TSPLOSTProjects

Project ID Local ID Project Name Title Tier Project Type Initiatve Type City Current Stage Project Description Construction Firm Selected Design Firm Selected Estimated Design Completion Date Estimated Start Date For Project Estimated Construction Completion Date Estimated Substantial Completion Date Link To External Website Primary Funding Source TSPLOST Budget ($) TSPLOST Dollars Spent ($) TSPLOST Dollars Committed (not spent) ($) Cost Status Schedule Status Status Editor Project Year Last Update State Address Creation Date
ALP- 27 C1800 HAYNES BRIDGE ROAD CAPACITY IMPROVEMENTS Tier 1 Operation and Safety Improvements TSPLOST Alpharetta Design The Haynes Bridge Corridor is an important collector connecting neighborhoods to the south with schools, GA 400, employment and commercial centers. This project widens Haynes Bridge Road from Mansell Road to Old Alabama Road and will entail a partnership with the City of Johns Creek with Johns Creek having lead role. Proposed improvements consist of adding an additional lane in each direction, landscaping medians, adding turn lanes where appropriate, and adding a multi-use trail to connect to the Big Creek Greenway. NULL Lowe Engineers NULL NULL NULL NULL http://alpharetta.maps.arcgis.com/apps/MapJournal/index.html?appid=c2930590bb57457b908c8d9ec82caba0§ion=38 Sales Tax $69,303 $59,075 $10,228 Green Green Active psewczwicz@alpharetta.ga.us NULL 2021-10-13 13:14:16 NULL NULL NULL
ALP- 28 C1631 MCGINNIS FERRY ROAD CAPACITY IMPROVEMENTS Tier 1 Operation and Safety Improvements TSPLOST Alpharetta Design The proposed project would widen McGinnis Ferry Road from Sargent Road to Union Hill Road/Ronald Reagan Boulevard - a distance of approximately 4.58 miles. The proposed design includes two lanes in each direction with a 20-foot wide raised median, a 16 foot wide urban shoulder along the north with a 10-foot wide multi-use path and a 12-foot wide urban shoulder along the south with a 6-foot wide sidewalk. Stage construction and traffic control devices will be utilized to maintain traffic during construction and may require temporary lane closures. Forsyth County is overseeing the design of the widening project with the Georgia Department of Transportation (GDOT), the City of John''s Creek and the City of Alpharetta providing review and comments on the design. NULL Atlas NULL NULL NULL NULL http://alpharetta.maps.arcgis.com/apps/MapJournal/index.html?appid=c2930590bb57457b908c8d9ec82caba0§ion=38 Sales Tax $8,900,000 $2,690,654 $6,209,346 Green Green Active psewczwicz@alpharetta.ga.us NULL 2023-02-17 18:53:46 NULL NULL NULL
ALP- 29 C1715 BETHANY ROAD AT MAYFIELD ROAD INTERSECTION IMPROVEMENTS Tier 1 Operation and Safety Improvements TSPLOST Alpharetta Completed This project involves intersection operational improvements incorporating a roundabout at the intersection of Bethany Road and Mayfield Road. The design of this project was awarded to Tetra Tech, Inc. in the amount of $127,670 by City Council on December 12, 2016. The conceptual design for this project was presented to City Council on June 5, 2017. As the acquisition of right of way progressed, it became necessary to revise the eastern leg of the roundabout. Change Order #1 was issued on April 2, 2018 which increased the design cost by $9,950 to $137,620. Final plans were delivered to the City on June 22, 2018. City Council awarded this project on November 5, 2018 to CMES. City Council also awarded the construction project management, inspection, and engineering to Atkins North America, Inc. Notice to proceed with construction was issued for July 24, 2019. Construction was delayed due to weather and utility relocations. Construction is complete and contractor has completed punchlist items related to sod and pavement markings. CMES, Inc. Tetra Tech, Inc. June, 2018 NULL NULL NULL http://alpharetta.maps.arcgis.com/apps/MapJournal/index.html?appid=c2930590bb57457b908c8d9ec82caba0§ion=38 Sales Tax $2,258,335 $2,256,294 $2,041 Green Red Active psewczwicz@alpharetta.ga.us NULL 2021-10-12 13:33:56 NULL NULL NULL
ALP- 30 C1716 MORRIS ROAD OPERATIONAL IMPROVEMENTS Tier 1 Operation and Safety Improvements TSPLOST Alpharetta Completed This project provides the appropriate auxiliary lanes to accommodate the heavy traffic flow from both Old Milton Parkway and Webb Bridge Road, as well as pedestrian and bicycle accommodations. The volume of traffic along Morris Road between Old Milton Parkway and Webb Bridge Road has made turning movements difficult and backed-up traffic during peak times. Vertical Earth, Inc. Pond & Company December, 2017 NULL NULL NULL http://alpharetta.maps.arcgis.com/apps/MapJournal/index.html?appid=c2930590bb57457b908c8d9ec82caba0§ion=38 Sales Tax $3,215,476 $3,215,476 $0 Green Red Active psewczwicz@alpharetta.ga.us NULL 2021-10-12 13:16:22 NULL NULL NULL
ALP- 31 C1717 OLD MILTON PARKWAY CAPACITY IMPROVEMENTS Tier 1 Operation and Safety Improvements TSPLOST Alpharetta Design This Project consists of widening Old Milton Parkway (SR 120) between GA 400 and State Bridge Road to provide a 6-lane divided section. The city is working with GDOT to expedite the project using mostly state and local funds. NULL AECOM September, 2025 NULL NULL NULL http://alpharetta.maps.arcgis.com/apps/MapJournal/index.html?appid=c2930590bb57457b908c8d9ec82caba0§ion=38 Sales Tax $5,579,474 $1,482,208 $4,097,266 Green Green Active psewczwicz@alpharetta.ga.us NULL 2024-01-09 09:57:11 NULL NULL NULL
ALP- 32 C1714 BETHANY ROAD AT MID-BROADWELL ROAD INTERSECTION IMPROVEMENTS Tier 1 Operation and Safety Improvements TSPLOST Alpharetta Completed This project involves intersection operational improvements incorporating a roundabout at the intersection of Bethany Road and Mid Broadwell Road. The City has received numerous complaints regarding left turns onto Mid Broadwell Road from motorists traveling south on Bethany Road and from residents of Pindell Glen Subdivision trying to leave their subdivision. Residents have complained about the speed of vehicles on Mid Broadwell Road and have requested a reduction of the speed limit or the installation of a traffic signal or four-way stop. As these options do not meet warrants, a roundabout is proposed to reduce speeds in the area and assist in left-turn movements. The preliminary cost estimate for this project was $1.28 million with funding provided through T-SPLOST (transportation special purpose local option sales tax). The design of this project was awarded to Tetra Tech, Inc. in the amount of $131,170 by City Council on December 12, 2016. The conceptual design for this project was presented to City Council on June 5, 2017. CMES, Inc. Tetra Tech, Inc. January, 2018 NULL NULL NULL http://alpharetta.maps.arcgis.com/apps/MapJournal/index.html?appid=c2930590bb57457b908c8d9ec82caba0§ion=38 Sales Tax $1,368,453 $1,368,302 $151 Green Red Active psewczwicz@alpharetta.ga.us NULL 2021-10-12 13:54:18 NULL NULL NULL
ALP- 33 C1713 KIMBALL BRIDGE ROAD BICYCLE/PEDESTRIAN/OPERATIONAL IMPROVEMENTS Tier 1 Operation and Safety Improvements TSPLOST Alpharetta Concept This project involves pedestrian, bike, and operational improvements along Kimball Bridge Road between Westside Parkway and North Point Parkway connecting residential neighborhoods to Downtown Alpharetta, Avalon, schools, and parks. NULL AECOM NULL NULL NULL NULL http://alpharetta.maps.arcgis.com/apps/MapJournal/index.html?appid=c2930590bb57457b908c8d9ec82caba0§ion=38 Sales Tax $1,359,742 $1,077,773 $281,969 Green Green Active psewczwicz@alpharetta.ga.us NULL 2024-01-09 09:58:44 NULL NULL NULL
ALP- 34 C1935 WINDWARD PARKWAY WESTBOUND WIDENING - NORTH POINT PARKWAY TO GEORGIA 400 Tier 1 Operation and Safety Improvements TSPLOST Alpharetta Completed This is one of two projects which evolved from the conceptual design work comprising the "Windward Parkway Business District/Union Hill Road Capacity Improvements - TSPLOST Project". The project limits are from North Point Parkway to the northbound Georgia 400 on-ramp. Improvements will include: (1) The installation of a third travel lane from North Point Parkway to the northbound Georgia 400 on-ramp. All travel lanes will be 11'' wide. (2) The installation of a 4'' bike lane. (3) The installation of a 6'' wide sidewalk. (4) The lengthening of the existing dual left-turn lanes from westbound Windward Parkway to southbound North Point Parkway. The typical section will seek to match that of the "Windward Parkway Triple Left-Turn Lane at Georgia 400 Interchange" project. On Monday, May 6, 2019 design of the project was awarded to Tetra Tech, Inc. in the amount of $210,500.00. Bids were received on Thursday, May 14, 2020. The project was awarded to Sol Construction, LLC by City Council on Monday, June 15, 2020. Sol Construction LLC Tetra Tech, Inc. February, 2020 NULL NULL NULL http://alpharetta.maps.arcgis.com/apps/MapJournal/index.html?appid=c2930590bb57457b908c8d9ec82caba0§ion=38 Sales Tax $1,302,037 $1,182,286 $119,751 Green Green Active psewczwicz@alpharetta.ga.us NULL 2021-10-11 14:52:06 NULL NULL NULL
ALP- 35 C1934 WINDWARD PARKWAY EASTBOUND WIDENING - WESTSIDE PARKWAY TO NORTH POINT PARKWAY Tier 1 Operation and Safety Improvements TSPLOST Alpharetta Construction This is one of two projects which evolved from the conceptual design work comprising the "Windward Parkway Business District/Union Hill Road Capacity Improvements - TSPLOST Project". The project limits are from Westside Parkway to North Point Parkway. Improvements will include: (1) The installation of a third travel lane from Westside Parkway to the southbound Georgia 400 on-ramp. All travel lanes will be 11'' wide. (2) The installation of a 4'' bike lane. (3) The installation of a 6'' wide sidewalk. The typical section will seek to match that of the "Windward Parkway Triple Left-Turn Lane at Georgia 400 Interchange" project. On Monday, May 6, 2019 design of the project was awarded to Tetra Tech, Inc. in the amount of $302,830.00. Design is complete. Bids were received on Thursday, May 14, 2020. Project was awarded to Sol Construction, LLC by City Council on Monday, June 15, 2020. The Notice to Proceed was issued August 8, 2020 and the project duration is anticipated to be 365 days. Sol Construction LLC Tetra Tech, Inc. February, 2020 NULL NULL NULL http://alpharetta.maps.arcgis.com/apps/MapJournal/index.html?appid=c2930590bb57457b908c8d9ec82caba0§ion=38 Sales Tax $1,639,117 $1,275,417 $363,700 Green Yellow Active psewczwicz@alpharetta.ga.us NULL 2021-10-12 12:56:26 NULL NULL NULL
ALP- 36 C1933 WEBB BRIDGE ROAD BIKE/PED/OPERATIONAL IMPROVEMENTS Tier 1 Operation and Safety Improvements TSPLOST Alpharetta Design This is one of two projects which evolved from the conceptual design work and community meetings comprising the "Academy Street/Webb Bridge Road: Bike/Ped/Operational Improvements - TSPLOST Project". The project limits are from the Big Creek Greenway crossing to Webb Bridge Way. Improvements include: (1) The installation of 8'' wide sidewalks along both sides of Webb Bridge Road. (2) The installation of 4'' bike lanes in both directions of travel along Webb Bridge Road. (3) A 3'' wide "beauty" strip will be provided on each side of Webb Bridge Road between the sidewalk and curb line. 5''x5'' tree wells/grates will be incorporated into this area and adjacent sidewalk. (4) The evaluation of a single-lane roundabout with slip lanes at the intersection with Southlake Drive / Park Bridge Park way. (5) The installation of a single-lane roundabout at the intersection with Webb Bridge Way. (6) The installation of pedestrian lighting along both sides of Webb Bridge Road and roadway lighting at the roundabouts. NULL Pond & Company April, 2021 NULL NULL NULL http://alpharetta.maps.arcgis.com/apps/MapJournal/index.html?appid=c2930590bb57457b908c8d9ec82caba0§ion=38 Sales Tax $875,796 $814,855 $60,941 Green Green Active psewczwicz@alpharetta.ga.us NULL 2021-10-13 13:19:05 NULL NULL NULL
ALP- 37 C1932 ACADEMY STREET BIKE/PED/OPERATIONAL IMPROVEMENTS Tier 1 Operation and Safety Improvements TSPLOST Alpharetta Design This is one of two projects which evolved from the conceptual design work and community meetings comprising the "Academy Street/Webb Bridge Road: Bike/Ped/Operational Improvements - TSPLOST Project". The project limits are from Loxford Lane to Fire Station 81. Improvements will include: (1) The installation of a 6'' wide sidewalk with a 2'' grass strip along the north side of Academy Street to fill the gap between Alpharetta Presbyterian Church. The existing sidewalk along the south side will be maintained though limited portions may require reconstruction. (2) The installation of a 3'' striped shoulder to accommodate bicycles in both directions of travel from Loxford Lane to Wedgewood Drive. (3) The installation of left turn lanes between Loxford Lane and Wedgewood Drive where possible and the installation of landscaped medians between Loxford Lane and Wedgewood Drive where possible. The existing right-turn lanes at Dancliff Lane and Jamestown Trail will remain. NULL Pond & Company August, 2020 NULL NULL NULL http://alpharetta.maps.arcgis.com/apps/MapJournal/index.html?appid=c2930590bb57457b908c8d9ec82caba0§ion=38 Sales Tax $289,575 $275,490 $14,085 Green Yellow Active psewczwicz@alpharetta.ga.us NULL 2021-10-13 13:10:33 NULL NULL NULL
ALP- 38 C1708 GREENWAY EXTENSION TO FORSYTH COUNTY Tier 1 Pedestrian and Bike Improvements TSPLOST Alpharetta Completed This project involves the extension of the Big Creek Greenway north from Windward Parkway to connect to Forsyth County's greenway trail system. Completing this leg of the Big Creek Greenway will result in a trail system that runs more than 14 miles through Roswell, Alpharetta, and Forsyth County. Ultimately the trail system will span from the Chattahoochee River in Roswell to Bethelview Road in Forsyth County. Integrated Construction and Nobility Inc Pond & Company April, 2019 February, 2020 June, 2021 May, 2021 https://alpharetta.projects.socrata.com/projects/C1708?stageId=Construction&tab=list Sales Tax $1,000,000 $799,437 $200,563 Green Green Active kmcdowell@alpharetta.ga.us 2017 2021-10-13 13:13:19 NULL NULL NULL
ALP- 39 C1638 ACADEMY STREET/WEBB BRIDGE ROAD OPERATIONAL AND PEDESTRIAN/BICYCLE IMPROVEMENTS Tier 1 Operation and Safety Improvements TSPLOST Alpharetta Completed This is the parent project of the Academy Street Bike/Ped/Operational Improvements, Webb Bridge Road Bike/Ped/Operational Improvements and Webb Bridge Road (North Point Parkway to Greenway) projects. This project was for the conceptual layouts preparation for Academy Street and Webb Bridge Road from Alpharetta Presbyterian Church to Webb Bridge Way. NULL Pond & Company January, 2019 NULL NULL NULL http://alpharetta.maps.arcgis.com/apps/MapJournal/index.html?appid=c2930590bb57457b908c8d9ec82caba0§ion=38 Sales Tax $451,828 $451,828 $0 Green Green Active psewczwicz@alpharetta.ga.us NULL 2023-02-17 19:36:37 NULL NULL NULL
ALP- 40 C1718 WINDWARD PARKWAY BUSINESS DISTRICT/UNION HILL ROAD CAPACITY IMPROVEMENTS Tier 1 Operation and Safety Improvements TSPLOST Alpharetta Completed This project was for conceptual layouts preparation on Windward Parkway from Highway 9 to Union Hill Road, and also on Union Hill Road from Windward Parkway to McGinnis Ferry Road. NULL Tetra Tech, Inc. June, 2018 NULL NULL NULL http://alpharetta.maps.arcgis.com/apps/MapJournal/index.html?appid=c2930590bb57457b908c8d9ec82caba0§ion=38 Sales Tax $185,100 $185,100 $0 Green Green Active psewczwicz@alpharetta.ga.us NULL 2023-02-17 19:39:13 NULL NULL NULL
ALP- 41 C2104 WEBB BRIDGE ROAD (NORTH POINT PARKWAY TO GREENWAY) Tier 1 Operation and Safety Improvements TSPLOST Alpharetta Construction This project will include the design of a new bridge over Big Creek to replace the existing vehicular and pedestrian bridges and of a 10'' wide multi-use trail with a 6'' wide planting strip along Webb Bridge Road from east of North Point Parkway to the Big Creek Greenway culvert under Webb Bridge Road. Street trees and pedestrian lighting will be provided along the shoulders. The design will seek to preserve the existing streetscape along the frontage of East Gate Subdivision. The new bridge will provide two 10.5'' travel lanes, header curb, 2'' separation (stamped concrete or concrete pavers) and a 10'' multi-use trail. Bike accommodations will be provided on the roadway from east of North Point Parkway to west of the proposed new bridge over Big Creek. At that point, bicyclists will be merged onto the multi-use trails. Refined concept plans and decision matrix were submitted on February 15, 2021. The design team was given direction to move forward with the "Alternate 3" concept based on this information. Excellere Construction LLC Pond & Company February, 2022 NULL NULL NULL http://alpharetta.maps.arcgis.com/apps/MapJournal/index.html?appid=c2930590bb57457b908c8d9ec82caba0§ion=38 Sales Tax $692,508 $382,143 $310,365 Green Green Active psewczwicz@alpharetta.ga.us NULL 2021-10-13 13:20:05 NULL NULL NULL
ALP- 42 C2054 GA 400 BRIDGES Tier 1 Operation and Safety Improvements TSPLOST Alpharetta Bidding This project will add aesthetic elements to the bridges over GA 400 along Tradewinds Parkway, Kimball Bridge Road and Webb Bridge Road following the design of Encore Parkway. NULL NULL NULL NULL NULL NULL http://alpharetta.maps.arcgis.com/apps/MapJournal/index.html?appid=c2930590bb57457b908c8d9ec82caba0§ion=38 Sales Tax $4,886,000 $737,429 $4,148,571 Green Green Active psewczwicz@alpharetta.ga.us NULL 2021-10-13 13:07:37 NULL NULL NULL
ALP- 43 C2113 ENCORE GREENWAY GATEWAY Tier 1 Operation and Safety Improvements TSPLOST Alpharetta Design The goal of the Encore Greenway Gateway project is to improve the connectivity (safety and simplicity) to the Big Creek Greenway from the intersection of Encore Parkway and North Point Parkway. Project will provide connectivity of the Big Creek Greenway to the west side of GA 400 and introduce a gateway feature to bring attention to the greenway. Project status meeting was held on January 10, 2022. AECOM is working on the construction plans and Design team is communicating with Recreation/Parks/Cultural Services and NFCID regarding the selection of railing, benches, garbage cans, bike racks, etc. A revised completion date of design will be examined once the City obtains access to the property and the design teams finishes all of the necessary soil borings. Design of the project is currently on-hold. NULL AECOM NULL NULL NULL NULL http://alpharetta.maps.arcgis.com/apps/MapJournal/index.html?appid=c2930590bb57457b908c8d9ec82caba0§ion=38 Sales Tax $628,096 $155,569 $472,527 Green Green Active psewczwicz@alpharetta.ga.us NULL 2026-05-04 15:23:46 NULL NULL NULL
ALP- 44 C0000 Adaptive Traffic Signals/ITS Tier 2 Maintenance and Safety Enhancements TSPLOST Alpharetta Completed Adaptive Traffic Signals/ITS NULL NULL Not Applicable Not Applicable Not Applicable Not Applicable Sales Tax $0 $0 $0 NULL NULL Inactive kmcdowell@alpharetta.ga.us NULL 2021-05-05 13:19:36 NULL NULL NULL
ALP- 45 C0001 Milling/Resurfacing Tier 2 Maintenance and Safety Enhancements TSPLOST Alpharetta Completed Milling and Resurfacing N/A N/A Not Applicable Not Applicable Not Applicable Not Applicable Sales Tax $0 $0 $0 NULL NULL Inactive kmcdowell@alpharetta.ga.us NULL 2021-05-05 13:19:08 NULL NULL NULL
ALP- 46 C0002 Sidewalks Tier 2 Pedestrian and Bike Improvements TSPLOST Alpharetta Completed Sidewalks N/A N/A Not Applicable Not Applicable Not Applicable Not Applicable Sales Tax $0 $0 $0 NULL NULL Inactive kmcdowell@alpharetta.ga.us NULL 2021-05-05 13:20:13 NULL NULL NULL
SUM = 1,336,287,302 SUM = 142,586,760,300 SUM = -141,250,472,998