        <ProjectID>FA- 18</ProjectID>
        <LocalID></LocalID>
        <ProjectNameTitle>SR 14/Senoia Road Traffic Signal Project</ProjectNameTitle>
        <Tier>Tier 1</Tier>
        <ProjectType>Quick Response</ProjectType>
        <InitiatveType>TSPLOST</InitiatveType>
        <City>Fairburn</City>
        <CurrentStage>Completed</CurrentStage>
        <ProjectDescription>Operation and Safety Improvements in City of Fairburn - To Be Determined

11/10/2020: There are several reasons why the District does not recommend a signal to be installed at this location. The reasons why can be a bit difficult to explain because there is a lot to consider when it comes to signalizing an intersection but basically the intersection does not meet vehicular or pedestrian volume thresholds needed to warrant a signal and the number of correctable crashes also do not meet the necessary threshold to warrant installation of a signal. This intersection seems to be congested during “peak hours” of the day, and all other hours have very little volume. Adding a signal at this location would cause unnecessary delay to the surrounding roadway network that already appears to have signalized intersections that may not be needed. 
Josh Montefusco
GDOT, District 7
Traffic Operations Manager
JMontefusco@dot.ga.gov 

Revised TE Report submitted to GDOT on 05/02/2025. 
If a Pedestrian Hybrid Beacon is the final recommendation, Railroad coordination may not be required. 
</ProjectDescription>
        <ConstructionFirmSelected></ConstructionFirmSelected>
        <DesignFirmSelected>Pond & Company</DesignFirmSelected>
        <EstimatedDesignCompletionDate></EstimatedDesignCompletionDate>
        <EstimatedStartDateForProject></EstimatedStartDateForProject>
        <EstimatedConstructionCompletionDate></EstimatedConstructionCompletionDate>
        <EstimatedSubstantialCompletionDate></EstimatedSubstantialCompletionDate>
        <LinkToExternalWebsite></LinkToExternalWebsite>
        <PrimaryFundingSource>Sales Tax</PrimaryFundingSource>
        <TSPLOSTBudget($)>$200,000</TSPLOSTBudget($)>
        <TSPLOSTDollarsSpent($)>$15,530</TSPLOSTDollarsSpent($)>
        <TSPLOSTDollarsCommitted(notspent)($)>$184,470</TSPLOSTDollarsCommitted(notspent)($)>
        <CostStatus>Gray</CostStatus>
        <ScheduleStatus>Gray</ScheduleStatus>
        <Status>Active</Status>
        <Editor>lthompson@fairburn.com</Editor>
        <ProjectYear>2020</ProjectYear>
        <LastUpdate>2026-08-31 10:23:18</LastUpdate>