| Project ID | Local ID | Project Name Title | Tier | Project Type | Initiatve Type | City | Current Stage | Project Description | Construction Firm Selected | Design Firm Selected | Estimated Design Completion Date | Estimated Start Date For Project | Estimated Construction Completion Date | Estimated Substantial Completion Date | Link To External Website | Primary Funding Source | TSPLOST Budget ($) | TSPLOST Dollars Spent ($) | TSPLOST Dollars Committed (not spent) ($) | Cost Status | Schedule Status | Status | Editor | Project Year | Last Update | State | Address | Creation Date |
| CSF- 1 | RC 100 | Bethsaida Road (Jonesboro Rd to Clayton County Ln) | Tier 1 | Maintenance and Safety Enhancements | TSPLOST | City of South Fulton | Completed | The Bethsaida Road (Jonesboro Rd to Clayton County Ln) to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled. | NULL | Not Applicable | Not Applicable | NULL | November, 2018 | NULL | Sales Tax | $697,059 | $614,322 | $82,737 | Green | Green | Inactive | steve.williams@fultoncountyga.gov | 2018 | 2021-10-12 13:20:26 | NULL | NULL | NULL | |
| CSF- 10 | RC 109 | Rivertown Road (Chattahoochee Hills City limits to Fairburn City Limits) | Tier 1 | Maintenance and Safety Enhancements | TSPLOST | City of South Fulton | Completed | The Rivertown Road (Chattahoochee City Limits to Fairburn City Limits) to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled. | NULL | Not Applicable | Not Applicable | March, 2019 | August, 2019 | NULL | Sales Tax | $872,352 | $726,550 | $145,802 | Green | Green | Active | roussan.francois@fultoncountyga.gov | 2018 | 2021-05-03 16:16:33 | NULL | NULL | NULL | |
| CSF- 100 | RST 208 | Merrywood I-III (LL 159/162 Dist 13) | Tier 1 | Maintenance and Safety Enhancements | TSPLOST | City of South Fulton | Completed | The primary work is to resurface the final asphalt topping layer. The roads (Merrywood Ct, Merrywood Dr, and Smokeridge Dr) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work includes all necessary preparation work (e.g., full depth patching and a single surface treatment). The roads will then have the final asphalt topping layer installed in a manner that will provide uniformity of the asphalt. Milling of the existing asphalt surface is not expected to be required for these roadways. | E R Snell | Not Applicable | Not Applicable | March, 2018 | August, 2018 | Not Applicable | Sales Tax | $94,383 | $97,351 | $-2,968 | Red | Green | Active | roussan.francois@fultoncountyga.gov | 2017 | 2021-05-03 16:40:02 | NULL | NULL | NULL | |
| CSF- 101 | RST 209 | Overlook Camp Creek 1/1A | Tier 1 | Maintenance and Safety Enhancements | TSPLOST | City of South Fulton | Completed | The primary work is to resurface the final asphalt topping layer. The roads (Lost Cove Dr, Minkslide Dr, and War Trace Dr) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work includes all necessary preparation work (e.g., full depth patching and a single surface treatment). The roads will then have the final asphalt topping layer installed in a manner that will provide uniformity of the asphalt. Milling of the existing asphalt surface is not expected to be required for these roadways. | E R Snell | Not Applicable | Not Applicable | March, 2018 | August, 2018 | Not Applicable | Sales Tax | $95,530 | $88,501 | $7,029 | Green | Green | Active | roussan.francois@fultoncountyga.gov | 2017 | 2021-05-03 20:32:52 | NULL | NULL | NULL | |
| CSF- 102 | RST 210 | Parks at Cedar Grove 1/2 of Subdivision | Tier 1 | Maintenance and Safety Enhancements | TSPLOST | City of South Fulton | Completed | The primary work is to resurface the final asphalt topping layer. The roads (Fairmont Way, Misty Walk, Parkland Bend, and Parks Trl) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work includes all necessary preparation work (e.g., full depth patching and a single surface treatment). The roads will then have the final asphalt topping layer installed in a manner that will provide uniformity of the asphalt. Milling of the existing asphalt surface is not expected to be required for these roadways. | E R Snell | Not Applicable | Not Applicable | March, 2018 | August, 2018 | Not Applicable | Sales Tax | $175,000 | $192,027 | $-17,027 | Green | Green | Active | roussan.francois@fultoncountyga.gov | 2017 | 2021-05-03 20:33:33 | NULL | NULL | NULL | |
| CSF- 103 | RST 211 | Preston's Vineyard, (LL 169, Dist 9F) | Tier 1 | Maintenance and Safety Enhancements | TSPLOST | City of South Fulton | Completed | The primary work is to resurface the final asphalt topping layer. The road (Preston's Estates) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work includes all necessary preparation work (e.g., full depth patching and a single surface treatment). The roads will then have the final asphalt topping layer installed in a manner that will provide uniformity of the asphalt. Milling of the existing asphalt surface is not expected to be required for these roadways. | E R Snell | Not Applicable | Not Applicable | March, 2018 | August, 2018 | Not Applicable | Sales Tax | $19,830 | $26,667 | $-6,837 | Red | Green | Active | roussan.francois@fultoncountyga.gov | 2017 | 2021-05-03 20:34:01 | NULL | NULL | NULL | |
| CSF- 104 | RST 212 | Providence Glen < (LL 188 Dist 13) | Tier 1 | Maintenance and Safety Enhancements | TSPLOST | City of South Fulton | Completed | The primary work is to resurface the final asphalt topping layer. The roads within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work includes all necessary preparation work (e.g., full depth patching and a single surface treatment). The roads will then have the final asphalt topping layer installed in a manner that will provide uniformity of the asphalt. Milling of the existing asphalt surface is not expected to be required for these roadways. | E R Snell | Not Applicable | Not Applicable | March, 2018 | August, 2018 | Not Applicable | Sales Tax | $42,960 | $50,772 | $-7,812 | Red | Green | Active | roussan.francois@fultoncountyga.gov | 2017 | 2021-05-03 20:34:18 | NULL | NULL | NULL | |
| CSF- 105 | RST 213 | Renaissance at South Park | Tier 1 | Maintenance and Safety Enhancements | TSPLOST | City of South Fulton | Completed | The primary work is to resurface the final asphalt topping layer. The roads (Avalon Sq, Avalon Blvd, Bucknell Ter, Cabrini Pl, Radford Loop, Rutgers Cir, and Westwood Trl) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work includes all necessary preparation work (e.g., full depth patching and a single surface treatment). The roads will then have the final asphalt topping layer installed in a manner that will provide uniformity of the asphalt. Milling of the existing asphalt surface is not expected to be required for these roadways. | E R Snell | Not Applicable | Not Applicable | March, 2018 | August, 2018 | Not Applicable | Sales Tax | $141,831 | $177,351 | $-35,520 | Red | Green | Active | roussan.francois@fultoncountyga.gov | 2017 | 2021-05-03 20:34:30 | NULL | NULL | NULL | |
| CSF- 106 | RST 214 | Stoneridge 3 | Tier 1 | Maintenance and Safety Enhancements | TSPLOST | City of South Fulton | Completed | Garnet Ave, Sapphire Bend, Topaz Rd and Feldspar Way) within the subdivision will have their final asphalt topping layer resurfaced. The work will include all the necessary preparation work which may include full depth of pavement patching and a surface treatment prior to final topping. Removal of the top asphalt layer (milling) is not expected to be required for these roadways. The roads will then be resurfaced with a uniform layer of asphalt in manner so as to provide uniformity of depth and a smooth transition to existing pavement. After resurfacing, all existing pavement markings such as line striping, crosswalks etc. will be reinstalled. | E R Snell | Not Applicable | Not Applicable | March, 2018 | August, 2018 | Not Applicable | Sales Tax | $168,840 | $89,782 | $79,058 | Green | Green | Active | roussan.francois@fultoncountyga.gov | 2017 | 2021-05-03 20:34:55 | NULL | NULL | NULL | |
| CSF- 107 | RST 216 | Thornwood Park , (LL 132/133 Dis 13) | Tier 1 | Maintenance and Safety Enhancements | TSPLOST | City of South Fulton | Completed | The primary work is to resurface the final asphalt topping layer. The roads (Bigwood Trl, Splitpine Ct, and Old Madison Pl) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work includes all necessary preparation work (e.g., full depth patching and a single surface treatment). The roads will then have the final asphalt topping layer installed in a manner that will provide uniformity of the asphalt. Milling of the existing asphalt surface is not expected to be required for these roadways. | E R Snell | Not Applicable | Not Applicable | March, 2018 | August, 2018 | Not Applicable | Sales Tax | $101,920 | $129,142 | $-27,222 | Green | Green | Active | roussan.francois@fultoncountyga.gov | 2017 | 2021-05-03 20:13:48 | NULL | NULL | NULL | |
| CSF- 108 | RST 215 | St. Joseph Phase 1 | Tier 1 | Maintenance and Safety Enhancements | TSPLOST | City of South Fulton | Completed | The roads (Saint Peter Way, Saint Thomas Court, and Saint Judes Drive) within the subdivision is to resurface the final asphalt topping layer. The roads within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work includes all necessary preparation work (e.g., full depth patching and a single surface treatment). The roads will then have the final asphalt topping layer installed in a manner that will provide uniformity of the asphalt. The subject subdivison was topped through an earlier contract outside TSPLOST funding. | E R Snell | Not Applicable | Not Applicable | NULL | August, 2017 | Not Applicable | Sales Tax | $101,920 | $129,142 | $-27,222 | Green | Green | Active | roussan.francois@fultoncountyga.gov | 2017 | 2021-05-03 16:49:07 | NULL | NULL | NULL | |
| CSF- 109 | RST 217 | Towncreek @ Cedar Grove PH2 | Tier 1 | Maintenance and Safety Enhancements | TSPLOST | City of South Fulton | Completed | The primary work is to resurface the final asphalt topping layer. The roads (Locherby Dr and Lochley Dr) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work includes all necessary preparation work (e.g., full depth patching and a single surface treatment). The roads will then have the final asphalt topping layer installed in a manner that will provide uniformity of the asphalt. Milling of the existing asphalt surface is not expected to be required for these roadways. | E R Snell | Not Applicable | Not Applicable | March, 2018 | August, 2018 | Not Applicable | Sales Tax | $45,998 | $46,579 | $-581 | Green | Green | Active | roussan.francois@fultoncountyga.gov | 2017 | 2021-05-03 20:14:04 | NULL | NULL | NULL | |
| CSF- 11 | RS 367 | Oakley Township | Tier 1 | Maintenance and Safety Enhancements | TSPLOST | City of South Fulton | Completed | The roads (Oakley Road and Red Hawk Run) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled. | NULL | Not Applicable | Not Applicable | NULL | November, 2020 | NULL | Sales Tax | $459,740 | $336,295 | $123,445 | Green | Green | Active | roussan.francois@fultoncountyga.gov | 2019 | 2021-05-03 19:56:29 | NULL | NULL | NULL | |
| CSF- 110 | RS 300 | Ashley Downs | Tier 1 | Maintenance and Safety Enhancements | TSPLOST | City of South Fulton | Completed | The roads (Ashington Court, Ashley Downs Lane, Circle Court, Fox Hall Lane South, Green Bower Lane, Hallie Mill Road, Marcliff Court, Marley Drive, Thornbury Way I) to be resurfaced within the subdivision may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled. | CWM | Not Applicable | Not Applicable | NULL | May, 2018 | NULL | Sales Tax | $431,006 | $377,254 | $53,752 | Green | Green | Inactive | roussan.francois@fultoncountyga.gov | 2018 | 2021-02-06 23:39:18 | NULL | NULL | NULL | |
| CSF- 111 | RS 301 | Beacon Hills | Tier 1 | Maintenance and Safety Enhancements | TSPLOST | City of South Fulton | Completed | The roads (Berry Hill Court, Diann Court, Dianne Court, Dianne Drive, Green Trail, and Greentree Court) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled. | CW Matthews | Not Applicable | Not Applicable | NULL | November, 2021 | NULL | Sales Tax | $124,513 | $89,983 | $34,530 | Green | Green | Active | roussan.francois@fultoncountyga.gov | 2021 | 2023-03-02 14:13:31 | NULL | NULL | NULL | |
| CSF- 112 | RS 302 | Beaver Creek | Tier 1 | Maintenance and Safety Enhancements | TSPLOST | City of South Fulton | Completed | The roads (Beaver Creek Trail and Kimberly Mill Lane) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled. | CWM | Not Applicable | Not Applicable | NULL | June, 2018 | NULL | Sales Tax | $76,623 | $60,231 | $16,392 | Green | Green | Inactive | roussan.francois@fultoncountyga.gov | 2018 | 2021-02-06 23:39:45 | NULL | NULL | NULL | |
| CSF- 113 | RS 303 | Benchmark | Tier 1 | Maintenance and Safety Enhancements | TSPLOST | City of South Fulton | Completed | The roads (Azimuth Court, Bearing Way, Benchmark Drive, Transit Circle, and Traverse Court) within he subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled. | CWM | Not Applicable | Not Applicable | NULL | November, 2018 | NULL | Sales Tax | $130,260 | $166,456 | $-36,196 | Red | Green | Inactive | roussan.francois@fultoncountyga.gov | 2018 | 2021-02-06 23:40:44 | NULL | NULL | NULL | |
| CSF- 114 | RS 304 | Bentwood Trace | Tier 1 | Maintenance and Safety Enhancements | TSPLOST | City of South Fulton | Completed | The roads (Brentwood Court, Fruitwood Trace, and Teakwood Lane) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled. | CWM | Not Applicable | Not Applicable | NULL | May, 2018 | NULL | Sales Tax | $76,623 | $98,773 | $-22,150 | Red | Green | Inactive | roussan.francois@fultoncountyga.gov | 2018 | 2021-02-06 23:41:04 | NULL | NULL | NULL | |
| CSF- 115 | RS 305 | Bethsaida West | Tier 1 | Maintenance and Safety Enhancements | TSPLOST | City of South Fulton | Completed | The roads (Dawn Drive, Lori Lane, Renee Dawn Court, and Sandy Circle) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled. | CWM | Not Applicable | Not Applicable | NULL | May, 2018 | NULL | Sales Tax | $394,610 | $82,362 | $312,248 | Green | Green | Inactive | roussan.francois@fultoncountyga.gov | 2018 | 2021-02-06 23:41:39 | NULL | NULL | NULL | |
| CSF- 116 | RS 306 | Big Creek | Tier 1 | Maintenance and Safety Enhancements | TSPLOST | City of South Fulton | Completed | The roads (Ann Arbor Drive and Arbor Shores Drive) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled. | CW Matthews | Not Applicable | Not Applicable | NULL | August, 2022 | NULL | Sales Tax | $95,779 | $88,571 | $7,208 | Green | Green | Active | roussan.francois@fultoncountyga.gov | 2020 | 2023-03-02 13:36:56 | NULL | NULL | NULL | |
| SUM = 193,906,703 | SUM = 142,040,425,058 | SUM = -141,846,518,355 |