove and Sorrel Drive) within the subdivision is to resurface the final asphalt topping layer. The roads within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work includes all necessary preparation work (e.g., full depth patching and a single surface treatment). The roads will then have the final asphalt topping layer installed in a manner that will provide uniformity of the asphalt. Milling of the existing asphalt surface is not expected to be required for these roadways. E R Snell Not Applicable Not Applicable March, 2018 August, 2018 Not Applicable Sales Tax $41,187 $39,476 $1,711 Green Green Active roussan.francois@fultoncountyga.gov 2017 2021-05-03 20:30:42 NULL NULL NULL
CSF- 64 OSI 609 Feldwood Road @ Morning Creek Drive Tier 1 Operation and Safety Improvements TSPLOST City of South Fulton Completed Intersection will be analyzed for traffic improvements including a roundabout alternative. Curb & Gutter, drainage, sidewalks, and street lights will be part of the proposed improvements. The intersection improvements will provide geometric and congestion relief. NULL AEI December, 2022 NULL January, 2023 NULL Sales Tax $952,800 $79,878 $872,922 Green Green Active roussan.francois@fultoncountyga.gov 2021 2023-03-05 00:42:06 NULL NULL NULL
CSF- 65 OSI 610 Feldwood Road @ Bench Mark Drive Tier 1 Operation and Safety Improvements TSPLOST City of South Fulton Completed Intersection will be analyzed for traffic improvements including a roundabout alternative. Curb & Gutter, drainage, sidewalks, and street lights will be part of the proposed improvements. The intersection improvements will provide geometric and congestion relief. NULL American Engineers, Inc December, 2022 December, 2020 December, 2022 NULL Sales Tax $775,200 $35,000 $740,200 Green Green Active roussan.francois@fultoncountyga.gov 2017 2023-03-05 00:45:19 NULL NULL NULL
CSF- 66 OSI 613 Old Fairburn Road @ Union Road Tier 1 Operation and Safety Improvements TSPLOST City of South Fulton Design Improvements will include the addition of a circular roundabout to address congestion and reduce the severity of accidents at this intersection. Additional improvements include drainage, curb & gutter, streetlights, and 5' wide sidewalks. Due to the proximity, this project will be delivered as a single construction project along with OSI 615 Stonewall Tell Road @ Union Road. NULL American Engineers, Inc March, 2023 December, 2020 July, 2025 NULL Sales Tax $1,464,000 $38,399 $1,425,601 Green Green Active roussan.francois@fultoncountyga.gov 2017 2023-03-05 00:46:59 NULL NULL NULL
SUM = 1,336,287,302 SUM = 142,586,760,300 SUM = -141,250,472,998