| Project ID | Local ID | Project Name Title | Tier | Project Type | Initiatve Type | City | Current Stage | Project Description | Construction Firm Selected | Design Firm Selected | Estimated Design Completion Date | Estimated Start Date For Project | Estimated Construction Completion Date | Estimated Substantial Completion Date | Link To External Website | Primary Funding Source | TSPLOST Budget ($) | TSPLOST Dollars Spent ($) | TSPLOST Dollars Committed (not spent) ($) | Cost Status | Schedule Status | Status | Editor | Project Year | Last Update | State | Address | Creation Date |
| ALP- 47 | C0003 | Commuter Bike Corridor | Tier 3 | Pedestrian and Bike Improvements | TSPLOST | Alpharetta | Completed | Commuter Bike Corridor | N/A | N/A | Not Applicable | Not Applicable | Not Applicable | Not Applicable | Sales Tax | $0 | $0 | $0 | NULL | NULL | Inactive | kmcdowell@alpharetta.ga.us | NULL | 2021-05-05 13:25:14 | NULL | NULL | NULL | |
| ALP- 48 | C0004 | Academy Street/Webb Bridge Road GA400 Bridge Improvements | Tier 1 | Bridges | TSPLOST | Alpharetta | Completed | This project has been combined under the GA400 Bridges project per IGA with GDOT. | N/A | N/A | Not Applicable | Not Applicable | Not Applicable | Not Applicable | Sales Tax | $0 | $0 | $0 | NULL | NULL | Inactive | kmcdowell@alpharetta.ga.us | NULL | 2021-05-03 19:29:47 | NULL | NULL | NULL | |
| ALP- 49 | C0005 | Kimball Bridge Road/GA 400 Bridge Improvements | Tier 1 | Bridges | TSPLOST | Alpharetta | Completed | This project has been combined with GA400 Bridges project, per IGA with GDOT. | N/A | N/A | Not Applicable | Not Applicable | Not Applicable | Not Applicable | Sales Tax | $0 | $0 | $0 | Gray | Gray | Inactive | imisbach@alpharetta.ga.us | NULL | 2026-05-04 15:25:23 | NULL | NULL | NULL | |
| ALP- 50 | C0006 | GA 400 Bottlenecks | Tier 1 | Congestion Relief | TSPLOST | Alpharetta | Bidding | This project has been combined with GA400 Bridges, per IGA with GDOT. | N/A | N/A | Not Applicable | Not Applicable | Not Applicable | Not Applicable | Sales Tax | $0 | $0 | $0 | Gray | Gray | Inactive | kmcdowell@alpharetta.ga.us | NULL | 2023-02-13 16:21:08 | NULL | NULL | NULL | |
| ALP- 51 | C2223 | Improved Crossing from Parking Deck to north side of Milton Ave | Tier 1 | Pedestrian Improvements | TSPLOST2 | Alpharetta | Completed | This project is for the construction of a midblock pedestrian crossing on Milton Avenue at Teasley Street, including a refuge area for pedestrians and installation of rectangular rapid flashing beacons (RRFBs). | Excellere Construction, LLC | PW | February, 2022 | October, 2022 | November, 2022 | November, 2022 | https://cleargov.com/georgia/fulton/city/alpharetta/projects/3799/mid_block-crosswalk:-parking-deck-to-north-side-of-milton-ave-(tsplost_2;-tier_1) | Sales Tax | $212,300 | $212,300 | $0 | Green | Green | Active | kmcdowell@alpharetta.ga.us | 2022 | 2024-01-09 10:39:39 | Georgia | Milton Ave | 2022-03-31 |
| ALP- 52 | C2222 | Mid-Block Crosswalk (Manning Oaks Elementary School) | Tier 1 | Pedestrian and Bike Improvements | TSPLOST2 | Alpharetta | Planning | Fulton County Schools did not support the installation of mid-block crosswalk. | TBD | TBD | Not Applicable | Not Applicable | Not Applicable | Not Applicable | TSPLOST 2 | $150,000 | $0 | $150,000 | Gray | Gray | Inactive | kmcdowell@alpharetta.ga.us | 2022 | 2023-02-17 19:35:07 | Georgia | Manning Oaks Elementary School | 2022-03-31 | |
| ALP- 53 | C2221 | Mid-Block Crosswalk (Alpharetta Elementary School) | Tier 1 | Pedestrian and Bike Improvements | TSPLOST2 | Alpharetta | Completed | This project is for the construction of a midblock pedestrian crossing on Mayfield Road at the intersection with the school entrance. The design includes installation of rectangular rapid flashing beacons (RRFBs). | Excellere Construction, LLC | PW | May, 2022 | July, 2022 | November, 2022 | August, 2022 | https://cleargov.com/georgia/fulton/city/alpharetta/projects/3797/mid_block-crosswalk:-alpharetta-elementary-school-(tsplost_2,-tier_1) | Sales Tax | $113,037 | $113,037 | $0 | Green | Green | Active | kmcdowell@alpharetta.ga.us | 2022 | 2023-07-27 09:53:53 | Georgia | Alpharetta Elementary School | 2022-03-31 |
| ALP- 54 | C2225 | Improved Pedestrian Crossings from City Center to Churches | Tier 1 | Pedestrian Improvements | TSPLOST2 | Alpharetta | Design | This proposed project would review the section of Academy Street from SR-9 to Haynes Bridge Road for improvements that would reduce vehicle speeds, improve visibility, shorten the distance to cross the street and provide pedestrian refuge areas. | TBD | Moffatt & Nichol | August, 2023 | January, 2023 | Not Applicable | Not Applicable | https://cleargov.com/georgia/fulton/city/alpharetta/projects/3801/improved-pedestrian-crossing-from-city-center-to-churches-(tsplost_2,-tier_1) | Sales Tax | $750,000 | $118,690 | $631,310 | Green | Green | Active | kmcdowell@alpharetta.ga.us | 2021 | 2024-01-09 10:36:31 | Georgia | Alpharetta City Center | 2022-03-31 |
| ALP- 55 | C2305 | Alpha Loop (Old Milton Pkwy to Northwinds Pkwy) | Tier 1 | Pedestrian and Bike Improvements | TSPLOST2 | Alpharetta | Construction | This project is for the design and construction of the Alpha Loop Trail from the existing trail adjacent to the Chelsea Walk Subdivision to the existing trail off Northwinds Parkway. The trail is 12' wide and this particular section will consist of multiple bridges and a tunnel under Westisde Parkway. | Integrated Construction & Nobility (ICAN) | January, 2022 | September, 2022 | April, 2024 | April, 2024 | https://cleargov.com/georgia/fulton/city/alpharetta/projects/3815/alpha-loop:-old-milton-pkwy-to-northwinds-(tsplost_2,-tier_1) | Sales Tax | $12,000,000 | $11,759,500 | $240,500 | Green | Green | Active | kmcdowell@alpharetta.ga.us | 2022 | 2024-01-09 10:22:36 | Georgia | Alpha Loop | 2022-03-31 | |
| ALP- 56 | C2228 | Mid-Block Crosswalk (Mid Broadwell Rd at Charlotte Dr) | Tier 1 | Pedestrian Improvements | TSPLOST2 | Alpharetta | Completed | This project is for the construction of a midblock pedestrian crossing on Mid Broadwell Road at the intersection of Charlotte Drive. It includes a refuge area for pedestrians, installation of rectangular rapid flashing beacons (RRFBs), and 6' wide sidewalk along Mid Broadwell Road with approximately 70' length to provide connection to Charlotte Drive sidewalk. | Excellere Construction, LLC | PW | February, 2022 | August, 2022 | October, 2022 | September, 2022 | https://cleargov.com/georgia/fulton/city/alpharetta/projects/3803/mid_block-crosswalk:-mid_broadwell-rd-at-charlotte-dr-(tsplost_2,-tier_1) | Sales Tax | $146,000 | $146,000 | $0 | Green | Green | Active | kmcdowell@alpharetta.ga.us | 2022 | 2024-01-09 10:34:02 | Georgia | Broadwell Rd | 2022-03-31 |
| ALP- 57 | C2227 | Mid-Block Crosswalk (Cogburn Road Park) | Tier 1 | Pedestrian Improvements | TSPLOST2 | Alpharetta | Completed | This project is for the construction of a midblock pedestrian crossing on Cogburn Road, in front of the Gatewood subdivision and Cogburn Road park. This includes a refuge area for pedestrians and installation of rectangular rapid flashing beacons (RRFBs). | Excellere Construction, LLC | PW | February, 2022 | September, 2022 | October, 2022 | October, 2022 | https://cleargov.com/georgia/fulton/city/alpharetta/projects/3802/mid_block-crosswalk:-cogburn-rd-park-(tsplost_2,-tier_1) | Sales Tax | $149,401 | $149,391 | $10 | Green | Green | Active | kmcdowell@alpharetta.ga.us | 2022 | 2023-02-13 16:22:15 | Georgia | Cogburn Road Park | 2022-03-31 |
| ALP- 58 | C2224 | Raised intersection at Marietta St and Roswell St | Tier 1 | Operation and Safety Improvements | TSPLOST2 | Alpharetta | Design | This is for safety improvements on Roswell Street between Old Roswell Street and Old Milton Pkwy. Some of the main elements included in this project are: wide sidewalk and pedestrian light poles on the east side of Roswell Street, and safety improvements at the intersection of Roswell Street and Marietta Street (4-way STOP controlled). | TBD | Moffatt & Nichol | January, 2024 | September, 2022 | Not Applicable | Not Applicable | https://cleargov.com/georgia/fulton/city/alpharetta/projects/3800/pedestrian-safety-improvements:-marietta-st-and-roswell-st-(tsplost_2,-tier_1) | Sales Tax | $350,000 | $350,000 | $0 | Green | Green | Active | kmcdowell@alpharetta.ga.us | 2022 | 2025-07-15 14:22:02 | Georgia | Marietta St | 2022-03-31 |
| ALP- 59 | C2226 | 4 Pedestrian Bridges (Windward Pkwy over Big Creek; Greenway access | Tier 1 | Pedestrian and Bike Improvements | TSPLOST2 | Alpharetta | Construction | This is for the design and construction of 4 pedestrian bridges over Big Creek and Big Creek Tributary along Windward Parkway. The pedestrian bridges will provide connections between the existing sidewalks, facilitating pedestrian movement and crossing over the Creeks. Four bridges are with the following general specifications: 1. Two pedestrian bridges over Big Creek between Union Hill Road and Clubhouse Drive. It consists of an 8' pedestrian bridge (6' clear width) on the north side of Windward Parkway; and another same type of bridge with an additional 10' multi-use trail on the south side of Windward Parkway to connect the existing sidewalk to Big Creek Greenway. 2. Two 8' pedestrian bridges (6' clear width) over Big Creek Tributary between Clubhouse Drive and Admiral Crossing on both sides of Windward Parkway. | Vertical Earth | Moffatt & Nichol | April, 2024 | September, 2024 | NULL | February, 2026 | https://cleargov.com/georgia/fulton/city/alpharetta/projects/3817/four-pedestrian-bridges-along-windward-pkwy-over-big-creek-greenway-(tsplost_2,-tier_1) | Sales Tax | $4,000,000 | $3,774,500 | $225,500 | Green | Green | Active | imisbach@alpharetta.ga.us | 2022 | 2026-02-18 13:13:38 | Georgia | Windward Pkwy | 2022-03-31 |
| ALP- 60 | C2107 | North Point Pkwy Corridor | Tier 1 | Pedestrian and Bike Improvements | TSPLOST2 | Alpharetta | Design | This is to improve the safety, accessibility, and walkability of pedestrians along the North Point Parkway corridor from Mansell Road to Haynes Bridge Road. Some of the major elements that are considered in this project include reducing the number of travel lanes from 6 to 4 (both sides), 10' curb planter median bioswales, 12' multi-use trail, and 10' planting strip on both sides of the roadway. Also, energy efficient lighting, roadway condition monitoring, and green infrastructure monitoring systems are considered for this project. | TBD | Columbia Engineering | September, 2025 | November, 2022 | Not Applicable | Not Applicable | https://cleargov.com/georgia/fulton/city/alpharetta/projects/3818/north-point-pkwy-corridor-(tsplost_2,-tier_1) | Sales Tax | $13,250,000 | $2,738,300 | $10,511,700 | Green | Green | Active | kmcdowell@alpharetta.ga.us | 2021 | 2024-01-09 10:19:35 | Georgia | North Point Pkwy | 2022-03-31 |
| ALP- 61 | C2040 | Tradewinds Ripple Effect Improvements | Tier 1 | Operation and Safety Improvements | TSPLOST2 | Alpharetta | Planning | This project includes the design of a series of traffic improvements at multiple intersections due to GA 400 Express Lanes and Tradewinds Parkway access point. Some of the major improvements include dual southbound left turn lanes at the intersection of Westside Parkway and Webb Bridge Road, a roundabout at the intersection of Westside Parkway and Tradewinds Parkway, a traffic signal at the intersection of North Point Parkway and Tradewinds Parkway, and closing roadway median on North Point Parkway at the intersection with Morris Road. | TBD | TBD | Not Applicable | February, 2024 | Not Applicable | Not Applicable | https://cleargov.com/georgia/fulton/city/alpharetta/projects/3805/tradewinds-ripple-effect-improvements-(tsplost_2,-tier_1) | Sales Tax | $432,815 | $10,715 | $422,100 | Green | Green | Active | kmcdowell@alpharetta.ga.us | 2020 | 2024-01-09 10:33:11 | Georgia | Tradewinds | 2022-03-31 |
| ALP- 62 | C2230 | Cumming St Corridor Improvements | Tier 1 | Operation and Safety Improvements | TSPLOST2 | Alpharetta | Design | The project consists of design and construction of pedestrian and bike safety improvements along Cumming Street, between Highway 9 and Westside Parkway. The proposed project would add a sidewalk on the south side of Cumming Street: 1) from Cricket Lane to Clairmonte Ave, and 2) from where the sidewalk stops on the east side of Henderson Pkwy to Westside Pkwy. | Sol Construction LLC | Moffatt & Nichol | March, 2025 | July, 2022 | Not Applicable | August, 2026 | https://cleargov.com/georgia/fulton/city/alpharetta/projects/3806/cumming-st-corridor-improvements-(tsplost_2,-tier_1) | Sales Tax | $7,758,000 | $4,562,000 | $3,196,000 | Green | Green | Active | imisbach@alpharetta.ga.us | 2022 | 2026-05-04 15:12:59 | Georgia | Cumming St | 2022-03-31 |
| ALP- 63 | C2003 | Milton Ave Improvements (cost is an allocation) | Tier 2 | Operation and Safety Improvements | TSPLOST2 | Alpharetta | Design | This 400-foot roadway improvement will provide operational enhancements as well as bicycle and pedestrian accommodation along Milton Avenue between Old Roswell Street and Roswell Street. This project complements improvements being implemented on the north side of Milton Avenue by the Private Developer. Improvements include correcting excessive cross slope and widening the sidewalk along the south side of the road. Reconfiguring much of the south side parking to parallel parking on paver material, and modifying drainage as needed to accommodate the new configuration. Lighting with hanging baskets and new trees in tree wells are also being proposed. This project will also incorporate utility relocations. Since this project is a Tier 2 Project in the TSPLSOT Program, projects in Tier 1 are accomplished first prior to moving onto Tier 2 or 3 projects, unless there is a re-allocation of funds or revenue collected permits moving onto the other tiers. | TBD | TBD | Not Applicable | Not Applicable | Not Applicable | Not Applicable | https://cleargov.com/georgia/fulton/city/alpharetta/projects/3809/milton-ave-streetscape-(tsplost_2,-tier_2) | Sales Tax | $3,935,740 | $0 | $3,935,740 | Green | Green | Active | kmcdowell@alpharetta.ga.us | 2022 | 2024-01-09 10:29:06 | Georgia | Milton Ave | 2022-03-31 |
| ALP- 64 | C2002 | Academy St Improvements | Tier 2 | Operation and Safety Improvements | TSPLOST2 | Alpharetta | Planning | This project is for construction of a series of improvements on Academy Street with the following elements: 6' wide sidewalk on the north side of Academy Street from Loxford Lane to Fire Station 81; inclusion of left turn lanes between Loxford Lane and Wedgewood Drive where possible; inclusion of landscape medians between Loxford Lane and Wedgewood Drive where possible; creation of bike lanes on both sides of Academy Street; Addition of pedestrian lighting along the north side of Academy Street from the driveway of Alpharetta Presbyterian to Fire Station 81; and installation of an emergency traffic signal on Academy Street at Fire Station 81. Design work has been completed. Since this project is a Tier 2 Project in the TSPLSOT Program, projects in Tier 1 are accomplished first prior to moving onto Tier 2 or 3 projects, unless there is a re-allocation of funds or revenue collected permits moving onto the other tiers. | TBD | September, 2022 | Not Applicable | Not Applicable | Not Applicable | https://cleargov.com/georgia/fulton/city/alpharetta/projects/3808/academy-st-improvements-(tsplost_2,-tier_2) | Sales Tax | $3,250,000 | $0 | $3,250,000 | Green | Green | Active | kmcdowell@alpharetta.ga.us | 2022 | 2024-01-09 10:29:51 | Georgia | Academy St | 2022-03-31 | |
| ALP- 65 | C3002 | Roundabout (Mayfield Rd at Canton St) | Tier 3 | Operation and Safety Improvements | TSPLOST2 | Alpharetta | Planning | This project is to perform necessary studies, evaluations, and analysis for replacement of the existing traffic signal at the intersection of Mayfield Road at Canton Street with a single-lane roundabout. Improved traffic flow and safety benefits are potential advantages of a roundabout compared to the existing traffic signal at this location. Since this project is a Tier 3 Project in the TSPLSOT Program, projects in Tier 1 are accomplished first prior to moving onto Tier 2 or 3 projects, unless there is a re-allocation of funds or revenue collected permits moving onto the other tiers. | TBD | TBD | Not Applicable | Not Applicable | Not Applicable | Not Applicable | https://cleargov.com/georgia/fulton/city/alpharetta/projects/3811/roundabout:-mayfield-rd-at-canton-st-(tsplost_2,-tier_3) | Sales Tax | $2,000,000 | $0 | $2,000,000 | Gray | Gray | Active | kmcdowell@alpharetta.ga.us | 2022 | 2024-01-09 10:26:34 | Georgia | Mayfield Rd at Canton St | 2022-03-31 |
| ALP- 66 | C3001 | Roundabout (Hopewell Rd at Vaughan Dr) | Tier 3 | Operation and Safety Improvements | TSPLOST2 | Alpharetta | Design | Design of a roundabout at the intersection of Hopewell Road and Vaughan Drive was funded in FY 2020 and is complete. The roundabout would serve to assist in the following: denote one is entering into Alpharetta; aid in slowing traffic entering into the Downtown area; and assist in turning onto/off of Vaughan Drive. Since this project is a Tier 3 Project in the TSPLSOT Program, projects in Tier 1 are accomplished first prior to moving onto Tier 2 or 3 projects, unless there is a re-allocation of funds or revenue collected permits moving onto the other tiers. | TBD | March, 2022 | March, 2022 | Not Applicable | Not Applicable | https://cleargov.com/georgia/fulton/city/alpharetta/projects/3810/roundabout:-hopewell-rd-at-vaughan-dr-(tsplost_2,-tier_3) | Sales Tax | $1,500,000 | $0 | $1,500,000 | Green | Green | Active | kmcdowell@alpharetta.ga.us | 2022 | 2024-01-09 10:27:40 | Georgia | Hopewell Rd at Vaughan Dr | 2022-03-31 | |
| SUM = 1,336,287,302 | SUM = 142,586,760,300 | SUM = -141,250,472,998 |