| Project ID | Local ID | Project Name Title | Tier | Project Type | Initiatve Type | City | Current Stage | Project Description | Construction Firm Selected | Design Firm Selected | Estimated Design Completion Date | Estimated Start Date For Project | Estimated Construction Completion Date | Estimated Substantial Completion Date | Link To External Website | Primary Funding Source | TSPLOST Budget ($) | TSPLOST Dollars Spent ($) | TSPLOST Dollars Committed (not spent) ($) | Cost Status | Schedule Status | Status | Editor | Project Year | Last Update | State | Address | Creation Date |
| ALP- 27 | C1800 | HAYNES BRIDGE ROAD CAPACITY IMPROVEMENTS | Tier 1 | Operation and Safety Improvements | TSPLOST | Alpharetta | Design | The Haynes Bridge Corridor is an important collector connecting neighborhoods to the south with schools, GA 400, employment and commercial centers. This project widens Haynes Bridge Road from Mansell Road to Old Alabama Road and will entail a partnership with the City of Johns Creek with Johns Creek having lead role. Proposed improvements consist of adding an additional lane in each direction, landscaping medians, adding turn lanes where appropriate, and adding a multi-use trail to connect to the Big Creek Greenway. | NULL | Lowe Engineers | NULL | NULL | NULL | NULL | http://alpharetta.maps.arcgis.com/apps/MapJournal/index.html?appid=c2930590bb57457b908c8d9ec82caba0§ion=38 | Sales Tax | $69,303 | $59,075 | $10,228 | Green | Green | Active | psewczwicz@alpharetta.ga.us | NULL | 2021-10-13 13:14:16 | NULL | NULL | NULL |
| ALP- 28 | C1631 | MCGINNIS FERRY ROAD CAPACITY IMPROVEMENTS | Tier 1 | Operation and Safety Improvements | TSPLOST | Alpharetta | Design | The proposed project would widen McGinnis Ferry Road from Sargent Road to Union Hill Road/Ronald Reagan Boulevard - a distance of approximately 4.58 miles. The proposed design includes two lanes in each direction with a 20-foot wide raised median, a 16 foot wide urban shoulder along the north with a 10-foot wide multi-use path and a 12-foot wide urban shoulder along the south with a 6-foot wide sidewalk. Stage construction and traffic control devices will be utilized to maintain traffic during construction and may require temporary lane closures. Forsyth County is overseeing the design of the widening project with the Georgia Department of Transportation (GDOT), the City of John''s Creek and the City of Alpharetta providing review and comments on the design. | NULL | Atlas | NULL | NULL | NULL | NULL | http://alpharetta.maps.arcgis.com/apps/MapJournal/index.html?appid=c2930590bb57457b908c8d9ec82caba0§ion=38 | Sales Tax | $8,900,000 | $2,690,654 | $6,209,346 | Green | Green | Active | psewczwicz@alpharetta.ga.us | NULL | 2023-02-17 18:53:46 | NULL | NULL | NULL |
| ALP- 29 | C1715 | BETHANY ROAD AT MAYFIELD ROAD INTERSECTION IMPROVEMENTS | Tier 1 | Operation and Safety Improvements | TSPLOST | Alpharetta | Completed | This project involves intersection operational improvements incorporating a roundabout at the intersection of Bethany Road and Mayfield Road. The design of this project was awarded to Tetra Tech, Inc. in the amount of $127,670 by City Council on December 12, 2016. The conceptual design for this project was presented to City Council on June 5, 2017. As the acquisition of right of way progressed, it became necessary to revise the eastern leg of the roundabout. Change Order #1 was issued on April 2, 2018 which increased the design cost by $9,950 to $137,620. Final plans were delivered to the City on June 22, 2018. City Council awarded this project on November 5, 2018 to CMES. City Council also awarded the construction project management, inspection, and engineering to Atkins North America, Inc. Notice to proceed with construction was issued for July 24, 2019. Construction was delayed due to weather and utility relocations. Construction is complete and contractor has completed punchlist items related to sod and pavement markings. | CMES, Inc. | Tetra Tech, Inc. | June, 2018 | NULL | NULL | NULL | http://alpharetta.maps.arcgis.com/apps/MapJournal/index.html?appid=c2930590bb57457b908c8d9ec82caba0§ion=38 | Sales Tax | $2,258,335 | $2,256,294 | $2,041 | Green | Red | Active | psewczwicz@alpharetta.ga.us | NULL | 2021-10-12 13:33:56 | NULL | NULL | NULL |
| ALP- 30 | C1716 | MORRIS ROAD OPERATIONAL IMPROVEMENTS | Tier 1 | Operation and Safety Improvements | TSPLOST | Alpharetta | Completed | This project provides the appropriate auxiliary lanes to accommodate the heavy traffic flow from both Old Milton Parkway and Webb Bridge Road, as well as pedestrian and bicycle accommodations. The volume of traffic along Morris Road between Old Milton Parkway and Webb Bridge Road has made turning movements difficult and backed-up traffic during peak times. | Vertical Earth, Inc. | Pond & Company | December, 2017 | NULL | NULL | NULL | http://alpharetta.maps.arcgis.com/apps/MapJournal/index.html?appid=c2930590bb57457b908c8d9ec82caba0§ion=38 | Sales Tax | $3,215,476 | $3,215,476 | $0 | Green | Red | Active | psewczwicz@alpharetta.ga.us | NULL | 2021-10-12 13:16:22 | NULL | NULL | NULL |
| ALP- 31 | C1717 | OLD MILTON PARKWAY CAPACITY IMPROVEMENTS | Tier 1 | Operation and Safety Improvements | TSPLOST | Alpharetta | Construction | Project consists of the widening of Old Milton Parkway, from North Point Parkway to Kimball Bridge Road, from four 12’ wide travel lanes to six 12’ wide travel lanes. Excluding the bridges over Big Creek, the widening will occur to the inside, reducing the median separating eastbound and westbound traffic to 20’ in width. Both bridges over Big Creek will be reconstructed. | NULL | AECOM | September, 2022 | NULL | August, 2029 | NULL | https://cleargov.com/georgia/fulton/city/alpharetta/projects/7029/old-milton-parkway-capacity-improvements | Sales Tax | $29,955,202 | $4,955,202 | $25,000,000 | Green | Green | Active | imisbach@alpharetta.ga.us | NULL | 2026-08-19 09:42:34 | NULL | NULL | NULL |
| ALP- 32 | C1714 | BETHANY ROAD AT MID-BROADWELL ROAD INTERSECTION IMPROVEMENTS | Tier 1 | Operation and Safety Improvements | TSPLOST | Alpharetta | Completed | This project involves intersection operational improvements incorporating a roundabout at the intersection of Bethany Road and Mid Broadwell Road. The City has received numerous complaints regarding left turns onto Mid Broadwell Road from motorists traveling south on Bethany Road and from residents of Pindell Glen Subdivision trying to leave their subdivision. Residents have complained about the speed of vehicles on Mid Broadwell Road and have requested a reduction of the speed limit or the installation of a traffic signal or four-way stop. As these options do not meet warrants, a roundabout is proposed to reduce speeds in the area and assist in left-turn movements. The preliminary cost estimate for this project was $1.28 million with funding provided through T-SPLOST (transportation special purpose local option sales tax). The design of this project was awarded to Tetra Tech, Inc. in the amount of $131,170 by City Council on December 12, 2016. The conceptual design for this project was presented to City Council on June 5, 2017. | CMES, Inc. | Tetra Tech, Inc. | January, 2018 | NULL | NULL | NULL | http://alpharetta.maps.arcgis.com/apps/MapJournal/index.html?appid=c2930590bb57457b908c8d9ec82caba0§ion=38 | Sales Tax | $1,368,453 | $1,368,302 | $151 | Green | Red | Active | psewczwicz@alpharetta.ga.us | NULL | 2021-10-12 13:54:18 | NULL | NULL | NULL |
| ALP- 33 | C1713 | KIMBALL BRIDGE ROAD BICYCLE/PEDESTRIAN/OPERATIONAL IMPROVEMENTS | Tier 1 | Operation and Safety Improvements | TSPLOST | Alpharetta | Concept | This project involves pedestrian, bike, and operational improvements along Kimball Bridge Road between Westside Parkway and North Point Parkway connecting residential neighborhoods to Downtown Alpharetta, Avalon, schools, and parks. | NULL | AECOM | NULL | NULL | NULL | NULL | http://alpharetta.maps.arcgis.com/apps/MapJournal/index.html?appid=c2930590bb57457b908c8d9ec82caba0§ion=38 | Sales Tax | $1,359,742 | $1,077,773 | $281,969 | Green | Green | Active | psewczwicz@alpharetta.ga.us | NULL | 2024-01-09 09:58:44 | NULL | NULL | NULL |
| ALP- 34 | C1935 | WINDWARD PARKWAY WESTBOUND WIDENING - NORTH POINT PARKWAY TO GEORGIA 400 | Tier 1 | Operation and Safety Improvements | TSPLOST | Alpharetta | Completed | This is one of two projects which evolved from the conceptual design work comprising the "Windward Parkway Business District/Union Hill Road Capacity Improvements - TSPLOST Project". The project limits are from North Point Parkway to the northbound Georgia 400 on-ramp. Improvements will include: (1) The installation of a third travel lane from North Point Parkway to the northbound Georgia 400 on-ramp. All travel lanes will be 11'' wide. (2) The installation of a 4'' bike lane. (3) The installation of a 6'' wide sidewalk. (4) The lengthening of the existing dual left-turn lanes from westbound Windward Parkway to southbound North Point Parkway. The typical section will seek to match that of the "Windward Parkway Triple Left-Turn Lane at Georgia 400 Interchange" project. On Monday, May 6, 2019 design of the project was awarded to Tetra Tech, Inc. in the amount of $210,500.00. Bids were received on Thursday, May 14, 2020. The project was awarded to Sol Construction, LLC by City Council on Monday, June 15, 2020. | Sol Construction LLC | Tetra Tech, Inc. | February, 2020 | NULL | NULL | NULL | http://alpharetta.maps.arcgis.com/apps/MapJournal/index.html?appid=c2930590bb57457b908c8d9ec82caba0§ion=38 | Sales Tax | $1,302,037 | $1,182,286 | $119,751 | Green | Green | Active | psewczwicz@alpharetta.ga.us | NULL | 2021-10-11 14:52:06 | NULL | NULL | NULL |
| ALP- 35 | C1934 | WINDWARD PARKWAY EASTBOUND WIDENING - WESTSIDE PARKWAY TO NORTH POINT PARKWAY | Tier 1 | Operation and Safety Improvements | TSPLOST | Alpharetta | Construction | This is one of two projects which evolved from the conceptual design work comprising the "Windward Parkway Business District/Union Hill Road Capacity Improvements - TSPLOST Project". The project limits are from Westside Parkway to North Point Parkway. Improvements will include: (1) The installation of a third travel lane from Westside Parkway to the southbound Georgia 400 on-ramp. All travel lanes will be 11'' wide. (2) The installation of a 4'' bike lane. (3) The installation of a 6'' wide sidewalk. The typical section will seek to match that of the "Windward Parkway Triple Left-Turn Lane at Georgia 400 Interchange" project. On Monday, May 6, 2019 design of the project was awarded to Tetra Tech, Inc. in the amount of $302,830.00. Design is complete. Bids were received on Thursday, May 14, 2020. Project was awarded to Sol Construction, LLC by City Council on Monday, June 15, 2020. The Notice to Proceed was issued August 8, 2020 and the project duration is anticipated to be 365 days. | Sol Construction LLC | Tetra Tech, Inc. | February, 2020 | NULL | NULL | NULL | http://alpharetta.maps.arcgis.com/apps/MapJournal/index.html?appid=c2930590bb57457b908c8d9ec82caba0§ion=38 | Sales Tax | $1,639,117 | $1,275,417 | $363,700 | Green | Yellow | Active | psewczwicz@alpharetta.ga.us | NULL | 2021-10-12 12:56:26 | NULL | NULL | NULL |
| ALP- 36 | C1933 | WEBB BRIDGE ROAD BIKE/PED/OPERATIONAL IMPROVEMENTS | Tier 1 | Operation and Safety Improvements | TSPLOST | Alpharetta | Design | This is one of two projects which evolved from the conceptual design work and community meetings comprising the "Academy Street/Webb Bridge Road: Bike/Ped/Operational Improvements - TSPLOST Project". The project limits are from the Big Creek Greenway crossing to Webb Bridge Way. Improvements include: (1) The installation of 8'' wide sidewalks along both sides of Webb Bridge Road. (2) The installation of 4'' bike lanes in both directions of travel along Webb Bridge Road. (3) A 3'' wide "beauty" strip will be provided on each side of Webb Bridge Road between the sidewalk and curb line. 5''x5'' tree wells/grates will be incorporated into this area and adjacent sidewalk. (4) The evaluation of a single-lane roundabout with slip lanes at the intersection with Southlake Drive / Park Bridge Park way. (5) The installation of a single-lane roundabout at the intersection with Webb Bridge Way. (6) The installation of pedestrian lighting along both sides of Webb Bridge Road and roadway lighting at the roundabouts. | NULL | Pond & Company | April, 2021 | NULL | NULL | NULL | http://alpharetta.maps.arcgis.com/apps/MapJournal/index.html?appid=c2930590bb57457b908c8d9ec82caba0§ion=38 | Sales Tax | $875,796 | $814,855 | $60,941 | Green | Green | Active | psewczwicz@alpharetta.ga.us | NULL | 2021-10-13 13:19:05 | NULL | NULL | NULL |
| ALP- 37 | C1932 | ACADEMY STREET BIKE/PED/OPERATIONAL IMPROVEMENTS | Tier 1 | Operation and Safety Improvements | TSPLOST | Alpharetta | Design | This is one of two projects which evolved from the conceptual design work and community meetings comprising the "Academy Street/Webb Bridge Road: Bike/Ped/Operational Improvements - TSPLOST Project". The project limits are from Loxford Lane to Fire Station 81. Improvements will include: (1) The installation of a 6'' wide sidewalk with a 2'' grass strip along the north side of Academy Street to fill the gap between Alpharetta Presbyterian Church. The existing sidewalk along the south side will be maintained though limited portions may require reconstruction. (2) The installation of a 3'' striped shoulder to accommodate bicycles in both directions of travel from Loxford Lane to Wedgewood Drive. (3) The installation of left turn lanes between Loxford Lane and Wedgewood Drive where possible and the installation of landscaped medians between Loxford Lane and Wedgewood Drive where possible. The existing right-turn lanes at Dancliff Lane and Jamestown Trail will remain. | NULL | Pond & Company | August, 2020 | NULL | NULL | NULL | http://alpharetta.maps.arcgis.com/apps/MapJournal/index.html?appid=c2930590bb57457b908c8d9ec82caba0§ion=38 | Sales Tax | $289,575 | $275,490 | $14,085 | Green | Yellow | Active | psewczwicz@alpharetta.ga.us | NULL | 2021-10-13 13:10:33 | NULL | NULL | NULL |
| ALP- 38 | C1708 | GREENWAY EXTENSION TO FORSYTH COUNTY | Tier 1 | Pedestrian and Bike Improvements | TSPLOST | Alpharetta | Completed | This project involves the extension of the Big Creek Greenway north from Windward Parkway to connect to Forsyth County's greenway trail system. Completing this leg of the Big Creek Greenway will result in a trail system that runs more than 14 miles through Roswell, Alpharetta, and Forsyth County. Ultimately the trail system will span from the Chattahoochee River in Roswell to Bethelview Road in Forsyth County. | Integrated Construction and Nobility Inc | Pond & Company | April, 2019 | February, 2020 | June, 2021 | May, 2021 | https://alpharetta.projects.socrata.com/projects/C1708?stageId=Construction&tab=list | Sales Tax | $1,000,000 | $799,437 | $200,563 | Green | Green | Active | kmcdowell@alpharetta.ga.us | 2017 | 2021-10-13 13:13:19 | NULL | NULL | NULL |
| ALP- 39 | C1638 | ACADEMY STREET/WEBB BRIDGE ROAD OPERATIONAL AND PEDESTRIAN/BICYCLE IMPROVEMENTS | Tier 1 | Operation and Safety Improvements | TSPLOST | Alpharetta | Completed | This is the parent project of the Academy Street Bike/Ped/Operational Improvements, Webb Bridge Road Bike/Ped/Operational Improvements and Webb Bridge Road (North Point Parkway to Greenway) projects. This project was for the conceptual layouts preparation for Academy Street and Webb Bridge Road from Alpharetta Presbyterian Church to Webb Bridge Way. | NULL | Pond & Company | January, 2019 | NULL | NULL | NULL | http://alpharetta.maps.arcgis.com/apps/MapJournal/index.html?appid=c2930590bb57457b908c8d9ec82caba0§ion=38 | Sales Tax | $451,828 | $451,828 | $0 | Green | Green | Active | psewczwicz@alpharetta.ga.us | NULL | 2023-02-17 19:36:37 | NULL | NULL | NULL |
| ALP- 40 | C1718 | WINDWARD PARKWAY BUSINESS DISTRICT/UNION HILL ROAD CAPACITY IMPROVEMENTS | Tier 1 | Operation and Safety Improvements | TSPLOST | Alpharetta | Completed | This project was for conceptual layouts preparation on Windward Parkway from Highway 9 to Union Hill Road, and also on Union Hill Road from Windward Parkway to McGinnis Ferry Road. | NULL | Tetra Tech, Inc. | June, 2018 | NULL | NULL | NULL | http://alpharetta.maps.arcgis.com/apps/MapJournal/index.html?appid=c2930590bb57457b908c8d9ec82caba0§ion=38 | Sales Tax | $185,100 | $185,100 | $0 | Green | Green | Active | psewczwicz@alpharetta.ga.us | NULL | 2023-02-17 19:39:13 | NULL | NULL | NULL |
| ALP- 41 | C2104 | WEBB BRIDGE ROAD (NORTH POINT PARKWAY TO GREENWAY) | Tier 1 | Operation and Safety Improvements | TSPLOST | Alpharetta | Completed | Project improvements consist of providing a 10.5’ travel lane, 4’ bike lane, 0.5’ header curb, 6’ planting strip, and 10’ sidewalk along both sides of Webb Bridge Road. Left turn lanes and median landscape islands will be provided where appropriate. Pedestrian lighting and street trees will be provided in the planting strip. | Excellere Construction LLC | Pond & Company | February, 2022 | March, 2024 | January, 2026 | May, 2026 | https://cleargov.com/georgia/fulton/city/alpharetta/projects/6398/webb-bridge-rd-improvements-_-greenway-to-webb-bridge-way-(tsplost_1) | Sales Tax | $17,000,002 | $16,266,099 | $733,903 | Green | Green | Active | imisbach@alpharetta.ga.us | 2022 | 2026-09-11 08:28:03 | NULL | NULL | NULL |
| ALP- 42 | C2054 | GA 400 BRIDGES | Tier 1 | Operation and Safety Improvements | TSPLOST | Alpharetta | Bidding | This project will add aesthetic elements to the bridges over GA 400 along Tradewinds Parkway, Kimball Bridge Road and Webb Bridge Road following the design of Encore Parkway. | NULL | NULL | NULL | NULL | NULL | NULL | http://alpharetta.maps.arcgis.com/apps/MapJournal/index.html?appid=c2930590bb57457b908c8d9ec82caba0§ion=38 | Sales Tax | $4,886,000 | $737,429 | $4,148,571 | Green | Green | Active | psewczwicz@alpharetta.ga.us | NULL | 2021-10-13 13:07:37 | NULL | NULL | NULL |
| ALP- 43 | C2113 | ENCORE GREENWAY GATEWAY | Tier 1 | Operation and Safety Improvements | TSPLOST | Alpharetta | Construction | Establishing a more direct connection to the Big Creek Greenway will help activate the North Point Parkway Corridor. Due to the topographic constraints as well as existing creeks, flood plain, wetlands, sanitary sewer lines, and walking trails/bridges, the 12’ wide greenway trail will be elevated. The approximate length of the Greenway Connection from the intersection of Encore Parkway and North Point Parkway is approximately 1,400 linear feet. Also included in the project is developing focal features to bring attention to the Greenway connection. Design work has commenced, and the layout has been approved. Mayor and Council awarded the contractor $9,148,000.00 for the construction of the raised boardwalk to connect North Point Parkway to the Greenway, a raised elevated canopy walk, Encore Greenway Entry Feature with Plaza, and a Park Plaza adjacent to North Point Parkway. | Georgia Infrastructure Solutions, LLC | AECOM | August, 2023 | NULL | July, 2026 | June, 2026 | https://cleargov.com/georgia/fulton/city/alpharetta/projects/3838/encore-pkwy-greenway-connection-park-tsplost-i | Sales Tax | $10,608,129 | $10,394,856 | $213,273 | Green | Green | Active | imisbach@alpharetta.ga.us | NULL | 2026-09-08 08:06:33 | NULL | NULL | NULL |
| ALP- 44 | C0000 | Adaptive Traffic Signals/ITS | Tier 2 | Maintenance and Safety Enhancements | TSPLOST | Alpharetta | Completed | Adaptive Traffic Signals/ITS | NULL | NULL | Not Applicable | Not Applicable | Not Applicable | Not Applicable | Sales Tax | $0 | $0 | $0 | NULL | NULL | Inactive | kmcdowell@alpharetta.ga.us | NULL | 2021-05-05 13:19:36 | NULL | NULL | NULL | |
| ALP- 45 | C0001 | Milling/Resurfacing | Tier 2 | Maintenance and Safety Enhancements | TSPLOST | Alpharetta | Completed | Milling and Resurfacing | N/A | N/A | Not Applicable | Not Applicable | Not Applicable | Not Applicable | Sales Tax | $0 | $0 | $0 | NULL | NULL | Inactive | kmcdowell@alpharetta.ga.us | NULL | 2021-05-05 13:19:08 | NULL | NULL | NULL | |
| ALP- 46 | C0002 | Sidewalks | Tier 2 | Pedestrian and Bike Improvements | TSPLOST | Alpharetta | Completed | Sidewalks | N/A | N/A | Not Applicable | Not Applicable | Not Applicable | Not Applicable | Sales Tax | $0 | $0 | $0 | NULL | NULL | Inactive | kmcdowell@alpharetta.ga.us | NULL | 2021-05-05 13:20:13 | NULL | NULL | NULL | |
| SUM = 1,384,766,010 | SUM = 142,727,999,592 | SUM = -141,343,233,582 |