| Project ID | Local ID | Project Name Title | Tier | Project Type | Initiatve Type | City | Current Stage | Project Description | Construction Firm Selected | Design Firm Selected | Estimated Design Completion Date | Estimated Start Date For Project | Estimated Construction Completion Date | Estimated Substantial Completion Date | Link To External Website | Primary Funding Source | TSPLOST Budget ($) | TSPLOST Dollars Spent ($) | TSPLOST Dollars Committed (not spent) ($) | Cost Status | Schedule Status | Status | Editor | Project Year | Last Update | State | Address | Creation Date |
| CSF- 3 | RC 102 | Cascade Road (Fulton Ind Blvd to Beechcrest Road SW) | Tier 1 | Maintenance and Safety Enhancements | TSPLOST | City of South Fulton | Completed | The Cascade Road (Fulton Ind Blvd to Beechcrest Road SW) to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled. | CW Matthews | Not Applicable | Not Applicable | NULL | November, 2018 | NULL | Sales Tax | $1,356,984 | $1,336,163 | $20,821 | Green | Green | Active | roussan.francois@fultoncountyga.gov | 2018 | 2021-05-03 16:08:49 | NULL | NULL | NULL | |
| CSF- 30 | RS 386 | Sherbrook Forest | Tier 1 | Maintenance and Safety Enhancements | TSPLOST | City of South Fulton | Completed | The roads (Sherbrook Court and Sherbrook Drive) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled. | NULL | Not Applicable | Not Applicable | NULL | July, 2021 | NULL | Sales Tax | $72,792 | $137,122 | $-64,330 | Green | Green | Active | roussan.francois@fultoncountyga.gov | 2021 | 2021-10-12 19:02:15 | NULL | NULL | NULL | |
| CSF- 300 | T 271 | Fairburn Road | Tier 1 | Pedestrian and Bike Improvements | TSPLOST2 | City of South Fulton | Construction | The project is located on Fairburn Road, starting at Cascade Road and continuing to North Utoy Creek. The typical section includes 12' travel lanes, curb and gutter, a 10-foot multi-use path on the West side and a 6-foot wide sidewalk behind a 2-foot stamped concrete strip on the east side of Fairburn Road. Improvements also include bridge replacements at North and South Utoy Creek with bottomless culverts and turning lane improvements at the Fairburn Road/Cascade Road intersection. Also included as part of CSF-349 | NULL | Qk4 | November, 2022 | March, 2023 | December, 2026 | December, 2026 | Sales Tax | $7,142,452 | $1,349,760 | $5,792,692 | NULL | NULL | Active | roussan.francois@cityofsouthfultonga.gov | 2023 | 2026-09-17 10:39:06 | Georgia | Fairburn Road | 2022-03-31 | |
| CSF- 301 | P 903 | Cascade Road | Tier 1 | Pedestrian and Bike Improvements | TSPLOST2 | City of South Fulton | Design | This design project will build up to 3.8 mi. of sidewalk facilities where needed along both sides of Cascade from the Atlanta City Limits to Fulton Industrial Blvd. An Audit was done to determine which locations need this work performed. This project also adds storm drainage facilities. The typical section includes a 2-ft. stamped concrete beauty strip and a 2.5-ft. curb and gutter. | NULL | NULL | March, 2029 | March, 2029 | June, 2027 | June, 2027 | Sales Tax | $581,035 | $261,979 | $319,056 | NULL | NULL | Active | roussan.francois@cityofsouthfultonga.gov | 2026 | 2026-09-17 10:30:07 | Georgia | Cascade Road | 2022-03-31 | |
| CSF- 302 | P 908 | Flat Shoals Road | Tier 1 | Pedestrian and Bike Improvements | TSPLOST2 | City of South Fulton | Design | This design project will build up to 2.5 mi. of sidewalk facilities where needed along both sides of Flat Shoals from Buffington Road to Old National Highway. An Audit was done to determine which locations need this work performed. This project also adds storm drainage facilities. The typical section includes a 2-ft. stamped concrete beauty strip and a 2.5-ft. curb and gutter. | NULL | NULL | November, 2028 | September, 2024 | March, 2029 | March, 2029 | Sales Tax | $536,925 | $158,167 | $378,758 | NULL | NULL | Active | roussan.francois@cityofsouthfultonga.gov | 2027 | 2026-09-17 10:27:16 | Georgia | Flat Shoals Road | 2022-03-31 | |
| CSF- 303 | P 910 | Jerome Road | Tier 1 | Pedestrian and Bike Improvements | TSPLOST2 | City of South Fulton | Design | This design project will fill in sidewalk gaps within the existing sidewalk network on 0.8 mi Jerome between Old National Highway and Old Bill Cook Road. This project also adds storm drainage facilities. The typical section includes a 2-ft. stamped concrete beauty strip and a 2.5-ft. curb and gutter. | NULL | NULL | August, 2028 | August, 2025 | December, 2029 | December, 2029 | Sales Tax | $207,540 | $78,433 | $129,107 | NULL | NULL | Active | roussan.francois@cityofsouthfultonga.gov | 2025 | 2026-09-17 10:24:45 | Georgia | Jerome Road | 2022-03-31 | |
| CSF- 304 | P 914 | Union Road | Tier 1 | Pedestrian and Bike Improvements | TSPLOST2 | City of South Fulton | Design | This project will fill in sidewalk gaps within the existing 1.15 mi. sidewalk network. Owl Rock Road to Bunting Lane. The project will add 6-ft sidewalks, 2 ft. stamped concrete buffer, 2.5 ft. curb and gutter and drainage facilities throughout as needed. Pedestrian scale streetlights will be considered during project construction. | NULL | Khafra | August, 2027 | April, 2024 | June, 2029 | June, 2029 | Sales Tax | $305,617 | $0 | $305,617 | NULL | NULL | Active | roussan.francois@cityofsouthfultonga.gov | 2024 | 2026-09-17 10:22:09 | Georgia | Union Road | 2022-03-31 | |
| CSF- 305 | P 911 | Merk Road | Tier 1 | Pedestrian and Bike Improvements | TSPLOST2 | City of South Fulton | Design | This design project will build up .75 mi. of sidewalk facilities where needed along both sides of Merk Rd. from Sanford J Jones to Miles Rd. It also adds storm drainage facilities. The typical section includes a 2.5-ft. curb and gutter, and a 2-ft. stamped concrete beauty strip. There will be 6 ft. and 8 ft. wide sidewalks. Streetlights will be installed throughout the length of the project. | NULL | STV - AEI | March, 2027 | July, 2025 | June, 2028 | June, 2028 | Sales Tax | $246,059 | $39,101 | $206,958 | NULL | NULL | Active | roussan.francois@cityofsouthfultonga.gov | 2026 | 2026-09-17 10:19:08 | Georgia | Merk Road | 2022-03-31 | |
| CSF- 306 | P 909 | Fulton Industrial Area | Tier 1 | Pedestrian and Bike Improvements | TSPLOST2 | City of South Fulton | Planning | Sidewalk Gaps Various Locations in Fulton Industrial Blvd District | NULL | NULL | April, 2024 | April, 2024 | November, 2024 | November, 2024 | Sales Tax | $1,000,000 | $0 | $1,000,000 | NULL | NULL | Active | jeff.mueller@cityofsouthfultonga.gov | 2024 | 2023-03-02 21:37:07 | Georgia | Fulton Industrial Area | 2022-03-31 | |
| CSF- 307 | P 906 | Welcome All Road | Tier 1 | Pedestrian and Bike Improvements | TSPLOST2 | City of South Fulton | Planning | Multi-Use Trail Roosevelt Highway to Will Lee Road | NULL | NULL | August, 2024 | September, 2025 | September, 2026 | September, 2026 | Sales Tax | $2,940,000 | $0 | $2,940,000 | NULL | NULL | Active | jeff.mueller@cityofsouthfultonga.gov | 2025 | 2023-03-02 21:50:01 | Georgia | Welcome All Road | 2022-03-31 | |
| CSF- 308 | NULL | Harris Rd | Tier 2 | Bridges | TSPLOST2 | City of South Fulton | Planning | NULL | NULL | NULL | NULL | NULL | NULL | NULL | Sales Tax | NULL | NULL | $0 | NULL | NULL | Active | NULL | NULL | NULL | Georgia | Harris Rd | 2022-03-31 | |
| CSF- 309 | NULL | Bethsaida Road | Tier 2 | Operation and Safety Improvements | TSPLOST2 | City of South Fulton | Planning | NULL | NULL | NULL | NULL | NULL | NULL | NULL | Sales Tax | NULL | NULL | $0 | NULL | NULL | Active | NULL | NULL | NULL | Georgia | Bethsaida Road | 2022-03-31 | |
| CSF- 31 | RC 111 | Merk Road (Butner Rd to Union Rd) | Tier 2 | Maintenance and Safety Enhancements | TSPLOST | City of South Fulton | Completed | The Merk Road (Butner Rd to Union Rd) to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled. | NULL | Not Applicable | NULL | June, 2021 | November, 2021 | NULL | Sales Tax | $622,536 | $268,577 | $353,959 | Green | Gray | Active | roussan.francois@cityofsouthfultonga.gov | 2021 | 2026-09-22 09:59:23 | NULL | NULL | NULL | |
| CSF- 310 | NULL | City Wide | Tier 1 | Quick Response Projects | TSPLOST2 | City of South Fulton | Planning | NULL | NULL | NULL | NULL | NULL | NULL | NULL | Sales Tax | NULL | NULL | $0 | NULL | NULL | Active | NULL | NULL | NULL | Georgia | City of South Fulton | 2022-03-31 | |
| CSF- 311 | NULL | Campbellton Road | Tier 2 | Operation and Safety Improvements | TSPLOST2 | City of South Fulton | Planning | NULL | NULL | NULL | NULL | NULL | NULL | NULL | Sales Tax | NULL | NULL | $0 | NULL | NULL | Active | NULL | NULL | NULL | Georgia | Campbellton Road | 2022-03-31 | |
| CSF- 312 | NULL | Cascade Palmetto Highway | Tier 2 | Operation and Safety Improvements | TSPLOST2 | City of South Fulton | Planning | NULL | NULL | NULL | NULL | NULL | NULL | NULL | Sales Tax | NULL | NULL | $0 | NULL | NULL | Active | NULL | NULL | NULL | Georgia | Cascade Palmetto Highway | 2022-03-31 | |
| CSF- 313 | NULL | Enon Road | Tier 2 | Operation and Safety Improvements | TSPLOST2 | City of South Fulton | Planning | NULL | NULL | NULL | NULL | NULL | NULL | NULL | Sales Tax | NULL | NULL | $0 | NULL | NULL | Active | NULL | NULL | NULL | Georgia | Enon Road | 2022-03-31 | |
| CSF- 314 | NULL | Intersection Improvements | Tier 2 | Operation and Safety Improvements | TSPLOST2 | City of South Fulton | Planning | NULL | NULL | NULL | NULL | NULL | NULL | NULL | Sales Tax | NULL | NULL | $0 | NULL | NULL | Active | NULL | NULL | NULL | Georgia | City of South Fulton | 2022-03-31 | |
| CSF- 315 | NULL | Scarborough Road | Tier 2 | Pedestrian and Bike Improvements | TSPLOST2 | City of South Fulton | Planning | NULL | NULL | NULL | NULL | NULL | NULL | NULL | Sales Tax | NULL | NULL | $0 | NULL | NULL | Active | NULL | NULL | NULL | Georgia | Scarborough Road | 2022-03-31 | |
| CSF- 316 | NULL | South Fulton Parkway | Tier 2 | Operation and Safety Improvements | TSPLOST2 | City of South Fulton | Planning | NULL | NULL | NULL | NULL | NULL | NULL | NULL | Sales Tax | NULL | NULL | $0 | NULL | NULL | Active | NULL | NULL | NULL | Georgia | South Fulton Parkway | 2022-03-31 | |
| SUM = 1,354,206,592 | SUM = 717,806,831 | SUM = 636,399,761 |