TSPLOSTProjects

Project ID Local ID Project Name Title Tier Project Type Initiatve Type City Current Stage Project Description Construction Firm Selected Design Firm Selected Estimated Design Completion Date Estimated Start Date For Project Estimated Construction Completion Date Estimated Substantial Completion Date Link To External Website Primary Funding Source TSPLOST Budget ($) TSPLOST Dollars Spent ($) TSPLOST Dollars Committed (not spent) ($) Cost Status Schedule Status Status Editor Project Year Last Update State Address Creation Date
CSF- 1 RC 100 Bethsaida Road (Jonesboro Rd to Clayton County Ln) Tier 1 Maintenance and Safety Enhancements TSPLOST City of South Fulton Completed The Bethsaida Road (Jonesboro Rd to Clayton County Ln) to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled. NULL Not Applicable Not Applicable NULL November, 2018 NULL Sales Tax $697,059 $614,322 $82,737 Green Green Inactive steve.williams@fultoncountyga.gov 2018 2021-10-12 13:20:26 NULL NULL NULL
CSF- 10 RC 109 Rivertown Road (Chattahoochee Hills City limits to Fairburn City Limits) Tier 1 Maintenance and Safety Enhancements TSPLOST City of South Fulton Completed The Rivertown Road (Chattahoochee City Limits to Fairburn City Limits) to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled. NULL Not Applicable Not Applicable March, 2019 August, 2019 NULL Sales Tax $872,352 $726,550 $145,802 Green Green Active roussan.francois@fultoncountyga.gov 2018 2021-05-03 16:16:33 NULL NULL NULL
CSF- 100 RST 208 Merrywood I-III (LL 159/162 Dist 13) Tier 1 Maintenance and Safety Enhancements TSPLOST City of South Fulton Completed The primary work is to resurface the final asphalt topping layer. The roads (Merrywood Ct, Merrywood Dr, and Smokeridge Dr) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work includes all necessary preparation work (e.g., full depth patching and a single surface treatment). The roads will then have the final asphalt topping layer installed in a manner that will provide uniformity of the asphalt. Milling of the existing asphalt surface is not expected to be required for these roadways. E R Snell Not Applicable Not Applicable March, 2018 August, 2018 Not Applicable Sales Tax $94,383 $97,351 $-2,968 Red Green Active roussan.francois@fultoncountyga.gov 2017 2021-05-03 16:40:02 NULL NULL NULL
CSF- 101 RST 209 Overlook Camp Creek 1/1A Tier 1 Maintenance and Safety Enhancements TSPLOST City of South Fulton Completed The primary work is to resurface the final asphalt topping layer. The roads (Lost Cove Dr, Minkslide Dr, and War Trace Dr) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work includes all necessary preparation work (e.g., full depth patching and a single surface treatment). The roads will then have the final asphalt topping layer installed in a manner that will provide uniformity of the asphalt. Milling of the existing asphalt surface is not expected to be required for these roadways. E R Snell Not Applicable Not Applicable March, 2018 August, 2018 Not Applicable Sales Tax $95,530 $88,501 $7,029 Green Green Active roussan.francois@fultoncountyga.gov 2017 2021-05-03 20:32:52 NULL NULL NULL
CSF- 102 RST 210 Parks at Cedar Grove 1/2 of Subdivision Tier 1 Maintenance and Safety Enhancements TSPLOST City of South Fulton Completed The primary work is to resurface the final asphalt topping layer. The roads (Fairmont Way, Misty Walk, Parkland Bend, and Parks Trl) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work includes all necessary preparation work (e.g., full depth patching and a single surface treatment). The roads will then have the final asphalt topping layer installed in a manner that will provide uniformity of the asphalt. Milling of the existing asphalt surface is not expected to be required for these roadways. E R Snell Not Applicable Not Applicable March, 2018 August, 2018 Not Applicable Sales Tax $175,000 $192,027 $-17,027 Green Green Active roussan.francois@fultoncountyga.gov 2017 2021-05-03 20:33:33 NULL NULL NULL
CSF- 103 RST 211 Preston's Vineyard, (LL 169, Dist 9F) Tier 1 Maintenance and Safety Enhancements TSPLOST City of South Fulton Completed The primary work is to resurface the final asphalt topping layer. The road (Preston's Estates) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work includes all necessary preparation work (e.g., full depth patching and a single surface treatment). The roads will then have the final asphalt topping layer installed in a manner that will provide uniformity of the asphalt. Milling of the existing asphalt surface is not expected to be required for these roadways. E R Snell Not Applicable Not Applicable March, 2018 August, 2018 Not Applicable Sales Tax $19,830 $26,667 $-6,837 Red Green Active roussan.francois@fultoncountyga.gov 2017 2021-05-03 20:34:01 NULL NULL NULL
CSF- 104 RST 212 Providence Glen < (LL 188 Dist 13) Tier 1 Maintenance and Safety Enhancements TSPLOST City of South Fulton Completed The primary work is to resurface the final asphalt topping layer. The roads within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work includes all necessary preparation work (e.g., full depth patching and a single surface treatment). The roads will then have the final asphalt topping layer installed in a manner that will provide uniformity of the asphalt. Milling of the existing asphalt surface is not expected to be required for these roadways. E R Snell Not Applicable Not Applicable March, 2018 August, 2018 Not Applicable Sales Tax $42,960 $50,772 $-7,812 Red Green Active roussan.francois@fultoncountyga.gov 2017 2021-05-03 20:34:18 NULL NULL NULL
CSF- 105 RST 213 Renaissance at South Park Tier 1 Maintenance and Safety Enhancements TSPLOST City of South Fulton Completed The primary work is to resurface the final asphalt topping layer. The roads (Avalon Sq, Avalon Blvd, Bucknell Ter, Cabrini Pl, Radford Loop, Rutgers Cir, and Westwood Trl) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work includes all necessary preparation work (e.g., full depth patching and a single surface treatment). The roads will then have the final asphalt topping layer installed in a manner that will provide uniformity of the asphalt. Milling of the existing asphalt surface is not expected to be required for these roadways. E R Snell Not Applicable Not Applicable March, 2018 August, 2018 Not Applicable Sales Tax $141,831 $177,351 $-35,520 Red Green Active roussan.francois@fultoncountyga.gov 2017 2021-05-03 20:34:30 NULL NULL NULL
CSF- 106 RST 214 Stoneridge 3 Tier 1 Maintenance and Safety Enhancements TSPLOST City of South Fulton Completed Garnet Ave, Sapphire Bend, Topaz Rd and Feldspar Way) within the subdivision will have their final asphalt topping layer resurfaced. The work will include all the necessary preparation work which may include full depth of pavement patching and a surface treatment prior to final topping. Removal of the top asphalt layer (milling) is not expected to be required for these roadways. The roads will then be resurfaced with a uniform layer of asphalt in manner so as to provide uniformity of depth and a smooth transition to existing pavement. After resurfacing, all existing pavement markings such as line striping, crosswalks etc. will be reinstalled. E R Snell Not Applicable Not Applicable March, 2018 August, 2018 Not Applicable Sales Tax $168,840 $89,782 $79,058 Green Green Active roussan.francois@fultoncountyga.gov 2017 2021-05-03 20:34:55 NULL NULL NULL
CSF- 107 RST 216 Thornwood Park , (LL 132/133 Dis 13) Tier 1 Maintenance and Safety Enhancements TSPLOST City of South Fulton Completed The primary work is to resurface the final asphalt topping layer. The roads (Bigwood Trl, Splitpine Ct, and Old Madison Pl) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work includes all necessary preparation work (e.g., full depth patching and a single surface treatment). The roads will then have the final asphalt topping layer installed in a manner that will provide uniformity of the asphalt. Milling of the existing asphalt surface is not expected to be required for these roadways. E R Snell Not Applicable Not Applicable March, 2018 August, 2018 Not Applicable Sales Tax $101,920 $129,142 $-27,222 Green Green Active roussan.francois@fultoncountyga.gov 2017 2021-05-03 20:13:48 NULL NULL NULL
CSF- 108 RST 215 St. Joseph Phase 1 Tier 1 Maintenance and Safety Enhancements TSPLOST City of South Fulton Completed The roads (Saint Peter Way, Saint Thomas Court, and Saint Judes Drive) within the subdivision is to resurface the final asphalt topping layer. The roads within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work includes all necessary preparation work (e.g., full depth patching and a single surface treatment). The roads will then have the final asphalt topping layer installed in a manner that will provide uniformity of the asphalt. The subject subdivison was topped through an earlier contract outside TSPLOST funding. E R Snell Not Applicable Not Applicable NULL August, 2017 Not Applicable Sales Tax $101,920 $129,142 $-27,222 Green Green Active roussan.francois@fultoncountyga.gov 2017 2021-05-03 16:49:07 NULL NULL NULL
CSF- 109 RST 217 Towncreek @ Cedar Grove PH2 Tier 1 Maintenance and Safety Enhancements TSPLOST City of South Fulton Completed The primary work is to resurface the final asphalt topping layer. The roads (Locherby Dr and Lochley Dr) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work includes all necessary preparation work (e.g., full depth patching and a single surface treatment). The roads will then have the final asphalt topping layer installed in a manner that will provide uniformity of the asphalt. Milling of the existing asphalt surface is not expected to be required for these roadways. E R Snell Not Applicable Not Applicable March, 2018 August, 2018 Not Applicable Sales Tax $45,998 $46,579 $-581 Green Green Active roussan.francois@fultoncountyga.gov 2017 2021-05-03 20:14:04 NULL NULL NULL
CSF- 11 RS 367 Oakley Township Tier 1 Maintenance and Safety Enhancements TSPLOST City of South Fulton Completed The roads (Oakley Road and Red Hawk Run) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled. NULL Not Applicable Not Applicable NULL November, 2020 NULL Sales Tax $459,740 $336,295 $123,445 Green Green Active roussan.francois@fultoncountyga.gov 2019 2021-05-03 19:56:29 NULL NULL NULL
CSF- 110 RS 300 Ashley Downs Tier 1 Maintenance and Safety Enhancements TSPLOST City of South Fulton Completed The roads (Ashington Court, Ashley Downs Lane, Circle Court, Fox Hall Lane South, Green Bower Lane, Hallie Mill Road, Marcliff Court, Marley Drive, Thornbury Way I) to be resurfaced within the subdivision may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled. CWM Not Applicable Not Applicable NULL May, 2018 NULL Sales Tax $431,006 $377,254 $53,752 Green Green Inactive roussan.francois@fultoncountyga.gov 2018 2021-02-06 23:39:18 NULL NULL NULL
CSF- 111 RS 301 Beacon Hills Tier 1 Maintenance and Safety Enhancements TSPLOST City of South Fulton Completed The roads (Berry Hill Court, Diann Court, Dianne Court, Dianne Drive, Green Trail, and Greentree Court) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled. CW Matthews Not Applicable Not Applicable NULL November, 2021 NULL Sales Tax $124,513 $89,983 $34,530 Green Green Active roussan.francois@fultoncountyga.gov 2021 2023-03-02 14:13:31 NULL NULL NULL
CSF- 112 RS 302 Beaver Creek Tier 1 Maintenance and Safety Enhancements TSPLOST City of South Fulton Completed The roads (Beaver Creek Trail and Kimberly Mill Lane) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled. CWM Not Applicable Not Applicable NULL June, 2018 NULL Sales Tax $76,623 $60,231 $16,392 Green Green Inactive roussan.francois@fultoncountyga.gov 2018 2021-02-06 23:39:45 NULL NULL NULL
CSF- 113 RS 303 Benchmark Tier 1 Maintenance and Safety Enhancements TSPLOST City of South Fulton Completed The roads (Azimuth Court, Bearing Way, Benchmark Drive, Transit Circle, and Traverse Court) within he subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled. CWM Not Applicable Not Applicable NULL November, 2018 NULL Sales Tax $130,260 $166,456 $-36,196 Red Green Inactive roussan.francois@fultoncountyga.gov 2018 2021-02-06 23:40:44 NULL NULL NULL
CSF- 114 RS 304 Bentwood Trace Tier 1 Maintenance and Safety Enhancements TSPLOST City of South Fulton Completed The roads (Brentwood Court, Fruitwood Trace, and Teakwood Lane) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled. CWM Not Applicable Not Applicable NULL May, 2018 NULL Sales Tax $76,623 $98,773 $-22,150 Red Green Inactive roussan.francois@fultoncountyga.gov 2018 2021-02-06 23:41:04 NULL NULL NULL
CSF- 115 RS 305 Bethsaida West Tier 1 Maintenance and Safety Enhancements TSPLOST City of South Fulton Completed The roads (Dawn Drive, Lori Lane, Renee Dawn Court, and Sandy Circle) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled. CWM Not Applicable Not Applicable NULL May, 2018 NULL Sales Tax $394,610 $82,362 $312,248 Green Green Inactive roussan.francois@fultoncountyga.gov 2018 2021-02-06 23:41:39 NULL NULL NULL
CSF- 116 RS 306 Big Creek Tier 1 Maintenance and Safety Enhancements TSPLOST City of South Fulton Completed The roads (Ann Arbor Drive and Arbor Shores Drive) within the subdivision to be resurfaced may have either existing concrete curb and gutter sections or will be flush with the shoulder of the road. The work will include all necessary preparation work (e.g., full depth patching, milling, and single surface treatment). The roads will then be resurfaced in a manner that will provide uniformity of the asphalt. After resurfacing, all existing pavement markings such as line striping will be reinstalled. CW Matthews Not Applicable Not Applicable NULL August, 2022 NULL Sales Tax $95,779 $88,571 $7,208 Green Green Active roussan.francois@fultoncountyga.gov 2020 2023-03-02 13:36:56 NULL NULL NULL
SUM = 193,906,703 SUM = 142,040,425,058 SUM = -141,846,518,355