| Project ID | Local ID | Project Name Title | Tier | Project Type | Initiatve Type | City | Current Stage | Project Description | Construction Firm Selected | Design Firm Selected | Estimated Design Completion Date | Estimated Start Date For Project | Estimated Construction Completion Date | Estimated Substantial Completion Date | Link To External Website | Primary Funding Source | TSPLOST Budget ($) | TSPLOST Dollars Spent ($) | TSPLOST Dollars Committed (not spent) ($) | Cost Status | Schedule Status | Status | Editor | Project Year | Last Update | State | Address | Creation Date |
| CSF- 63 | RST 201 | Chestnut Ridge @ Cedar Grove | Tier 1 | Maintenance and Safety Enhancements | TSPLOST | City of South Fulton | Completed | The roads (Appaloose Cove and Sorrel Drive) within the subdivision is to resurface the final asphalt topping layer. The roads within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work includes all necessary preparation work (e.g., full depth patching and a single surface treatment). The roads will then have the final asphalt topping layer installed in a manner that will provide uniformity of the asphalt. Milling of the existing asphalt surface is not expected to be required for these roadways. | E R Snell | Not Applicable | Not Applicable | March, 2018 | August, 2018 | Not Applicable | Sales Tax | $41,187 | $39,476 | $1,711 | Green | Green | Active | roussan.francois@fultoncountyga.gov | 2017 | 2021-05-03 20:30:42 | NULL | NULL | NULL | |
| CSF- 64 | OSI 609 | Feldwood Road @ Morning Creek Drive | Tier 1 | Operation and Safety Improvements | TSPLOST | City of South Fulton | Completed | Intersection will be analyzed for traffic improvements including a roundabout alternative. Curb & Gutter, drainage, sidewalks, and street lights will be part of the proposed improvements. The intersection improvements will provide geometric and congestion relief. | NULL | AEI | December, 2022 | NULL | January, 2023 | NULL | Sales Tax | $952,800 | $79,878 | $872,922 | Green | Green | Active | roussan.francois@fultoncountyga.gov | 2021 | 2023-03-05 00:42:06 | NULL | NULL | NULL | |
| CSF- 65 | OSI 610 | Feldwood Road @ Bench Mark Drive | Tier 1 | Operation and Safety Improvements | TSPLOST | City of South Fulton | Completed | Intersection will be analyzed for traffic improvements including a roundabout alternative. Curb & Gutter, drainage, sidewalks, and street lights will be part of the proposed improvements. The intersection improvements will provide geometric and congestion relief. | NULL | American Engineers, Inc | December, 2022 | December, 2020 | December, 2022 | NULL | Sales Tax | $775,200 | $35,000 | $740,200 | Green | Green | Active | roussan.francois@fultoncountyga.gov | 2017 | 2023-03-05 00:45:19 | NULL | NULL | NULL | |
| CSF- 66 | OSI 613/615 | Old Fairburn Road @ Union Road | Tier 1 | Operation and Safety Improvements | TSPLOST | City of South Fulton | Construction | The current construction project will include the addition of two circular roundabouts to address congestion and reduce the severity of accidents at this intersection. Additional improvements include drainage, 24-inch curb & gutter, 24-inch stamp concrete beauty strip, streetlights, and 5' wide sidewalks. The extent of the project will extend approximately 500 feet each route direction from each roundabout. The roundabouts are approximately 900 feet apart. A 400 ft’ section of Old Fairburn Road will be removed as part of the realignment. Due to the proximity, this project is being delivered as a single construction project along with OSI 615 Stonewall Tell Road @ Union Road. Streetlights will also be added within the project limits | NULL | American Engineers, Inc | March, 2023 | December, 2020 | May, 2027 | May, 2027 | Sales Tax | $4,279,207 | $1,446,683 | $2,832,524 | Green | Green | Active | roussan.francois@cityofsouthfultonga.gov | 2017 | 2026-09-18 12:26:22 | NULL | NULL | NULL | |
| CSF- 67 | OSI 614 | Rivertown Road @ Cedar Grove Road | Tier 1 | Operation and Safety Improvements | TSPLOST | City of South Fulton | Completed | This construction project at Rivertown Road and Cedar Grove Road will build a single-lane roundabout to address a sharp angle intersection skew, congestion, and reduce the severity of accidents at this intersection. Additional improvements with this project include improving storm drainage with a typical section consisting of a 2-ft. curb & gutter, 2-ft. stamped concrete beauty strip, and 5-ft. wide sidewalks throughout the project limits. The extent of construction is approximately 1250 ft. along Rivertown Road and 600 ft. along Cedar Grove Road. Streetlights will also be added within the project limits. | NULL | American Engineers, Inc | December, 2023 | July, 2024 | June, 2025 | June, 2025 | https://performance.fultoncountyga.gov/stories/s/f85b-5vnc | Sales Tax | $2,806,821 | $2,555,621 | $251,200 | Green | Green | Active | roussan.francois@cityofsouthfultonga.gov | 2017 | 2026-09-18 12:29:20 | NULL | NULL | NULL |
| CSF- 68 | OSI 615 | Stonewall Tell Road @ Union Road | Tier 1 | Operation and Safety Improvements | TSPLOST | City of South Fulton | Design | Improvements will include the addition of a circular roundabout to address congestion and reduce the severity of accidents at this intersection. Additional improvements include drainage, curb & gutter, streetlights, and 5Æ wide sidewalks. Due to the proximity, this project will be delivered as a single construction project along with OSI 613 Old Fairburn Road at Union Road. | NULL | American Engineers, Inc | March, 2023 | December, 2020 | July, 2025 | NULL | https://performance.fultoncountyga.gov/stories/s/itui-hn3h | Sales Tax | $1,488,000 | $32,049 | $1,455,951 | Green | Green | Active | roussan.francois@fultoncountyga.gov | 2017 | 2023-03-06 12:28:39 | NULL | NULL | NULL |
| CSF- 69 | OSI 616 | Stonewall Tell Road @ Jones Road/Pittman Road | Tier 1 | Operation and Safety Improvements | TSPLOST | City of South Fulton | Design | The design project at Jones Road, Stonewall tell Road and Pittman Road will include the addition of a circular single lane roundabout to address congestion and reduce the severity of accidents at this intersection. Additional improvements include drainage, with a typical section of 30-inch curb & gutter, 2-ft of stamped concrete beauty strip, and 5' wide sidewalks. Streetlights will be added during construction. | NULL | AEI | November, 2024 | December, 2020 | January, 2028 | January, 2028 | Sales Tax | $314,294 | $199,426 | $114,868 | Green | Green | Active | roussan.francois@cityofsouthfultonga.gov | 2021 | 2026-09-18 13:37:49 | NULL | NULL | NULL | |
| CSF- 7 | RC 106 | New Hope Road (Boat Rock to Cascade Rd) | Tier 1 | Maintenance and Safety Enhancements | TSPLOST | City of South Fulton | Completed | The New Hope Road (Boat Rock to Cascade Rd) to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled. | E R Snell | Not Applicable | Not Applicable | March, 2018 | August, 2018 | December, 2017 | Sales Tax | $414,358 | $453,951 | $-39,593 | Yellow | Green | Active | roussan.francois@fultoncountyga.gov | 2017 | 2021-05-03 16:14:02 | NULL | NULL | NULL | |
| CSF- 70 | OSI 617 | Welcome All Road @ Jailette Road | Tier 1 | Operation and Safety Improvements | TSPLOST | City of South Fulton | Bidding | The design project at Welcome All Road and Jailette Road will realign the Stop regulated approach of Jailette Road to improve the angle of incidence at the intersection with Welcome All. Additional improvements include drainage, with a typical section of 30-inch curb & gutter, 2-ft of stamped concrete beauty strip, and 5' wide sidewalks. Streetlights will be added during construction. | NULL | ATLAS | August, 2026 | May, 2021 | July. 2027 | NULL | Sales Tax | $95,353 | $75 | $95,278 | Green | Green | Active | roussan.francois@cityofsouthfultonga.gov | 2020 | 2026-09-22 08:44:29 | NULL | NULL | NULL | |
| CSF- 71 | OSI 618 | Welcome All Road @ Scarboro Road | Tier 1 | Operation and Safety Improvements | TSPLOST | City of South Fulton | Bidding | The design project at Welcome All Road and Scarborough Road will include the addition of a circular single lane roundabout to address congestion and reduce the severity of accidents at this intersection. Additional improvements include drainage with a typical section of 30-inch curb & gutter, streetlights, 2-ft of stamped concrete beauty strip, and 5' wide sidewalks. Streetlights will be added during construction | NULL | AEI | August, 2026 | May, 2021 | July. 2027 | July. 2027 | Sales Tax | $304,266 | $195,192 | $109,074 | Green | Green | Active | roussan.francois@cityofsouthfultonga.gov | NULL | 2026-09-22 08:46:47 | NULL | NULL | NULL | |
| CSF- 72 | RST 202 | Falls @ Camp Creek | Tier 1 | Maintenance and Safety Enhancements | TSPLOST | City of South Fulton | Completed | The primary work is to resurface the final asphalt topping layer. The road Casa Blanca Lane) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work includes all necessary preparation work (e.g., full depth patching and a single surface treatment). The roads will then have the final asphalt topping layer installed in a manner that will provide uniformity of the asphalt. Milling of the existing asphalt surface is not expected to be required for these roadways. | E R Snell | Not Applicable | Not Applicable | March, 2018 | August, 2018 | Not Applicable | Sales Tax | $50,297 | $62,067 | $-11,770 | Green | Green | Active | roussan.francois@fultoncountyga.gov | 2017 | 2021-05-03 20:30:59 | NULL | NULL | NULL | |
| CSF- 73 | OSI 619 | West Stubbs Road @ Butner Road | Tier 1 | Operation and Safety Improvements | TSPLOST | City of South Fulton | Design | The City of South Fulton is evaluating options to upgrade the intersection of West Stubbs Road at Butner Road to improve safety and capacity throughout the project corridor. It will also provide pedestrian access and safety through the intersection area. Additional improvements include a closed drainage system, 2.5-ft. curb & gutter, 2' stamped concrete, and 5 ft. sidewalks. Streetlights (overhead and pedestrian scale) will be implemented near the end of the project. | NULL | NULL | NULL | July, 2021 | NULL | NULL | Sales Tax | $47,326 | $47,326 | $0 | Green | Green | Active | roussan.francois@cityofsouthfultonga.gov | 2020 | 2026-09-22 08:56:25 | NULL | NULL | NULL | |
| CSF- 74 | OSI 620 | Aldredge Road @Merk Road | Tier 2 | Operation and Safety Improvements | TSPLOST2 | City of South Fulton | Design | improvements include three new turn lanes - a left on westbound Aldredge, and a right on eastbound Aldredge and a right on northbound Merk, a closed drainage system, 2.5-ft. curb & gutter, 2' stamped concrete, and 5 ft. sidewalks. Merk Road and Aldredge Road will be realigned to be a through street in the east-west direction and Merk Road from the south direction will be stop controlled. | NULL | NULL | February, 2027 | July, 2021 | October, 2028 | October, 2030 | Sales Tax | $207,130 | $70,283 | $136,847 | Green | Green | Active | roussan.francois@cityofsouthfultonga.gov | NULL | 2026-09-22 09:00:21 | NULL | NULL | NULL | |
| CSF- 75 | OSI 621 | Bethsaida Road @ Old National Hwy. | Tier 2 | Operation and Safety Improvements | TSPLOST | City of South Fulton | Planning | Intersection will be analyzed for traffic improvements including a roundabout alternative. Curb & Gutter, drainage, sidewalks, and street lights will be part of the proposed improvements. The intersection improvements will provide geometric and congestion relief. | NULL | NULL | NULL | July, 2021 | NULL | NULL | Sales Tax | $1,788,000 | $0 | $1,788,000 | Gray | Gray | Active | NULL | NULL | NULL | NULL | NULL | NULL | |
| CSF- 76 | OSI 622 | Butner Road @ Aldredge Road | Tier 2 | Operation and Safety Improvements | TSPLOST | City of South Fulton | Planning | Intersection will be analyzed for traffic improvements including a roundabout alternative. Curb & Gutter, drainage, sidewalks, and street lights will be part of the proposed improvements. The intersection improvements will provide geometric and congestion relief. | NULL | NULL | NULL | July, 2021 | NULL | NULL | Sales Tax | $1,434,000 | $0 | $1,434,000 | Gray | Gray | Active | NULL | NULL | NULL | NULL | NULL | NULL | |
| CSF- 77 | OSI 624 | Washington Road @ Roosevelt Highway | Tier 2 | Operation and Safety Improvements | TSPLOST | City of South Fulton | Completed | Intersection will be analyzed for traffic improvements including a roundabout alternative. Curb & Gutter, drainage, sidewalks, and street lights will be part of the proposed improvements. The intersection improvements will provide geometric and congestion relief. | NULL | NULL | NULL | July, 2021 | NULL | NULL | Sales Tax | $0 | $0 | $0 | Gray | Gray | Active | roussan.francois@cityofsouthfultonga.gov | NULL | 2026-09-22 09:07:07 | NULL | NULL | NULL | |
| CSF- 78 | OSI 625 | Welcome All Road @ Will Lee Road | Tier 2 | Operation and Safety Improvements | TSPLOST | City of South Fulton | Planning | Intersection will be analyzed for traffic improvements including a roundabout alternative. Curb & Gutter, drainage, sidewalks, and street lights will be part of the proposed improvements. The intersection improvements will provide geometric and congestion relief. | NULL | NULL | July, 2021 | NULL | NULL | NULL | Sales Tax | $0 | $0 | $0 | Gray | Gray | Active | roussan.francois@cityofsouthfultonga.gov | NULL | 2026-09-22 09:08:49 | NULL | NULL | NULL | |
| CSF- 79 | SU 700 | Flat Shoals Rd at Old National Hwy | Tier 1 | Operation and Safety Improvements | TSPLOST | City of South Fulton | Design | Traffic signal upgrades will include new mast arm poles, new cabinets, detection, signal heads, back plates, pedestrian signals, and pavement markings at the intersections. The work will include fiber communication along Flat Shoals Road from Mallory Road to Old National Highway. | NULL | Jacobs | March, 2023 | September, 2020 | July, 2024 | NULL | Sales Tax | $250,000 | $0 | $250,000 | Green | Green | Active | roussan.francois@fultoncountyga.gov | NULL | 2023-03-06 12:54:47 | NULL | NULL | NULL | |
| CSF- 8 | RC 107 | Old Bill Cook Road (Buffington Rd to Old National Hwy) | Tier 1 | Maintenance and Safety Enhancements | TSPLOST | City of South Fulton | Completed | The Old Bill Cook Road (Buffington Rd to Old National Hwy) to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled. | NULL | Not Applicable | Not Applicable | March, 2020 | August, 2020 | NULL | Sales Tax | $438,189 | $458,162 | $-19,973 | Yellow | Green | Active | roussan.francois@fultoncountyga.gov | 2019 | 2021-05-03 16:14:51 | NULL | NULL | NULL | |
| CSF- 80 | SU 701 | Flat Shoals Rd at Hemperly Rd | Tier 1 | Operation and Safety Improvements | TSPLOST | City of South Fulton | Planning | The overall objective of this project is the redesign and reconstruction of eleven (11) traffic signals along the Flat Shoals Road corridor to complement the proposed Advanced Traffic Management System (ATMS) along the corridor. Closed Circuit TV (CCTV) cameras will be installed as well as fiber optic drop cables to the cameras and existing traffic signals. Traffic signals will be timed to maintain coordinated traffic flow through the synchronized intersections. The progression of vehicles along the major roadway will be given priority even when the characteristics of the roadway traffic flow and control changes. | NULL | NULL | NULL | July, 2019 | NULL | NULL | Sales Tax | $250,000 | $0 | $250,000 | Green | Green | Active | NULL | NULL | NULL | NULL | NULL | NULL | |
| SUM = 149,527,590 | SUM = 63,061,247 | SUM = 86,466,343 |